TOWER CRANE TC5013

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or L/C
Min Order Qty:
1 unit
Supply Capability:
100 unit/month
Inquire Now Customer Service
  • OKorder Service Pledge
  • Quality Product
  • Order Online Tracking
  • Timely Delivery
  • OKorder Financial Service
  • Credit Rating
  • Credit Services
  • Credit Purchasing

Add to My Favorites

Follow us:

 

Description of TOWER CRANE TC5013    

1) CMAX TC5013 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator

 

Description of  TOWER CRANE TC5013

  • Max. working range 50m, tip lifting weight 1.3T and Max. lifting weight 6T.

  • Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

  • Trolleying mechanism can provide two operation speeds.

  • Free standing height (m) 40

  • Max height with attachment (m) 121

  • Working range can be adjusted (m) 44/50

  • Min working range (m) 2.5

  • Max lifting capacity (t) 6

  • Tip load @ 50m (t) 1.3                          

Packaging & Delivery

40HQ container

20~25days after deposit

TC5013TC5013

 

                                

Q:How did Romans make columns in roman times Without cranes?
They simply lay the stone down, chiseled out the column, then stood it up via an A frame, however the Romans did have cranes, (not the massive things of today) but mobile wooden ones with counter weights at the back that operated on a system of pulleys (they even had cranes that operated on water)
Q:My kid wants to pet a crane fly because it's cool but I don't want to keep it around as a pet. I'm not a fan of crane fly. How should I tell him no? Also, I'd like to explain to him besides the fact that it disgusts me: I don't like insects.
Maybe this is a good opportunity to spend some education time with your child, and look up crane flies on the Internet. They do not eat, and they have short lifespans, so they really would make lousy pets, but it might be a more positive way to convince him of this if you spend the time with him researching the animal together so that he comes to understand these facts himself. It is very good that you are leaving your personal dislike out of it in your explanation, good for you!
Q:What is the torque limiter of the tower crane A: the lift is stopped when the lifting torque is exceeded. B: over gravity
The torque limiter acts as follows: (a)In lifting process, when the weight of the lifting object moves ahead of the trolley when the lever force exceeds the moment limiter, the hook rises, the motor and the trolley forward motor are stopped at the same time, and the utility model has the safety function.
Q:Or would it be better to custom order for my applications?
1. Crane did not go out of business although they were on shaky ground a year and a half ago. A group of private investors and corporations baled them out. Howard's, Crower Comp are all pretty equal. Your car has roller hydraulic lifters so you'd better know what you're buying. Your missing some Chevrolet factory roller lifters and roller cam grinds. I see you haven't purchased the 2010 GM Performance Parts Catalog from your Chevrolet dealer parts counter yet. It's loaded with mild to wild hydraulic roller small block cams. You haven't figured it out yeat have you? A cam switch isn't going to make that 305 run worth a hill of beans. You need a set of cylinder heads to alow it to breathe first. Remember the EQ 3045A vortec performance heads for your 305? The valves ports are bigger and shaped for higher velosity. You're so stubborn I know you'll buy a cam first and whine like hell cause the car won't run any better. You'd better give this project a lot of thought because you're stuck with the stock intake and fuel/air mixer. Lower rear end gears such as 3.42's or 3.73's will wake the car up. Do that first and see if you want to spend any more money on it.
Q:I heard on the TV and found it hard to believe. I mean, they are soooo goddamned stupid and dont look like they could muster up the intelligence to bite someone anyway. Also my pet rat catches them and eats them when they blunder into the house and he seems fine! On TV it said they were one of the most poisonous creatures of their species! Should my bullsh1tometer be off the charts?
crane flies are perfectlt harmless to you and your pets, they are just annoying.
Q:my HSAP prep teacher wants us to find instructions on how to make an oragami crane.She said that it has to be less than 24 steps.I have looked on the internet and I cannot find anything.I need this by tomorrow.Please help!
Start with a square piece of paper. You got that? Fold the paper corner to corner to get a large right triangle, and fold it corner to corner again to get a smaller triangle. You got that ,or did I lose you. Open the paper, and you will see a big X. Never mind the X. We will come back to it. Now fold the paper side to side to get a rectangle, and fold the two SHORT SIDES to the X fold. Open and do the other two by repeating what you just did. Open the paper FLAT. You can now see a 4 pointed star. Along the four sides of the square, push down on the perimeter of the star to make the star come up. Fold down until you have a flat KITE. Make sure you have 2 flaps on each side. What you are looking at now is one wing, and the other one is in the back. The neck and head are inside the wings. Pull them out half way to expose them. Fold one side at the tip to make a head. If you did everything correctly, and hold under the neck with one hand and pull the tail with the other hand, the crane should flap its wing. Write back if you need more help.
Q:How do cranes use geometry?
If your referring to cranes in construction cranes, then it might form a right triangle with the ground implying the use of trigonometry which is a part of geometry.
Q:What other actress of the 1960s who could have done the role of Marion Crane in Psycho,in place of Janet Leigh and give result too?I think she perfect.
Believe it or not? Alfred Hitchcock had thought Vera Miles would have been good in that role. He had one of his mini-crushes on Vera, and had planned to make her a superstar. However, he lost patience when Vera decided to enjoy her married life and have babies. Vera had no burning desire to become a superstar, and was happy with the work she was doing. She was also very smart in another way. She said that those parts worked out well for the blonde, sexy women that played them, but that just wasn't her look or her approach to acting. Vera Miles was in the movie Psycho, but she played the part of Marion Crane's sister. I've always thought that Janet Leigh was perfect in that role. She was so beautiful and unbelievably sexy that when she was on the screen? You couldn't stop watching her. Her ample bosom was an attention-getter all by itself. No offense to Janet Leigh, but I don't know if anyone cared if she could act or not! However, she did a fine job in Psycho.
Q:Preferable short poems or phrases in Chinese.
this one is about cranes We thought they were gulls at first, while they were distant- The two cranes flying out of a natural morning, They circled twice about our house and sank, Their long legs drooping, down over the wood. We saw their wings flash white, Frayed at the black tip, And heard their harsh cry, like a rusty screw.
Q:This poor little guy has been out on my balcony where I smoke my cigarettes for two days now. One wing is badly mangled and he can't fly away, I thought to just let him work it out yesterday in hopes of him healing on his own somewhere, but today he was climbing on my leg as if asking for help and I feel horrible for him now...he's suffering, he hasn't gone far in at least 24 hours I feel I should feed him and give him water until he heals...what do crane flies even eat?? Any advise aside of killing him and putting him out of his misery would be great!!
Take him to a wildlife reserve! He has a chance of life! Or a 24 hour emergency vets office would be good. You could call a vet to come to your house. It might be a little pricey, but the animal would thank you for it. If he is suffering too badly, a vet will make the decision to euthanize him. If you have any children at your house, do not allow them to see it. It does not make a child happy to see a bird in that condition. I would call your local vets office now.
We are a leading manufacturer of a broad range of disposable medical products and durable medical equipments. From 1993, our American Headquarter, Basic Medical Industries Inc. was set up in California USA exploring our initial business of gloves. Over the past 17 years, we has enjoyed unprecedented growth due in large part to the support of our valued customers.

1. Manufacturer Overview

Location SHANGHAI,CHINA
Year Established 2000
Annual Output Value Above US$100 Million
Main Markets

CHINA
Company Certifications ISO 9001:2008;

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Shanghai
Export Percentage 0.8
No.of Employees in Trade Department 600 People
Language Spoken: English;Chinese;
b)Factory Information  
Factory Size: Above138,000square meters
No. of Production Lines Above 2
Contract Manufacturing OEM Service Offered;Design Service Offered
Product Price Range Average

Send your message to us

- Self introduction

- Required specifications

- Inquire about price/MOQ

This is not what you are looking for? Post Buying Request
wechat