Tower Crane TC7050
- Loading Port:
- China Main Port
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 1 Unit unit
- Supply Capability:
- 50 Units Per Month unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Description of TC7050
1) CMAX TC7050 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;
3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator
Specifications:
Main Parameter
Model: TC7050
Jib Length: 70m
Tip load: 5.0T
Max load: 20 ton
Free type height: 50m
Mast Section: 2.0x2.0x3.0m
Packaging & Delivery
40HQ container
40~50 days after deposit
- Q: Why is there as much evidence of Icabod Crane, as there is of god??
- The devil is playing with your mind. Forget about it. God is who He says He is. Read the bible. Look at all the beautiful things He's created. Stop thinking and just believe.
- Q: How do we build an ELECTROMAGNETIC crane?
- its pretty basic tech, first of all you need a crane then you need to attach an electro magnet, the magnet is comprised of copper cable wound into a circular shape inside an iron casing (it would work just as well on the outside of an iron disk but the cable would be damaged and the magnet would stop working) the more winds the cable has the stronger the magnet, next the two ends of the cable are connected to a power source (negative and positive) turn the power on to activate the magnet turn the power off to deactivate it..... simple really
- Q: I am reading catching fire and I'm at the part where Katniss just made a little dummy in the training session and she wrote the name seneca crane on it and the gamemakers were like shocked. Who is seneca crane? and whats up with her?
- he was head gamemaker, not game master.
- Q: Its on of the biggest helicopters in 1952-1955 I just need any information via you, internet, or even blue prints!I highly doubt that blueprints are probably destroyed
- On okorder /... Scroll down the page and you'll find that English follows lower on the page. There is alot of info on this page.
- Q: My friend from the internet has an injured crane in her backyard, does anyone know how to keep it calm so she can bring it to the humane society? She says she's called very animal rescue place she knows and none can help so now she's just sitting with it because kids keep throwing sticks at it.
- Thow a blanket over the entire bird, beak and all, and push it to the ground, making sure the beak does not come out. Tuck the feet and legs underneath the bird through the blanket, and grasp the neck through it. Then pick up the birds body in the blanket (carefully, because it has to move its chest to breathe) and place it in an appropriate sized plastic animal carrier or large cardboard box with a lid. That is how you transport a crane to anywhere. You MUST control the head because he will gladly put your eye out with his beak.
- Q: How to select tower crane type according to the height of building? Seek explanation
- Choosing tower cranes is not based on height, but is based on the coverage area. The height is only a reference value. Now high-rise QTZ can be attached to the wall, so height is not a problem. Let's talk about the shape of your building, and the best of the 5
- Q: the question is :Two cranes can unload a ship together in 15 hours. The faster crane takes 16 hours less than the slower crane, if each were to unload the same ship alone. How long doesi t take for each crane to unload this ship? I done most of the math but i am stuck with this last part .15+- radical 1185/2
- No. of hours for the slower to unload alone—x: 1/x + 1/(x - 16) = 1/15 (x - 16 + x)/(x? - 16x) = 1/15 15(2x - 16) = x? - 16x 30x - 240 = x? - 16x x? - 46x = - 240 x? - 23x = - 240 + (- 23)? x? - 23x = - 240 + 529 (x - 23)? = 289 x - 23 = 17 x = 40 No. of hours for the faster to unload alone: = 40 - 16 = 24 Answer: slower crane, 40 hrs; faster crane, 24 hrs Check: = 15(1/40 + 1/24) = 15([3 + 5]/120) = 15(8/120) = 15(1/15) = 15/15 or 1
- Q: Every day to see the site of the tower crane, and increased with the increase of buildings, but it is very strange. By what means, in the process of how to increase Balance Master, please explain.
- It's not a cable, it's a steel bar! Scaffolding
- Q: The fight sequence on the construction crane between 007 and villain Molakka was mezmorizing. But would the laws of gravity allow for it to happen in real life? I mean, acrobats perform similar stunts, but could the average super spy and villain?
- Is a fantastic movie fight scene realistic? You've already answered your own question, so why ask?
- Q: please tell me where you found the info.
- less then a yr i believe
1. Manufacturer Overview
Location | SHANGHAI,CHINA |
Year Established | 2000 |
Annual Output Value | Above US$100 Million |
Main Markets | CHINA |
Company Certifications | ISO 9001:2008; |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Shanghai |
Export Percentage | 0.8 |
No.of Employees in Trade Department | 600 People |
Language Spoken: | English;Chinese; |
b) Factory Information | |
Factory Size: | Above138,000square meters |
No. of Production Lines | Above 2 |
Contract Manufacturing | OEM Service Offered;Design Service Offered |
Product Price Range | Average |
Send your message to us
Tower Crane TC7050
- Loading Port:
- China Main Port
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 1 Unit unit
- Supply Capability:
- 50 Units Per Month unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords