• Tower Crane with 50m Height Jib Length 60m System 1
  • Tower Crane with 50m Height Jib Length 60m System 2
  • Tower Crane with 50m Height Jib Length 60m System 3
  • Tower Crane with 50m Height Jib Length 60m System 4
  • Tower Crane with 50m Height Jib Length 60m System 5
  • Tower Crane with 50m Height Jib Length 60m System 6
Tower Crane with 50m Height Jib Length 60m

Tower Crane with 50m Height Jib Length 60m

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
50 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Maximum Lifting Weight:
10T
Maximum Lifting Height(M):
180m
Rated Loading Capacity:
10T
Span:
60M
Rated Load Moment:
1250KN.M

Characteristics of QTZ80-8T Self-erecting Tower Crane

1) QTZ80 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 180m.

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

4) The crane has complete set safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.

Tower Crane with 50m Height Jib Length 60m

Tower Crane with 50m Height Jib Length 60m

Main Technical Parameter

TC 6010 Tower crane

Height: 50m,

Boom: 60m,

Tip load capacity:1.0t;

Max. Load: 10 ton.,

Standard mast (LxWxH):1.7x1.7x2.5m;Steel:

Q345B manganese steel;

HS: 8426200000 ;

Package: nude-packing

Packaging & Delivery

Packaging Details:40 HC containers; 
Wodden cage for electrical parts 
Steel box for small parts
Delivery Detail:20-25 days after received the advanced money

Tower Crane with 50m Height Jib Length 60m

China National Building Materials (Group) Corporation (CNBM), established in 1984,

now is one of the largest state-owned group corporation in China, dealing with building

materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD

and total staff is more than 100,000.

CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment

produced by CNBM are compliant with the National level quality standard, and wins great

reputation for their endurable performance in worldwide markets.

Key reason for CNBM's achievements:

Research and Development (R&D)

- Our own systems of production engineering.

- Production design from the concept to the engineering details.

- National level research academy for various building equipment for over 30 years.

- Continuous development of new solutions and products adapted to the requirements of our clients.

- Technical experts with abundant experience in relative fields.

Production

- Complete quality control system.

- Nearly 20 years experiences in manufacturing fields.

- Full production capacity up to 1000 tower cranes annually (with various load from 4tons to 40tons ).

Commercial & marketing

- Customer-oriented philosophy.

- Full international business experiences.

- Global network & localization strategy.

- Professional & high efficiency team.

Service

Under the guidance of "globalization + localization" strategy, in most of our main markets, the marketing

operations & after sales services are carried out by CNBM's local partner companies.

To provide enough & timely support to the local partners, CNBM has set up 6 branches in the world (with more to c,

ensuring the best services to the end-users along with high quality equipment.

Our Service Branch

CNBM INTERNATIONAL CORPORATION U.A.E BRANCH

CNBM INTERNATIONAL CORPORATION K.S.A BRANCH

CNBM INTERNATIONAL CORPORATION IRAN BRANCH

CNBM (U.S.A) CORPORATION

CNBM INTERNATIONAL(RUSSIA)CORPORATION

CNBM INDIA CORPORATION

CNBM NIGERIA CORPORATION

CNBM KAZAKHSTAN BRANCH

CNBM VIETNAM COMPANY LIMITED

UNDER CONSTRUCTION OTHER PLACES

Service

----Providing timely delivery, standby engineers are ready to slove any of your problem

----Providing all-embraced warranty of products quality, worksite installation guidance

----Providing ample spare parts and training of operation and maintenance

----Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

Q: I know, do you know?
They build it on the ground, raise it up with another crane, and then lift the counter weights up!
Q: Can anyone give me a very accurate slow step-by-step video of how to make the prison break crane perfectly?Its hard to follow the directions on a diagram online so I need a good video.
They used a helicopter to break out of prison. Breakout with Charles Bronson and Robert Duvall (1975)
Q: would 2 500 ton crawler cranes be able to lift a 854 ton bridge section 80 feet in the air?
Sorry, okorder /... The farther from the center of rotation of the House, the less a crane can lift. That same crane can only lift 57.5 tons at 22 meters from the center of rotation of the House. Ben
Q: I was watching house m.d. When I notice house walking with a crane I asked a friend who knows house and has seen it but dosent remember why and how. why is he?
It's a cane not a crane. Whew! To summarize, what happened to House's leg was that there was muscle death of the leg. He should have had it amputated, but he didn't. Instead, he wound up with a nearly useless, and chronically painful leg. Stacy, as a participant in this demise, well, I guess the relationship was all downhill from there. House realizes it was all his fault. If he would have just got the amputation, he wouldn't have screwed it all up Stacy is his ex-wife.
Q: Cranes nowadays are MASSIVE! but something that has been bugging me for ages is how do they get the massive crane bit at the top down once they have finished constructing the skyscraper/building?
i hope this link helps
Q: hes been here for about 3 years. i want to feed him but i don't know what it eats. is there any way i could help him eat? i think he is going to die if we destroy the last of the forest area where we live.
Want to help? Don’t feed them, which draws them deeper into dangerous urban areas. And try to keep reflective surfaces covered. Following these tips could keep these majestic citizens a little safer. In 2002, the Florida Fish and Wildlife Conservation Commission made it illegal to feed sandhill cranes. Why Is Feeding Cranes A Bad Idea? Cranes fed by humans can become aggressive toward people. In several instances, children have been attacked by cranes. Cranes fed by humans also have been known to damage window screens and do other property damage. This behavior is probably a response of the birds to seeing their reflection, bringing out a territorial defense behavior (scratching at windows or shiny automobiles). Cranes also are more likely to tangle in human garbage in areas populated by people. Cranes attracted to people's yards for feed are put at risk as they walk across roads. Many sandhill cranes are killed each year on Florida roads. Cranes are also more likely to crash into power lines in urban areas where such aerial hazards are concentrated. Attracting cranes to urban areas increases the threat of predation (especially to young cranes) by dogs or cats. Further, the cranes' diets, which normally are quite diverse, are disrupted when they eat one food item (such as corn), consistently. Heavy pesticide use in urban lawns also is of concern. Young sandhill cranes have died from pesticide poisoning. It's Never a Good Idea to Feed Wildlife People inadvertently put cranes in harms way when they attract these birds with feed. Florida sandhill cranes have an abundance of natural foods (insects and small animals) and they do not need handouts from humans. There are many reasons why cranes should not be intentionally fed by humans, so I hope this gives you a few you can communicate to these well-intentioned people. The bottom line message: For the good of the cranes, please do not feed them.
Q: Something confuses me in dragon ball:When roshi has a flash back, he says crane didn't turn evil until after mutaito fails to kill piccolo, but in the filer where goku goes back in time, crane is an asshole before picolo and roshi referred to him as a friend before the piccolo incident.Also, why in the piccolo flash back are roshi and crane bald but in the filler do they have hair and glasses?Also, why in the filler does crane have a different outfit in the filler than the other students but in the piccolo flash back he has the same outfit as roshi?
The idea is that Crane Hermit is a selfish man that would do anything to get what he wants. In the past, Master Mutaito was there to ram some discipline in his head and have him under control. Following the events of his death and the defeat of King Piccolo, nothing could really stop him from being a selfish jerk again. Roshi probably didn't mention Crane being bad before King Piccolo's arrival because he wasn't really evil before it either. He was selfish and greedy, but not outright despicable as later... at least not that much. Roshi seeing Crane as a friend might imply that Crane had some redeeming qualities during his years as Roshi's rival under Mutaito's guidance. About their baldness, I think they shaved their heads after a while due to how monks and some martial artists tend to shave their heads. That or it's a plot hole due/filler error. It's again either a plot hole/filler error or they just switched outfits once they reached a certain level of their training, just like how you gain a different color of band as you progress in Judo and Karate.
Q: Can anyone tell me the location of the barn in the water color Waiting Refuge by Jon Crane or how to find it
Well, to help you it would be necessary to look at the picture, I suppose, and none of the internet search results are still valid.
Q: I will soon have folded my 1000th paper crane. What should I do with them after I am done?
wow. thats amazing. im sure you spent a long time making them so i wouldnt do anything destructive to them. i think you should make a big necklace out of them and hang them in your room or on top of a door or in the garden... or.... etc.. especially if the paper cranes have different colors, it would look rather pretty and vibrant.
Q: What do lattice boom and hydraulic boom in cranes mean?
LATTICE BOOM: See first link. This is where the boom (the portion used to support the load) is made like a lattice ... i.e. interconnected trusses and girders. The cables for lifting the load are run from the base of the boom to the load over pulleys/gears located at the boom's tip. The boom itself is NOT adjustable in length or in angle. HYDRAULIC BOOM: See second link. This crane uses hydraulics to adjust either the length of the boom, or the angle at which the boom joints intersect. It looks more like a single beam construction, although its probably closer to a tube type design (hydraulics may be inside or outside the arm). The load is raised/lowered by cables operating at the end of the boom ... not necessarily tied back to the bottom of the boom.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords