Derrick Crane TCW2460

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or L/C
Min Order Qty:
1 Unit unit
Supply Capability:
50 Sets Per Month unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description of TCW2460

1) CMAX TC4808 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator

 

 

Specification of TCW2469

Jib length: 24m

Maximum load capacity: 8T

Tip load: 6T

Hoisting mechanism: 30LVF20 (VFD+PLC)

Luffing mechanism: 30LVF (VFD+PLC)

Slewing mechanism: 95RCV×2

 

Packaging & Delivery of TC4808

40HQ container

20~25days after deposit

 TcW2460  TCW2460

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What qualifications do you need to be a Crane Operator in QLD, Australia?
You need to do a specific amount of hours in training to be a crane operator in Australia, I know that in Sydney, you are certified by the WorkCover Authority, or that's how it was many yeas back. Special emphasis is on loads, and point of load. We do not need a mobile crane tipping over do we. Safety, working near electrical, and on soft ground. Weight you can extend to on a jib. etc.
Q:What is the difference between lifting height of tower crane and independent height?
It is not the kind of independent highly rigid or flexible attachment function when the tower reached the maximum height, lifting height of the tower is at the maximum height and the minimum amplitude in hook, hook support face datum allows the maximum vertical distance of tower crane.
Q:What are the four major moving mechanisms of a tower crane?
The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking.There are many types of tower crane, if according to whether the walking mechanism, there is a fixed type and operation type; according to the tower structure is divided into rotary, inferior type, attached itself three; if divided by the amplitude, a trolley type, luffing type and folding arm luffing type three; according to the weight division, with light and medium and heavy three.
Q:Does my truck support this mounted-crane?
Click here to find your answer
Q:what's with a folkfore story about cranes used to deliver babies from house to house?
Well, the story was used to explain where babies come from to smaller children, but it was storks, not cranes, and Im sure it ticked Mother Goose off _ But, the the myth originated in greek mythology see: In Greek mythology, Gerana was an Æthiope, the enemy of Hera, who changed her into a stork, a punishment Hera also inflicted on Antigone, daughter of Laomedon of Troy (Ovid, Metamorphoses 6.93). Stork-Gerana tried to abduct her child, Mopsus. This accounted, for the Greeks, for the mythic theme of the war between the pygmies and the storks. In popular Western culture, there is a common image of a stork bearing an infant wrapped in cloths held in its beak; the stork, rather than absconding with the child Mopsus, is pictured as delivering the infant, an image of childbirth.
Q:Did the popularity of the Karate Kid basically ruin the effectiveness of the crane kick?
No. Anyone who poses for any technique like in the movie is going to get hit. Movies are for fun, not for learning to preform a martial art.LOL The Crane kick should come fast and un telegraphed not like in the movie. It is very similar to the Taekwando jump front kick.
Q:Cranes or storks?
Depends on where you live ? Stick to Ornamental Pheasants or Ducks,Storks and Cranes,need to be penned in at night because you will have to pinion them to prevent them flying. Try some Golden Pheasants for a try ,Lady Amherst are becoming a rare commodity and are quite expensive,if you have Foxes and Mink,then no matter what you get you will have problems these two predators.
Q:How to change the mechanical property unit of crane (tower crane)?
Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
Q:How to calculate the pouring and maintenance of tower crane concrete in valuation?
Calculated according to actual concrete quantity. According to the design plan of the visa and construction organization.
Q:gantry crane and generator wiring diagram?
it sounds like you want to run a gantry crane with a generator the generator should have a wire diagram in side the cover. the gantry crane should have the power requirements on the electric motor there should be a tag on the motor. If you are not sure then you need to get an electrician out there to look at the two components and should be able to get you straight
We are a leading manufacturer of a broad range of disposable medical products and durable medical equipments. From 1993, our American Headquarter, Basic Medical Industries Inc. was set up in California USA exploring our initial business of gloves. Over the past 17 years, we has enjoyed unprecedented growth due in large part to the support of our valued customers.

1. Manufacturer Overview

Location SHANGHAI,CHINA
Year Established 2000
Annual Output Value Above US$100 Million
Main Markets

CHINA
Company Certifications ISO 9001:2008;

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Shanghai
Export Percentage 0.8
No.of Employees in Trade Department 600 People
Language Spoken: English;Chinese;
b)Factory Information  
Factory Size: Above138,000square meters
No. of Production Lines Above 2
Contract Manufacturing OEM Service Offered;Design Service Offered
Product Price Range Average