TOWER CRANE TC5013
- Loading Port:
- China Main Port
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Description of TOWER CRANE TC5013
1) CMAX TC5013 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;
3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator
Description of TOWER CRANE TC5013
Max. working range 50m, tip lifting weight 1.3T and Max. lifting weight 6T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 40
Max height with attachment (m) 121
Working range can be adjusted (m) 44/50
Min working range (m) 2.5
Max lifting capacity (t) 6
Tip load @ 50m (t) 1.3
Packaging & Delivery
40HQ container
20~25days after deposit
- Q: Tower crane 10-5-20 is 6T, and 10-5-21 is 8T. What do you mean by tons?
- 6T/8T refers to the maximum lifting capacity of a tower crane. It doesn't matter what 10-5-20 has to do with it. Maybe your list of numbers is serial number.
- Q: Is Fireplace Crane a modern term for the swing-out metal arms that hang over a fireplace for cooking? e.g. like in dutch ovens or pots/cauldrons that hang over a fire.It sounds like a more modern term and I need to know if there is an older term. Thanks.
- I can't think of older terms at the moment, but definitely 'fireplace crane' sounds modern, and possibly American, to me. In Britain I have never heard the term, not in any historical or modern setting. My idea of a crane is a big item at a dockside or on a big building site. A domestic hearth or kitchen is too nice a place to have a 'crane'!
- Q: He has to be in his 30's to 40's but I can't find anything that gives me a definite age.
- Okay Well, You havent specified in what, but presuming you mean in the comics, and baring in mind he was the psychologist when Thomas Elliot and Bruce were only 7-8, then the bare minimum he could have been then was 21, though he was likely older. THEN presuming Bruce is around 35, though he also is probably older, then the bare minimum Crane could be is 48. that being said, he is likely between 48-60. He just looks good for his age ;). this of course is in the comics, however. The movie is different.
- Q: A man said to the universe:“Sir, I exist!“However,” replied the universe,“The fact has not created in meA sense of obligation.”
- It's recognizes no one.... I'm just guessing.
- Q: so yeah i know that cranes do the main work but i guess there are no such really toll cranes to do that with skyscrapers ?
- They put a crane on the ground, and they build 5 stories, say. Then they put the crane on top of the 5th story, and build another 5 stories, then they put it on the 10th story and build 5 more, etc. Or it's hanging on the side of the building, moving upwards as the building rises.
- Q: I know how to make cranes and I'm pretty fast at doing so but in pictures I see of crane leis the cranes look like they're folded differently so that they can be stacked on top of each other.. Can anyone teach me how to fold like that so that I can make a paper crane lei?
- But I do different from step 11 on Step 11: Normally they fold along the red line. I dont. On step 10 you see the cross line in the center +. I then fold the right pointy toward the center. Do the same for all. Step 12: I the filp the right top layer to the left, same with the back side. Step 13: fold the bottom point to the top(one layer only) filp to back side, do the same. Step 14: flip right layer to the left again, same with the back side. Step 15: Pull and done.
- Q: because i have this huge sofa i need to get to 2nd floor but i cant coz the staircase is too small
- Talk to a lumber yard that has a boom truck. Ask them how much to do it. A boom truck will cost much less than a crane. A boom truck can reach 45 to 50 feet. In this economy they are looking for anything they can get. They will most likely do it. But when really busy they wont. But things are slow. Builder 30 years. A crane will cost about 250.00 of the first hour. with a one hour min.
- Q: what are the effects of fiction in cranes?
- Uh.... Do you mean fRiction? And cranes... as in the machine or the bird..... Try to be specific.....
- Q: crane signals?
- they are out there somewhere, and everywhere I have been they are the same
- Q: You know those machines you pay and get like 15 seconds to operate the fricken metal hand?Can you give me some tips?
- make sure you find something that isn't trapped by anything else in the pit.. line up the crane one the front, then move over to the side and line it up... these machines used to be a lot easier 20 years ago, but now the arm doesn't apply much pressure.. it has to be lined up just right or you will never get anything...
1. Manufacturer Overview
Location | SHANGHAI,CHINA |
Year Established | 2000 |
Annual Output Value | Above US$100 Million |
Main Markets | CHINA |
Company Certifications | ISO 9001:2008; |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Shanghai |
Export Percentage | 0.8 |
No.of Employees in Trade Department | 600 People |
Language Spoken: | English;Chinese; |
b) Factory Information | |
Factory Size: | Above138,000square meters |
No. of Production Lines | Above 2 |
Contract Manufacturing | OEM Service Offered;Design Service Offered |
Product Price Range | Average |
Send your message to us
TOWER CRANE TC5013
- Loading Port:
- China Main Port
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords