• Tower Crane New TC7050 Building Equipment System 1
  • Tower Crane New TC7050 Building Equipment System 2
  • Tower Crane New TC7050 Building Equipment System 3
  • Tower Crane New TC7050 Building Equipment System 4
Tower Crane New TC7050 Building Equipment

Tower Crane New TC7050 Building Equipment

Ref Price:
$40,000.00 - 80,000.00 / unit get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of Tower Crane TC7050 Description

 

Feature: Tower Crane                          

Condition: New                              

Application: Construction                                               

Certification: CE,ISO

Place of Origin: China(Mainland)          

Model Number: TC7050         

 

Packaging & Delivery of Tower Crane TC7050

 

Packaging Detail: Nude package          

Delivery Detail: 25-30days

 

Main Feature of Tower Crane TC7050

 

Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.

 

It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.

 

It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.

 

It's lifting height is obviously increased thanks to its self-erecting and wall attached function.

 

It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.

 

Tower Crane TC7050 Specifiction

 

Free standing height (m)

50

Max height with attachment (m)

200

Working range can be adjustedm

5055606570

Min working rangem

2.5

Max lifting capacityt

20

Tip load @ 70mt

5

Hoist mechanism (VFD+PLC)

Falls

2

4

Lifting capacityt

05

010

010

020

Speedm/min

080

040

040

020

Motor

YZPBF280S-4-75KW

Trolleying mechanism (VFD+PLC)

Speedm/min

0-60

Motor

YPBE132M-4-11KW

Slewing mechanism (VFD+PLC)

Speedr/min

0-0.6

Motor

YTRVF 132M2-4-9KW×3

Climbing speedm/min

0.45

Counterweightt

25

Mast section sizeL×W×Hm

2.45×2.45×5

Working temperature

-40+60

Total power (KW)

115

Power supply requirement (KVA)

370KVA for generator

Cable type ( within 35 meters from site power source to lower

 electric box of tower crane )

70mm23+2, 5 cores

 

Startup voltage & current

380V×95%=361V  408A

Rated working voltage & current

380V  273A

 

Images of Tower Crane

 

 

FAQ of Tower Crane

 

Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.

Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……

Third if there are special needs, we could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

Q:How to improve tower crane industry in china?
Powerful okorder ) manufacturing standards according to the rules of tower crane industry market economy. ?? Manufacturing industry is a huge system, the formation of a broad face, not one or two companies can do a good job. Powerful alliances to promote the group is a good idea, but it can not Arbitrarily arranged association, we must do things according to the market economy laws. A lot of problems are not necessarily be resolved by the professional industry, you can use the cross-industry solution.
Q:Ok I got these huge mosquito things in my house and found out they are crane flies. I got up this morning and there are several hanging from my ceiling on a long single strand of silk or web. Is this unusual? Its really weird.
Probably just harvest man or a cellar spider making a web. You might have just mistaken them.
Q:What is the most likely reason that Crane never tells us the lieutenant's name in episode of war?
The Stephen Crane Society Stephen Crane did not have a middle name. Stephen Crane is buried in ... Would a person be more likely to receive a wound when bravely charging the enemy .... I would be most grateful if you could tell me where I could find this please? .... An Episode of War. How does the facts that the lieutenant is rationing ..
Q:the highest ranking American serviceman, at least in the so called prison camp
Bob Crane did not commit suicide. His head was caved in with a video camera tripod while he was in bed, presumably, asleep. This happened at a time when he was doing dinner theater in Arizona. It is believed that a male friend of his who liked hanging around with Crane did the deed as Crane was seeking to end their friendship. Crane was a chick magnet and very interested in video taping his encounters with women. This friend of Crane's used to pick up the leftovers that Crane didn't sleep with and thus the reason for his being angry when Crane wanted to end the friendship.
Q:It's better if the explanation is not complicated.TQ
Hello, 1. Modularity: You can build ships (larger ships) in modular sections and have the crane lift these modular sections and put them into place for final assembly. This is one major advantage that was not available back in the day
Q:A man said to the universe:“Sir, I exist!“However,” replied the universe,“The fact has not created in meA sense of obligation.”
Apparently Mr. Crane thinks the universe is a liar or has been deceived.
Q:If I have one week, is that enough time?
It all depends on how fast you can make one paper crane and how many hours you have available each day. If you made 15 an hour for 10 hours each day (150 cranes a day) for 7 days you would have 1050 cranes. You will probably find that you begin to go faster, the more cranes you make. However, after 2 or 3 days you will get sore hands and this will slow you down again. It's easier when you work as a team.
Q:I want this as a tattoo but I want to know what it means. Why type of tree is it? What do the symbols translate into?
The kanji / symbol (character of Chinese origin, also used in Japan) is the kanji for 'crane' (the bird, not the construction site vehicle!!)
Q:I was watching Batman Begins and at the end Gorden says that he hasn't caught Crane. Since the villians in the next Batman movie are going to be two-face and the joker will Crane make a reapperance in the thrid movie (if there is one)?
Right okorder reported that an anonymous insider says Murphy will return as Scarecrow in The Dark Knight, but this is an unconfirmed rumor. Also, rumors are that Two-Face would not actually be the villian until the third movie, and that this movie will showcase him as Harvey Dent, the DA and hero, and show him on the path of becoming Two-Face.
Q:Our company is responsible for the general contracting construction project foundation pile by Party A but other subcontractor for the construction of pile foundation of a pile foundation the company has quickly completed the construction scheme of the party and the supervision of tower crane foundation now has been reported by the audit Party B must contact us pile pile. We believe that Party A shall bear it at one time. Ask the net friend is this so?
In fact, in the long run, in a word, what the construction site is finally all party a pay, just clearing the count.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords