Steel-plastic Geogrid with Convex node for mine
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 888 m²
- Supply Capability:
- 280000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Structure of Steel-plastic Geogrid with Convex node for mine description :
Made of steel-plastic straps with arabesquitic on the surface , it can bear high tensile strength .This material has considerable tensile strength in longitudinal and lateral directions. This chain structure can effectively bear and diffuse forces on soil and is applicable to large area permanent load bearing foundation as a reinforce.
Features of Steel-plastic Geogrid with Convex node for mine:
Homogenous structure, low creepage ,anti-aging and resisting acid and alkaline.
Application of Steel-plastic Geogrid with Convex node for mine :
Make reinforce treatment for various of soft soil foundation to evenly distribute load stress and reduce unevensettlement , it is easy to wash coal . used in highway ,railway,port,airport, municipacl and projects of supporting in the recovery working face of coal mined and ladeway in the coal mine .
Specification of Steel-plastic Geogrid with Convex node for mine
TGSG15-15,TGSG20-20,TGSG25-25,TGSG30-30,TGSG35-35,TGSG40-40,BP15-15MS,HPP20-20MS, HBPP25-25MS,HBPP30-30MS,HBPP35-35MS,HBPP40-40MS
Width : 1M,2M,3M,4M.
Length: 50m,100,
Color: black
Packaging & Delivery of Steel-plastic Geogrid with Convex node for mine: Each roll is wrapped in a woven bag then into container Or Packed as customers' requests.
Production periods of Steel-plastic Geogrid with Convex node for mine : within 10 days after receiving the deposit
Introduction of CNBM
China National Building Materials (Group) Corporation (CNBM) is a state-owned enterprise in charge of administrative affairs in China building materials industry. Established in 1984, CNBM is a large group corporation of building materials with total assets of RMB 25 billion and a total staff of 30,000. Now CNBM owns more than 200 subsidiaries in and abroad the country, including wholly-owned corporations and joint ventures.
FAQ of geosynthetics :
What is geosynthetics ?
Geosynthetics form a perfect erosion control fabric used extremely widely in civil engineering to stabilize and reinforce slopes and soil under or next to roads, railways, dams, water reservoirs etc.. They can be easily applied which minimizes the time of construction, as well as they limit the resources and materials necessary.
What kinds of geosynthetics we have ?
Non-woven geotextile, geogrids, geocells, GCL, Geomembranes, Geonets, Geocomposites etc .
What is the geosynthetics used for ?
Hydraulic
Lagooning and Water Treatment, Ornamental Ponds, Golf Courses
Aquaculture and Desalination,Water Lagoons,Tanks, Reservoirs, Liquid Waste,Floating Cover Solutions, Drainage and Filtration
Environment
Tailing ponds, Leach mining,Landfills,Landfill Capping,Protection against corrosion,Vertical Barriers
Civil Works
Erosion Control,Secondary Containment,Tunnels,Linear and Surface Works,Consolidation of Margins,Soil Reinforcement,Soil Separation.
Building - Parkings,Roofing,Soundproofing
- Q: A complete set of basement waterproof construction program
- First, the basement of the external walls of water leakage project engineering basement waterproofing standard GB50108-2001 "underground engineering waterproof technical specifications" secondary waterproof rating. Basement exterior wall waterproof structure with self-waterproof concrete plus coil waterproof, 50 thick polystyrene board protective layer.
- Q: Eastern rainbow waterproof how to do
- especially small places to pay attention, such as: sewer such as. And then dry about 10 hours or more, (see the environment may be, like a dry) so repeated 3 side painting is appropriate.
- Q: Find the construction steps for waterproof coatings
- 1, base surface treatment (1) roof structure After the completion of concrete pouring, should be repeated water compaction, so that the surface of the grass-roots level, the flatness with 2m to check the ruler, ruler and grass-roots gap of not more than 5 mm, and only allow gentle changes. (2) the base surface of the pores, rugged, honeycomb, gap, sand, etc., should be promptly treated, the base surface must be clean, no floating slurry, no water beads, no water; when the base surface appears more than 0.3 mm cracks , Should rush each 10 cm brushing 1 mm thick polyurethane coating waterproof layer, and then set the polyurethane cloth reinforcement layer, and finally brushing waterproof layer. (3) all the corners are used 5 × 5㎝ 1: 2.5 cement mortar for chamfering, the angle made R = 10 mm rounded corners.
- Q: Do you use the waterproof material on the building to be harmful to the human body?
- Your pores, the respiratory tract, the lungs, will be hurt, when young do not feel out, the consequences more powerful than smoking.
- Q: Oriental rain rain waterproof how to
- Originally only a few hundred hours, they have done 3,000 hours of anti-aging test, until each test are qualified to the market. So the East Rainbow waterproof coating is absolutely trustworthy waterproof material brand.
- Q: How does the finished ventilator manufacturer waterproof?
- do not play any silicone and tape, to avoid the silicone tape aging caused by leakage hazards. Can be done once and for all.
- Q: There is no formaldehyde in the finished putty
- In addition, the addition of redispersible latex powder in the putty powder will make the putty have stronger adhesion and mechanical properties, outstanding water resistance, permeability, as well as excellent alkali resistance, abrasion resistance, and can improve water retention Sex, increase the opening time, enhance the durability.
- Q: FRP finished brush on what can be waterproof do not fade
- On the surface of the gel coat it is, a lot of gel coat points, the specific performance of what you want, you can communicate with the supplier
- Q: How can the toilet waterproof works fail?
- Can only do a new waterproof, and now have engaged in the base of the waterproof coating, the effect is very good. It is best to ask professionals to do their own difficult.
- Q: Finished house bathroom waterproof household acceptance should be how to accept?
- 4: coating waterproof layer coating evenly, the thickness of the product to meet the technical requirements, the general thickness of not less than 1.5mm not exposed at the end.
Send your message to us
Steel-plastic Geogrid with Convex node for mine
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 888 m²
- Supply Capability:
- 280000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords