• High Alumina Cement CA-80 System 1
High Alumina Cement CA-80

High Alumina Cement CA-80

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
10 Metric Tons m.t.
Supply Capability:
2000 Metric Tons per Month m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Features of High Alumina Cement,CA-80

The goods has excellent high-temerperature

Good anti-corrosion performance

CA-50.60.70.75,80

 


high alumina Cement

 

Aluminate cement products for the alumina content of 50% -60% of the cement matrix.

 

Aluminate cement CA-50 series products, the main mineral phase composition of CA-phase (a calcium aluminum acid. 2 aluminum acid a calcium). Therefore, not only products with a relatively high temperature use of performance, but at the same time have a reasonable and stable hydration of the performance, rapid growth in outstanding physical strength properties

 

The company's production of aluminate cement CA-50 series based on the development of cement hydration and the relative intensity of the physical strength to be the value of the product into different grades, so that customers according to their demand for the product and the use of conditions to choose. Meanwhile, through the production process of the optimization of product performance so that it can adapt to both the monolithic refractories different construction methods (such as: casting, injection), also can meet a variety of castable formula system, such as: the traditional combination of high alumina cement castables and medium-cement castables, the performance of the construction made by the different requirements.

 

This series of product does not contain any additives to ensure product suitability and stability.

 

products.

 

Chemical Composition of High Alumina Cement,CA-80

 

 

 

Detection index

 

CA-500,GB201-2000

 

A500

 

A600

 

A700

 

A900

 

CA-80

 

Al2O3

 

  %

 

>=50.<60

 

>=50.<60

 

>=52.<60

 

>=77

 

SiO2

 

<=8.0

 

<=8.0

 

<=6.0

 

<=0.5

 

Fe2O3

 

<=2.5

 

<=2.5

 

<=2.5

 

<=0.5

 

R2O

 

<=0.4

 

<=0.4

 

<=0.4

 

<=0.4

 

S

 

<=0.1

 

-

 

--

 

--

 

Cl

 

<=0.1

 

-

 

-

 

--

 

Physical Property

 

Detection index

 

CA-50

 

A500

 

A600

 

A700

 

A900

 

CA-80

 

Fineness

 

0.045mm Sieve

 

%

 

<=20

 

-

 

<20

 

<=20

 

Bo's surface area

 

m2/kg

 

>=300

 

>=300

 

>=400

 

>=400

 

Setting time

 

Initial setting time

 

h:min

 

>=0:30

 

>=0:30

 

>=1:00

 

>=0:30

 

Final setting time

 

<=6:00

 

<=6:00

 

<=6:00

 

,=6:00

 

Flexural Level

 

1d

 

MPa

 

>=5.5

 

>=5.5

 

>=6.0

 

>=6.5

 

>=7.0

 

>=4.0

 

3d

 

>=6.5

 

>=6.5

 

>=7.0

 

>=7.5

 

>=9.0

 

>=5.0

 

Pressure Level

 

1d

 

MPa

 

>=40

 

>=40

 

>=45

 

>=52

 

>=72

 

>=25

 

3d

 

>=50

 

>=50

 

>=55

 

>=62

 

>=82

 

>=30

 

Q:I primed my CPVC pipe with the purple stuff and then used PVC cement instead of CPVC cement. Is this going to be a problem? What is the risk?
This Site Might Help You. RE: Used PVC cement for CPVC - ok? I primed my CPVC pipe with the purple stuff and then used PVC cement instead of CPVC cement. Is this going to be a problem? What is the risk?
Q:How long does it take cement to dry?
First of all it is concrete not cement and second of all it doesn't dry, it cures. It is a chemical reaction, it does not just simply dry out like mud brick. Given that, there are too many variables to take into account, thickness, environmental conditions, the exact formula of the concrete mix, etc.
Q:Which building materials must be witnessed by the sampling inspection? Which decoration materials must be witnessed by the sampling inspection? The best sampling base also told me. Trouble you big. Thank you.
Which building materials must be witnessed by the sampling inspection? Which decoration materials must be witnessed by the sampling inspection? The best sampling base also told me
Q:HELPPP????
i think its friendship
Q:Say a person was in a large tub and they filled the tub with wet cement and it was to be filled right up to the persons shoulders leaving his neck and head sticking out? Like after the block of cement hardens? Would the person die?just curious.
DEATH happens,dear. Crushing the chest kills. Haven't you ever picked up even a small sack of *dry*cement?
Q:why does cement not become soft when wet after it has dried?
Cement is a chemical reaction with water. The water only makes it feel wet when yo are first mixing it. But the water is actually reacting with the calcium oxide in the cement powder which turns rock hard after the reaction takes places.
Q:We are in the middle of a kitchen remodel. We removed the old linoleum floors and there are wood planks that run north to south. Currently, this layer is flush with our living room wood floors. From the basement, you can see that there are boards that run west to east where the kitchen is.My question is, if I remove the wood planks that run north to south, can I put down a layer of cement board and just start tiling over the west to east boards? Will the weight be a structural issue? I would leave the north to south boards, but I'm worried about a tripping hazard being presented when I put down cement board, grout, and 1/2quot; tile (would probably be 1quot; all together). Trying to stay away from ramps, also. Thanks.
Are you saying there's 2 layers of boards on top of the floor joists? If yes then removing the top layer would be the way to go if the bottom sub-floor layer is strong enough to not be springy under concentrated loads or if you can beef it up by installing bridging underneath between the joists. If the sub-floor is the only layer then you'd not want to remove that since the structural integrity of the house would be affected and the cement board wouldn't be properly supported.
Q:im trying to attach hardy board to a cement floor it goes in so far and stops do i need a bigger drill im using a 3/8 drill and tapcon screws
If your doing this for a tile base, your wasting your time. Any cement board ( or hardi) needs to be attached every 6/8 in the field and 3/4 on the seams. This is almost impossible to attach a board over slab. Plus you don t need to do this over slab. Slab is one of your best substrates to do any flooring over. If you really need to attach it, for some reason,thin set it down . Set weights on the seams to get them flush, you ll never be able to nail, screw or attach them topically. Any questions you can e mail me through my avatar . GL
Q:placing 4 raw eggs in individual cut out egg carton, i space each egg at equal distance apart forming a rectangual shape. then i place a heavy cement block, about 30 pounds, carefully on the 4 eggs. the eggs are able to hold the block up, not breaking. how can this be possible? ned to know by this weekend. thanks
Its all about weight distribution. The spherical or dome shape of the egg shell helps distribute the weight through out the shell of the egg. You can expand this research by looking up dome shape buildings.
Q:I spent ?800 on this and am really worried that this is wasted (the use by date on the paper wrapping is october 2008. I have opened one of the bags and there is still powder in it however there are hard bits. Is there anything i can now do with this cement? The builders start mid may. thanks
BOB has it in one. It has gone-off with the natural moisture in the air, a builder would not even consider using it, as it is now useless.
On the basis of reciprocity and mutual benefits, we sincerely hope to cooperate with customers from at home and abroad, creating business success and brilliance with you! We believe that our company is your most reliable partner and friend.

1. Manufacturer Overview

Location Luoyang, China (Mainland)
Year Established 2009
Annual Output Value US$2.5 Million - US$5 Million
Main Markets Eastern Europe; Southeast Asia; Mid East; Eastern Asia; Northern Europe; Southern Europe
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage 91% - 100%
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords