• Tower Crane TC7034 Max. lifting weight 12T. System 1
  • Tower Crane TC7034 Max. lifting weight 12T. System 2
  • Tower Crane TC7034 Max. lifting weight 12T. System 3
  • Tower Crane TC7034 Max. lifting weight 12T. System 4
  • Tower Crane TC7034 Max. lifting weight 12T. System 5
  • Tower Crane TC7034 Max. lifting weight 12T. System 6
Tower Crane TC7034 Max. lifting weight 12T.

Tower Crane TC7034 Max. lifting weight 12T.

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Quick Details


Feature: Tower Crane                          Condition: New                                           Max.Lifting Load: 12T

Span: 70m                                             Place of Origin: China(Mainland) 

Brand Name: CMAX                              Model Number: TC7034         

 

Packaging & Delivery


Packaging Detail: Nude package          Delivery Detail: 25-30days

 

Specifications

  

● Max. working range 70m, tip lifting weight 3.4T and Max. lifting weight 12T.


● Slewing mechanism and trolleying mechanism all take VFD+PLC technical control.


● Outstanding in working efficiency, operating speed and stability. Reduce future maintenance cost.

 

 

FAQ

 

Q: What is the difference between CNBM and CMAX?

A: CNBM stands for China National Building Materials (Group) Corporation, which is established in 1984, is the largest state-owned group corporation of building material & machinery with a total asset of 15 billion USD and a staff of 100000.

CMAX is the brand name of CNBM Group’s construction products, C stands for China and Max stands for Maximum.

 

Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.

Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……

Third if there are special needs, CNBM could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


 

 

 

To Lead The Revoluation of International Trade

Q:How to improve tower crane industry in china?
Powerful okorder ) manufacturing standards according to the rules of tower crane industry market economy. ?? Manufacturing industry is a huge system, the formation of a broad face, not one or two companies can do a good job. Powerful alliances to promote the group is a good idea, but it can not Arbitrarily arranged association, we must do things according to the market economy laws. A lot of problems are not necessarily be resolved by the professional industry, you can use the cross-industry solution.
Q:But theres always someone who gets a prize everytime. Its so unfair!lol
I win about 3 times outta 5. I watch sbongbob too. At the moment, I'm watching Jimmy Nuetron. lol
Q:I work a few blocks away and my window faces the building, now shrouded in black netting and scaffolding. I cannot comprehend how that crane got up there!!
Probably a climbing crane. You build a scaffold with your crane, then climb the scaffold with the crane, anchor, then take the scaffold apart re-assemble it above your current position. Repeat until top of building is reached.
Q:What does tower crane jacking up mean?
First of all, the boom and trim balance arm, unlock the top are connected with a lifting sleeve frame with the standard section, start lifting system, lifting jack will superstructure.Jiangsu Zhendong port machinery manufacturing heavy port machinery is a professional manufacturer of mechanism
Q:How to build a strong paper crane?
Fact: paper is relatively strong when you pull on it, but when you push on it, it easily crumples. Build your crane out of several bars. Bars that are being pushed upon by the weight need to resist the crumpling. A good way to do this is to roll a sheet of paper into a tube form to make the bars. Bars that are only being pulled on don't need to be more than a sheet of paper. A frame cranes are simple to make: www.lni.wa /wisha/rules/generalsafety/images/24_d2_a-frame.gif
Q:Whats does the japanese crane symbolize?
The Japanese crane symbolizes serenity and hope. It is a legend in Japan that if you fold 1000 paper cranes, any wish will come true. There is a story about a girl named Sadako who died from radiation in Hiroshima after WWII who tried to fold 1000 paper cranes to be brought back to health. She nearly folded 1000, and died before then. People come to Hiroshima still today with 1000 folded paper cranes to honor Sadako.
Q:Calculate the work the crane performs.
Crane work = weight to be lifted x 6.95 m Weight to be lifted = 2.75x10^3 N + 1.20 m^3 (2.00 x 10^3 kg/m^3) (9.8) = 2750 + 23520 = 26270 Therefore, Crane work = 26270 x 6.95 = 182576.5 J
Q:I was half way through this book and had to stop reading it because school got in the way. I'm back to reading it and I got to the part where Katniss made a noose and tied it around a dummy and showed it to the Gamemakers. And she wrote 'Seneca Crane'. I don't remember who that was. If it was even a person, I guess it was. But can you just explain who or what 'Seneca Crane' is and why Katniss would do that? Thanks.
He was the previous head gamemaker, and President Snow basically declared that he had Seneca Crane executed. Crane allowed Peeta and Katniss to live and cut off the final moment of the berries, which to Snow was an act of defiance. I think Katniss hanging the doll was just a symbolic act, implying that the gamemakers are really all just puppets under the Capitol.
Q:Minimum QTZ63 tower crane special electric box open for many A
QTZ63 tower crane with air and leakage protection:Minimum three-phase air switch not less than 100A; at the same time leakage protector is not less than 100A three-phase four wire system leakage protection.Maximum three-phase air switch not greater than 150A; at the same time, leakage protector is not more than 150A of three-phase four wire system leakage protection.
Q:Between these two authors, I dont see any similarities in literary style, specifically focusing on The Moon is Down and The Red Badge of Courage. Maybe observing from a different point of view (yours) could help me.Also, if there is no significant similarity, do similarities exist in setting, conflict, or characters instead?Thanks!
Try Maggie: A girl of the streets, which is the novel I think of for Crane being part of the Realist school. I think you can also see Steinbeck, in his selection of subjects as being in that same school of fiction. So less for their style and more for their choice of subjects.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords