Tower Crane TC7034
- Loading Port:
- China Main Port
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 1 Unit unit
- Supply Capability:
- 500 Units Per Month unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Description of TC7034
1) CMAX TC7034 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;
3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator
Specifications of TC7034
1.Max. working range 70m, tip lifting weight 3.4T and Max. lifting weight 12T.
2.Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
3.Tower crane Trolleying mechanism can provide two operation speeds.
4.Tower crane Independent height (m) 50
5.Max height with attachment (m) 200
6.Working range can be adjusted(m) 50/55/60/65/70
7.Min working range(m)2.5
8.Max lifting capacity(t )12
9.Tower crane Tip load @ 70m(t)3.4
Packaging & Delivery of TC7034
40HQ container
20~25days after deposit
- Q: carribean crane jobs?
- As okorder / When completed Trinidad will have the largest Conference Centre in the Caribbean. This is just the latest of new tall buildings the Government of TT is building in Port of Spain.
- Q: When the tower crane top height is more than meters
- Three, lifting and installation, demolition works(1) lifting projects with unconventional lifting equipment and methods with single lifting weights of 100kN and above.
- Q: I know you need to put current around the magnet (or certain type of metal) in order to attract but is it possible to use as pushing an object away. if there is please tell me how!
- To push an object away, you need equipment that is low to the ground when it applies the force. Bulldozers are designed to push objects. Electromagentic cranes are designed to deal with vertical forces, so they are used to lift and drop metal objects. They use electricity to flow through coils wrapped around a metal core to generate a strong magnetic field. Trying to use them to push things could cause a crane to tip over since they are not designed to deal with horizontal forces. Even if you could get the electromagnet wired to repel metal objects, when you bring the electromagnet near the object, it would repel away in an unwieldy manner because of friction and interference with the ground. And trying to direct a large electromagnet at the end of a long chain would be difficult.
- Q: Please help. I need real answers.
- About Ichabod Crane, the school master, Washington Irving writes in A Legend of Sleepy Hollow: He was, in fact an odd mixture of small shrewdness and simple credultiy. His appetite for the marvellous, and his powers of digesting it, were equally extraordinary; and both had been increased by his residence in this spellbound region. Ichabod Crane digests Cotton Mather's (a Puritan preacher) History of New England Witchcraft, a book in which he firmly and most potently believes. He spends many hours reading Mather's work, and fluttered by his excited imagination he believes that he is struck with a witch's token at times. To drive away the evil spirits, he sings psalm tunes. Nevertheless, Crane still delights in the supernatural, so he spends winter evening with the old Dutch wives who exchange tales of ghosts and goblins around the fire. In turn, Ichabod entertains them with Mathers's reports on witchcraft, as well as predicting what the sounds in the winter air portend.
- Q: I've been wondering and haven't been able to find any information on it. Where does the sky crane go after it drops off Curiosity? You see it fly off in all of the videos, but no information is given on where it goes? Does anyone know?
- On this mission it simply flew off to one side then fell to the surface of Mars. In future missions they may allow the skycrane to gently touch down and use it as a base station. This mission it was achievement enough just to get the rover down safely. Cheers!
- Q: Every day to see the site of the tower crane, and increased with the increase of buildings, but it is very strange. By what means, in the process of how to increase Balance Master, please explain.
- It's not a cable, it's a steel bar! Scaffolding
- Q: Tower crane demolition safety technical disclosure, how to write?
- Baidu search:Tower crane removing and lowering joint safety technical disclosure.
- Q: Construction tower crane driver (T) Ben can be used as construction crane driver (S)?
- Building crane driver (T); tower crane driverConstruction crane drivers (S); construction elevator drivers; neither is common.
- Q: What is the inspection certificate for tower cranes?
- Inspection certificate of tower crane must have two certificates:1, the manufacturer issued its own "product quality certificate"2. The product quality supervision and inspection certificate issued by the Technical Supervision Bureau
- Q: Tower crane; command; gesture
- 5. hook down: arm stretched to the front, lower, and the body with an angle of about 30 degrees, five fingers stretched out naturally, with the wrist as the axis rotation.6. hook horizontal movement: small arm side to side straight, fingers together, palms outward, toward the direction of the load should be moving down to the shoulder level position.7. the hook rises slightly: the small arm extends to the top of the side, the top of the palm is higher than the shoulder, the wrist is the axis, and the palms swing upward repeatedly.
1. Manufacturer Overview
Location | SHANGHAI,CHINA |
Year Established | 2000 |
Annual Output Value | Above US$100 Million |
Main Markets | CHINA |
Company Certifications | ISO 9001:2008; |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Shanghai |
Export Percentage | 0.8 |
No.of Employees in Trade Department | 600 People |
Language Spoken: | English;Chinese; |
b) Factory Information | |
Factory Size: | Above138,000square meters |
No. of Production Lines | Above 2 |
Contract Manufacturing | OEM Service Offered;Design Service Offered |
Product Price Range | Average |
Send your message to us
Tower Crane TC7034
- Loading Port:
- China Main Port
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 1 Unit unit
- Supply Capability:
- 500 Units Per Month unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords