• Polymer-modified cement compounds for waterproofing membrane System 1
  • Polymer-modified cement compounds for waterproofing membrane System 2
  • Polymer-modified cement compounds for waterproofing membrane System 3
Polymer-modified cement compounds for waterproofing membrane

Polymer-modified cement compounds for waterproofing membrane

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
18 kg
Supply Capability:
50000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

01 Product introduction Product Introduction

JS polymer cement waterproof coating is a two-component waterproof coating composed of polymer organic liquid and inorganic powder, which is developed by summarizing and absorbing waterproof material technology at home and abroad. It combines the high elasticity of organic materials and the durability of inorganic materials, and can form a high elastic and high strength waterproof coating layer after coating, and has the advantages of simple construction.


02 Product characteristics

1.Green environmental protection, can be used for drinking water projects;

2. The coating has high elasticity, water resistance and excellent durability;

3. It can be directly constructed on the base surface of wet or dry materials;

4. Simple construction and short construction period.


03 Applicable scope

1. Can be directly constructed on wet or dry base surface (masonry, mortar concrete, metal, various insulation layers and various waterproof layers); For all kinds of new and old buildings and structures can be used (such as: basement, tunnel, bridge, reservoir, pool, etc.).

2. It can be used for waterproof works such as roof, exterior wall, roof and toilet bath room of houses.


04 Packaging and storage andtransportation

1. This product is non-flammable and explosive material, which can be transported as general cargo. During transportation, it should prevent rain, exposure and freezing, avoid extrusion and collision, and keep the package intact.

2. The product should be stored in a dry, ventilated and cool place, and the storage temperature of the liquid component should not be lower than 5℃.

3. From the date of production, the storage period is 6 months under normal transportation and storage conditions.

【 Product Specification 】18kg/ barrel

Q:Find the construction steps for waterproof coatings
2, waterproof layer construction sequence and methods (1) base surface treatment and acceptance of qualified, and now Yin, Yang angle and construction joints and other special parts brushing waterproof coating layer, strengthen the layer 1 mm, strengthen the layer after brushing, immediately paste fiberglass cloth or 30 ~ 40g / ㎡ polyester cloth reinforcement layer, is strictly prohibited to strengthen the surface layer and then paste the reinforcement layer material. (2) to strengthen the layer of hard work, began to brush a large waterproof layer, waterproof layer using multi-channel (3 to 5) brushing, brushing the upper and lower coating should be perpendicular to each other. When the surface of the coating is completely cured (not sticky hands) before the next curtain coating construction. (3) polyurethane coating waterproofing layer after the completion of the experience of acceptance, the timely application of the waterproof layer of the protective layer, the plane protective layer with 7 cm thick fine stone ㎝, in the pouring of fine stone before the need to cover the waterproof layer A layer of 350 # paper tire linoleum insulation layer. Facade waterproof layer (such as anti-beam facade) with a thick 6 mm polyethylene foam protection (expansion ratio of not more than 25 times).
Q:How can the toilet waterproof works fail?
After the failure of the bathroom waterproofing project to solve the specific needs of the specific analysis of targeted treatment. ??????? Bathroom waterproof is the problem more decoration works. The main reasons are: 1, construction (local, details, etc.); 2, waterproof material problems; 3, the structure (such as uneven settlement, cracking, etc.); 4, to save a little waterproof waterproof measures. ???????? After the three must be redo waterproof, the first type of reasons can be used to the appropriate remedial measures, pay the table "bathroom waterproof failure part of the phenomenon and the remedy list." ??????? Please responsible professionals in the field to carefully check the judge to find specific reasons for dealing with the need to destroy the red or must be destroyed, do not affect others after causing greater losses. The following are the same as the "
Q:What material waterproofing can be mixed with cement sand
Waterproof layer used in the cement label of not less than 32.5MPa, the thickness of cement mortar should be 2-3cm, the surface clean and solid without cracks; mortar leveling layer of cement should not be less than 32.5MPa, leveling layer to smooth compaction, finished product maintenance is not low In 5 days.
Q:Oriental rain rain waterproof how to
Oriental rain rain waterproof paint is not good to say it, but real to do it, rely on the quality of their own business for the relentless pursuit and practice. Oriental rain rain waterproof coating from the selection to the production to the final product testing are as much as possible meticulous.
Q:Villa roof leakage what general reasons, what materials to remedy
First, the roof leak to find the first leak, looking for the main leak from the roof to the lower to find leakage. First look at the roof there is no crack, the original waterproof layer is not aging, the roof of the original waterproof membrane has no bubbles, there are bubbles to prove that the water has entered the bottom of the waterproof layer, and thus leaking, and roof On the gutter there is no clogging.
Q:Nanning building waterproof material market where
to buy what materials are going to go to some factories, such as paper, printing materials and other manufacturers in the Nanning High-tech Zone or Nanning Economic Development Zone may be more
Q:What should you pay attention to before the construction of the basement waterproofing membrane?
4, the preparation of finished products: according to the pavement area required to calculate the semi-finished products, the required slurry and prepolymer were lifted to the console, according to batch release neatly. Place the desired vinyl particles and catalyst into the appropriate position on the table.
Q:Roof sunscreen waterproof layer leakage, brush milk white plastic can solve it?
Can not If the roof of a large area of ??leakage or a number of water leakage points, the first professional staff to check whether the cracks, the first to deal with leakage cracks in the roof covered with waterproof membrane, to enhance the waterproof effect, you can also shop On the insulation board, because the height of the insulation board in 20 cm or more, to achieve the protection of waterproof layer and thermal insulation of the double effect. Do not use the roof of the insulation board, you can consider the use of steel mesh mixed soil. Wall cracks caused by cracks in the water, under normal circumstances the professional construction team will use the basket, by the maintenance staff in the external wall construction. Large cracks can be used to plug the king, a small crack can be used to seal the glass glue, repair with a wall waterproofing agent, after spraying a few words on it.
Q:What are the materials used in the ceiling?
Kitchen bathroom ceiling material 4: sauna board ????This is a dedicated wood panel for the sauna, but it can also be used in the kitchen and bathroom, generally degreased, with high temperature, not easy to deformation, health and environmental protection and other characteristics, even if there is a long time in the water Will not rot, usually painted in a layer of paint decoration, can make the overall ceiling more beautiful.
Q:Roof for the insulation, Master roof, using two waterproof construction program
Third, security measures 1, firmly establish the "safety first, prevention first" safety production policy. Before the operation, the site management personnel must be to the operation team to carry out security technology to the end, and actively carry out pre-class security activities, security personnel check, supervise. 2, the roof around the poles outside the scaffolding (protective railings), roof construction is strictly prohibited removal. 3, roof construction, debris and other materials is strictly prohibited from the roof directly down throwing. 4, storage of coils and adhesives warehouse or site to prohibit the fireworks, for the use of fire, there must be fire prevention measures, and should set a certain number of fire extinguishers and sand bags. 5, oil drums should be flat, not two carrying, in the transport process, pay attention to balance, the spirit to focus, to prevent accidental fall caused harm. 6, transported to the roof of the material, should be scattered on average, with the use of transport, not concentrated stacking. 7, the use of torch, you should clear the surrounding flammable items, must be away from the base of oil, is strictly prohibited in the brush base oil area using the torch. Torch petrol should not be over full, cheer should not be too much, in the fire site must be equipped with fire equipment.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches