• 12 Tons Luffing Jib Tower Crane QD228 With 50m Jib System 1
  • 12 Tons Luffing Jib Tower Crane QD228 With 50m Jib System 2
  • 12 Tons Luffing Jib Tower Crane QD228 With 50m Jib System 3
12 Tons Luffing Jib Tower Crane QD228 With 50m Jib

12 Tons Luffing Jib Tower Crane QD228 With 50m Jib

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
2 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Quick Details

  • Feature: Tower Crane

  • Condition: New

  • Application: All construction projects

  • Max. Lifting Load: 12 tons

  • Max. Lifting Height: 148.02m

  • Place of Origin: China (Mainland)

  • Brand Name: CNBM

  • Certification: ISO9001, CE, GOST, CU-TR

  • After-sales Service Provided: Engineers available to service machinery overseas

 

 

Main Fatures


TC6520 tower crane is a company based GB/T5031-2008 《tower crane》design and manufacture of a construction crane. It can be applied widely in high-rise civilian building, bridge and water-conservancy project, big-span industrial workshop and high-rise building, etc. the tower crane is high level slewing self-erecting tower crane which adopts horizontal jib and trolley-jib. The main features as follows:

Height of the tower crane is confirmed according to height of building, lifting ability of the tower crane is independent of height.

The tower crane with features as high working speed, stead work condition and high efficiency.

Hoisting jib has 55m or 60m and 65m three ranges. This meets project needs more widely.

The eyeshot of cab is well, and the cab is installed independently,which creat preferable working condition for handlers.

Location of the tower crane is reasonable, and the externality of the crane is beautiful.

Lifting jib adopts rigid double tension bars with features as light structure.

the operation is simple and the maintenance is convenient


 

12 Tons Luffing Jib Tower Crane QD228 With 50m Jib

12 Tons Luffing Jib Tower Crane QD228 With 50m Jib

12 Tons Luffing Jib Tower Crane QD228 With 50m Jib

12 Tons Luffing Jib Tower Crane QD228 With 50m Jib

 

Specification Parameter

12 Tons Luffing Jib Tower Crane QD228 With 50m Jib

Packaging & Delivery

Packaging Details:Standard export packing, cartons/wooden cases/nude in containers
Delivery Detail:30-50 days after contract and payment in advance

 

Our Services
 

----Providing timely delivery, standby engineers are ready to slove any of your problem

----Providing all-embraced warranty of products quality, worksite installation guidance

----Providing ample spare parts and training of operation and maintenance

----Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: It's a local company in Omaha that seriously could be the next Starbuck's if they ever expand.
It won't expand if Starbucks have their way. They have driven all their competiton out of business. I hope Crane Coffee can survive.
Q: a crane lifts load of 500kg mass to a distance f 20m in 10s at a constant velocity. how much work is done?
a lot
Q: Old used 200 t crawler crane is available for purchase. What are the guidelines/ thumb rules for assessing its cost ?
Supply vs demand Extreme examples: If the crane is no longer needed anywhere, the cost will be 0; no demand. If the crane still has a unique useable function and there is only one available, it's immediate cost will be very high; no supply. So, assuming that the cranes supply/demand is somewhere in the middle, the methodology for assessing it's cost would be to evaluate the following: * Where is it located with respect to where it is needed? (place value) * How quickly do I need it, and how quickly can I get the crane? (time value) * What alternative solutions are available? * How much do other similar cranes cost? * etc Hope this helps!
Q: How do they erect HUGE cranes without a crane?
The really huge cranes with the boom that goes straight out at a right angle to the upright section (which goes straight up) is called a tower crane. They're assembled by using a jack assembly at the bottom, so that more sections are stuck in at the ground level.
Q: What did Stephen crane contribute to history?
I think his greatest contribution was The Red Badge of Courage. It was the most ealistic portrayal of a Civil War soldier written at the time; so real, in fact, that veterans swore the had fought alongside him during battle (Crane wasn't even alive during the war).
Q: Tower crane attached concrete pump can be? Are there any state regulations?
The state expressly states that it is not possible to have serious safety incidents in Hunan and Zhuzhou before
Q: Is the pink paper crane used to represent Lulu?
well i have NO IDEA of what ur talking about lol im just stopping by to thank you for making my life EVEN MORE PATHETIC! lol when u mentioned that u joined runescape i did too... and LITERALLY spent my WHOLE Saturday playing! hahaha its addictive as hell!
Q: live in marshes???
Seem for wild animal rehab centers or just google search these in ur area or name ur local animal refuge and explain whats occurred and ask if they could advise a place to name.
Q: Tower crane; command; gesture
8. the hook falls slightly: the arm extends to the side, front and bottom, with the angle of the body about 30 degrees, palm down, with the wrist as the axis, repeatedly swinging downward palm.9. hook horizontal move slightly: small arm toward the side of the natural extension, fingers together, palms outward, in the direction of the load should be running, repeat the slow horizontal movement.10., micro range: double arm bent, extended to one side, five fingers straight, palms relative, and the distance between the load and the distance to move.11. directions of landing: five fingers unbend, point out the position where the load should fall.12. stop: small arm horizontally placed in front of the chest, fingers outstretched, palms down, horizontal swing to the side.13. emergency stop: two small arm level placed in his fingers outstretched, palms downwards, while waving to the level of both sides.14. end of work: stretch your hands and fingers and cross over at the front of your forehead.
Q: I'm trying to workout the best height of a truss for a ship-to-shore container crane project. The crane will have a 65m outreach, 18m center section and 15m backreach. I was thinking in the region of 2m-3m truss height.Any input would be great.Thanks
Jimmy: The American Society of Mechanical Engineers (ASME) produces design standards for many types of cranes: see the link below. Many crane owners, licensing and governmental authorities having jurisdiction over cranes require design, fabrication and testing to ASME standards.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords