• Derrick Crane TCW2460 System 1
  • Derrick Crane TCW2460 System 2
  • Derrick Crane TCW2460 System 3
Derrick Crane TCW2460

Derrick Crane TCW2460

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or L/C
Min Order Qty:
1 Unit unit
Supply Capability:
50 Sets Per Month unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description of TCW2460

1) CMAX TC4808 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator

 

 

Specification of TCW2469

Jib length: 24m

Maximum load capacity: 8T

Tip load: 6T

Hoisting mechanism: 30LVF20 (VFD+PLC)

Luffing mechanism: 30LVF (VFD+PLC)

Slewing mechanism: 95RCV×2

 

Packaging & Delivery of TC4808

40HQ container

20~25days after deposit

 TcW2460  TCW2460

Q:How do they get the tower cranes (the ones used to build sky scrapers) so high? It's not like they can ship them all in one piece so how do they make them taller? I've always wondered that...
This Site Might Help You. RE: How do they put up tower cranes? How do they get the tower cranes (the ones used to build sky scrapers) so high? It's not like they can ship them all in one piece so how do they make them taller? I've always wondered that...
Q:In order to ensure the stability of tower cranes, generally along the height of the tower and building a number of meters attached
Self lifting tower crane tower 45 meters high to prevail, such as height of over 45 meters, each increased to 10 meters (less than 5 meters, excluding) demolition costs increase 20%, off-site transportation costs increased by 10%.
Q:There is no CAD map attached to embedded parts of tower crane?
4810 as long as 16. The middle spacing is different. It's almost impossible to install
Q:what are the number meanings for paper cranes?
Hey Mary, Don't let the web site name fool you, it does discuss the deeper meaning behind paper cranes. Steeped in ancient myths and carrying resonant cultural meanings, the crane occupies a central role in the Asian imagination. Anyone who has witnessed cranes flying through the early morning mist over shimmering green rice paddies will readily understand how the mysterious beauty of the crane has captivated Asian life and art for centuries. Like the dragon, tiger, and phoenix, the crane ranks among the favorite motifs for Asian artwork because of its rich meaning and history. Read more at the web sites.
Q:QTZ63 (Q5610) tower crane power, how many power parts, name, model specification, product number, date of appearance
All the details of the equipment are availableAs for power, it depends on the specific configuration of the frequency conversion and non frequency conversion will not be the same
Q:What is the rental price of a tower crane? General site rental more, but also buy more? Ask the industry for an answer?
The rental price of tower crane consists of the cost of advance and retreat yard and the monthly rent of tower crane. The cost of the advance and retreat yard includes the loading and unloading costs, transportation costs, installation costs and monitoring expenses of the tower crane. The rent of the tower crane includes the cost of tower cranes, the cost of tower crane maintenance and the wages of the crane drivers. At present, many sites are using lease way to use tower cranes, so that the occupation of the site will be less rent, investment will be relatively small.
Q:Hey, can someone let me know some more about the support cable on the top of most cranes. Eg. material, what different types are out there etc. Thanks
its called wire rope. Cables are for electricity and TV.
Q:A. Designated operatorsB. All construction site personnelC. InspectorsD. All of the above
Crane are extremely dangerous and complicated machinery , the operators need intensive education and training , they have to pass the required tests to be certified . Now even the signal guy on the ground who helps the crane operator needs to be certified . So your answer is A.
Q:determine the maximum load the crane can support in kg if the bending moment on the beam is not to exceed 5000 Nm and the shear force is not to exceed 3KN when the crane is positioned at mid span
figure shear first Let F be the max. crane load. for a simply supported symmetric load, the reactions at each end support will be half the total load. The reaction loads will also equal the shear load. 3000 N = (F + 150(9.8))/2 F = 4530 N The maximum bending moment will be the shear force times the moment arm of half the joist length 5000 Nm = [(F + 150(9.8))/2] N (2.0 m) 5000 = F + 150(9.8) F = 3530 N The bending moment max load is 1000 N less than the Shear max load so bending is the limiting factor The maximum load allowed is F = 3530 N 3530 / 9.8 = 360 kg As a form of exchange, please remember to vote a Best Answer from your results.
Q:How to build a tower crane?
Nowadays, most tower cranes used in construction sites have self lifting function, but they can not leave the coordination of cranes when they are installed.Here's the tower crane installation:1, track laying: few walking tower crane, if the working position is not changed in a stage, rail crane fixtures will be locked.Some tower cranes have no running wheels, and the tower cranes are installed directly on the required basis.2. Install the tower crane chassis parts: installation requirements, installation, and placed in the location of the weight block.3. Install the basic tower, revolving parts and tower cap.Each tower crane has the basic height of the tower installation, the installation height of the rotating device and tower cap, these work is the use of sufficient lifting capacity of the car crane to complete.
We are a leading manufacturer of a broad range of disposable medical products and durable medical equipments. From 1993, our American Headquarter, Basic Medical Industries Inc. was set up in California USA exploring our initial business of gloves. Over the past 17 years, we has enjoyed unprecedented growth due in large part to the support of our valued customers.

1. Manufacturer Overview

Location SHANGHAI,CHINA
Year Established 2000
Annual Output Value Above US$100 Million
Main Markets

CHINA
Company Certifications ISO 9001:2008;

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Shanghai
Export Percentage 0.8
No.of Employees in Trade Department 600 People
Language Spoken: English;Chinese;
b)Factory Information  
Factory Size: Above138,000square meters
No. of Production Lines Above 2
Contract Manufacturing OEM Service Offered;Design Service Offered
Product Price Range Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords