TOWER CRANE TC5013
- Loading Port:
- China Main Port
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Description of TOWER CRANE TC5013
1) CMAX TC5013 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;
3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator
Description of TOWER CRANE TC5013
Max. working range 50m, tip lifting weight 1.3T and Max. lifting weight 6T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 40
Max height with attachment (m) 121
Working range can be adjusted (m) 44/50
Min working range (m) 2.5
Max lifting capacity (t) 6
Tip load @ 50m (t) 1.3
Packaging & Delivery
40HQ container
20~25days after deposit
- Q: National standards for tower cranes
- GB/T 5031-2008 GB 5144-2006 tower crane safety code for tower crane safety GB mechanical and electrical equipment thirty-second 5226.2-2002 mechanical parts: requirements for hoisting machines GB 5802-1986 lifting short chain hoists and other lifting equipment for the T (8) test specification level calibration chain GB 5905-1986 hoisting machine test code and procedures GB/T 5905-2011 crane and GB/T program 5972-1986 lifting wire rope for examination and discard utility specification GB/T 5972-2006 crane wire rope inspection and scrap utility specification GB/T 5972-2009 crane wire rope maintenance, maintenance, installation, inspection and disposal GB/T 5973-1986 wire rope with wedge joint GB/T 5973-2006 wire rope with wedge joint
- Q: I'm a bit confused as to what happened to him. I guess I skimed a bit at a certain important part of the book. When Seneca Crane's name was written on the dummy during training, why did the people gasp at the name written in berry juice? What happened to him? PS. I am at the begining of Mockingjay. So no spoilers please. (:
- In the end of the first book, he was put in a room with a bowl in the middle. In the bowl, there were berries. Very deadly berries. This is significant because in the arena, Peeta and Katniss threatened the Capitol that they would eat them and kill themselves. If that happened, there would be no victor. President Snow wanted Seneca Crane to kill them. But Seneca Crane let there be two victors, instead of one or none. So, back to the point. Seneca Crane was punished because he couldn't listen to the president's orders. So, he was put in a room with no food, water, etc. If he got hungry he, he had to eat the berries. So, he died. I don't know how you missed that, but I hope this helps! :) I LUV U PEETA!
- Q: If so, would you mind finding me a site that will teach me how to either with a good video or an easy-to-follow explanation because i tried many sites and i just cannot understand clearly enough. I get so far and then i can't tell what is happening in a step, and i can't do it.If you wouldn't mind to find me a site that you know will help, since you can make them, it would be greatly appreciated.Thanks.
- Video okorder /
- Q: What can paper crane symbolize?
- Paper cranes symbolize peace. They are a part of origami art, originating in Japan. That country of course was horribly decimated in WW2.
- Q: These cranes always stay higher than the construction process but I have never seen how they are extended to stay above all of it. They come in two formats, free standing and those attached to the building. The possibilities that I thought of was that maybe they use another crane to lift the housing and the horisontal arm to put in more modules into the vertical part; or that they extend it by some way by putting modules in at the top or bottom and that the crane has some self-lifting mechanism to accommodate the insertion of more modules. However, I have never seen this being done, nor does the construction of these cranes point to its ability to do so. The only other possibility that I could think of was that the crane is set up at the outset to be higher than the completed height of the building, hence there is no need to extend it but this does not explain how they do it for very high buildings where the crane is attached to the building and seems to grow higher with the building.
- In very tall buildings the tower crane's vertical frame usually sits in an elevator shaft. Initially it sits on its own base but as the building gets higher the crane is lifted using hydraulic jacks locked into the floor or floors above as they are completed. The construction of these cranes is rather ingenious in that they can dismantle themselves and the respective components lowered to the ground.
- Q: What are the working mechanisms and safety devices of tower cranes?
- About the structure: Tower cranes are all metal structures, so far there is no wood. About institutions: tower crane working mechanisms are: winding lifting mechanism; luffing mechanism; slewing mechanism; cart moving mechanism; lifting mechanism. A safety device: four limit: height limit, amplitude limit, slewing limit, travel limit; three insurance: luffing rope insurance, car insurance broken shaft, the hook to prevent falling insurance; two limit: torque limiter, weight limiter on these roughly.
- Q: does wing chun and karate come from the same white crane style of wushu/kung fu?
- The correct answer is given by Daoshi.
- Q: Also, could anyone give me a site with a detailed behind the scenes look on different types of freight ships? I hold a strong interest in the shipping sector and being unsure on little details like these annoy me. Thanks!
- ? ? ? Onboard Cranes from the cabs on each Crane , where'd you think from ?
- Q: when do i start bernie cranes missions gta 4?
- you don't unlock the Bernie Crane Missions until you complete Weekend at Florian's for Ray Boccino. The first Bernie Crane mission is called Hating the Haters where you have to run with Bernie in the park and kill the guy that's been harassing him.
- Q: So, this might seem like an odd question, but here goes.I work in an office and outside the windows there's a crane. Every day I come in from work, it has turn a little. The half-finished building that it stands next to is not being worked on and there's never anyone using the crane during the day. There's no other construction going on in the area is stands at.It's pretty high up like 6th to 7th floot and it's in a windy town. Does that matter?Why would someone turn around a crane during the night? Is it all a scheme to make me paronoid because they know I'm starring out the window most of the day?
- I guess it would be pretty windy up there at the top - maybe it is not fully locked, and the wind blows it around a little bit.
1. Manufacturer Overview
Location | SHANGHAI,CHINA |
Year Established | 2000 |
Annual Output Value | Above US$100 Million |
Main Markets | CHINA |
Company Certifications | ISO 9001:2008; |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Shanghai |
Export Percentage | 0.8 |
No.of Employees in Trade Department | 600 People |
Language Spoken: | English;Chinese; |
b) Factory Information | |
Factory Size: | Above138,000square meters |
No. of Production Lines | Above 2 |
Contract Manufacturing | OEM Service Offered;Design Service Offered |
Product Price Range | Average |
Send your message to us
TOWER CRANE TC5013
- Loading Port:
- China Main Port
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords