• Polyester PET PP Non Woven Landscape Geotextile System 1
  • Polyester PET PP Non Woven Landscape Geotextile System 2
  • Polyester PET PP Non Woven Landscape Geotextile System 3
Polyester PET PP Non Woven Landscape Geotextile

Polyester PET PP Non Woven Landscape Geotextile

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Three Layer Breathable Membrane

Breathable membrane is thermal laminated by the high polymer material in the middle layer . Paving on the top of  the insulation system, it can strengthen the water tightness of the building, as well  as to eliminate humidity inside the containment by the unique breath ability,   thus  to  retain the duration of building effectively , playing a part  in thermal insulation,  energy conservation and living environmental improvement.

We pay high attention to the quality of products, advance production equipments, perfect detection means, sound ISO system, powerful ability on technical  research and management formed the preeminent “ Shanquan”  quality.

EN13859-1



Q: Cabinet is to buy finished products, or directly to the decoration company to do?
Do the cabinet can be in accordance with your size, finished cabinet moldy, which is not necessarily. You have to buy some of the Well
Q: Home improvement waterproofing problem
3, waterproof as to do more than 2 centimeters of closed water 24 hours or more closed water test, check whether there is leaking and dampness downstairs phenomenon.
Q: How do you make waterproofing in the kitchen and bathroom?
Kitchen and toilet to do waterproof, it is recommended to use kitchen and toilet waterproof paste, it is specifically for the kitchen and toilet water and easy to seepage yin and yang angle, pipe, sanitary ware, floor drain and other parts of the development, special materials, so waterproof Ordinary waterproof material is better, and waterproof coating construction is more convenient, only need to brush 2-3 times, the thickness of 1.2-1.5MM on it. Specific construction methods are as follows: 1, will penetrate the root, floor drain and other cracks, need to repair the site cut into "V" shape, and clean, sprinkler moist; 2, the [infiltration of crystalline repair mortar] add water (water and ash weight ratio of 1: 2 ~ 3) mixed evenly, in the early condensate before (5 minutes) to repair the construction, the root of the pipe, the floor drain, yin and yang, Should be made r angle; 3, repair mortar after the final setting, the [durable waterproof paste] powder and liquid material mixing evenly, put it aside for 3 minutes, and then stir evenly after brushing on the base surface, should be cross brush twice, and so on The first time after the dry, can be carried out the second time construction; 4, after the completion of anti-stamped, 48 hours after the closed water test.
Q: Js waterproof coating without powder can brushing
3. Construction: brush with a brush or brush directly to the JS waterproof coating on the base surface, the intensity of the use of uniform, can not leak; if used for moisture, just brush a layer; for waterproof, To three layers. When the first layer of JS waterproof coating dry to just sticky hands (usually 1-2 hours), you can brush the second layer, every two layers of brushing direction should be straight to the intersection;
Q: Roof for the insulation, Master roof, using two waterproof construction program
Third, security measures 1, firmly establish the "safety first, prevention first" safety production policy. Before the operation, the site management personnel must be to the operation team to carry out security technology to the end, and actively carry out pre-class security activities, security personnel check, supervise. 2, the roof around the poles outside the scaffolding (protective railings), roof construction is strictly prohibited removal. 3, roof construction, debris and other materials is strictly prohibited from the roof directly down throwing. 4, storage of coils and adhesives warehouse or site to prohibit the fireworks, for the use of fire, there must be fire prevention measures, and should set a certain number of fire extinguishers and sand bags. 5, oil drums should be flat, not two carrying, in the transport process, pay attention to balance, the spirit to focus, to prevent accidental fall caused harm. 6, transported to the roof of the material, should be scattered on average, with the use of transport, not concentrated stacking. 7, the use of torch, you should clear the surrounding flammable items, must be away from the base of oil, is strictly prohibited in the brush base oil area using the torch. Torch petrol should not be over full, cheer should not be too much, in the fire site must be equipped with fire equipment.
Q: What are the key points and contents of the quality control of waterproof material?
4, high-polymer modified asphalt waterproofing membrane: check the counterfeit effective and simple method is to cut the film wrapped down and then placed in the refrigerator freezer placed 3 hours after the removal, gently forced to break will be broken, and the national standard Require material low temperature flexibility to reach -20 ℃.
Q: What is the car material so that the car can be waterproof, in the rain will not leak in?
?B. printing, inkjet, photo, screen printing and other technology: refers to the computer will be vector or pixel images into the machine, the machine in accordance with the graphics inkjet or screen technology will color ink printing or screen in a transparent or white base film, And then through the cutting edge along the edge of the pattern; at present most of the manufacturing enterprises (such as motorcycles, electric bicycles, etc.) mass production car stickers are used screen printing process;
Q: Why should the use of high pressure perfusion waterproof plugging method
Due to uneven settlement of buildings and other factors, resulting in deformation of the building structure cracking, leakage phenomenon, for the repair of this situation, you can use a new foreign plugging construction technology - high pressure grouting waterproof repair technology.
Q: Villa roof leakage what general reasons, what materials to remedy
First, the roof leak to find the first leak, looking for the main leak from the roof to the lower to find leakage. First look at the roof there is no crack, the original waterproof layer is not aging, the roof of the original waterproof membrane has no bubbles, there are bubbles to prove that the water has entered the bottom of the waterproof layer, and thus leaking, and roof On the gutter there is no clogging.
Q: Waterproof material water leakage construction should pay attention to what
2, wall treatment · Wall treatment to do about 300mm high waterproof coating, to prevent water infiltration wall back tide. · Bathroom between the wall and the ground (plane and elevation) brushing height should be greater than 100mm. · The height of the shower room in the bathroom is not less than 1800mm. · If there is a bathtub, the height of the wall adjacent to the bathtub should be 300mm higher than that of the bathtub. · Waterproof height of tub is not less than 800mm. · The height of the squat should be more than 900mm. For the transformation of the toilet wall and self-built light wall, the proposed height of the waterproof to do the top.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords