• ANCHOR FRAME FOR TOWER CRANE System 1
  • ANCHOR FRAME FOR TOWER CRANE System 2
  • ANCHOR FRAME FOR TOWER CRANE System 3
ANCHOR FRAME FOR TOWER CRANE

ANCHOR FRAME FOR TOWER CRANE

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing
1)We are a professional tower crane manufacturer,which integrate research,development,production,sales and service together.
2)Our products are very popular on both domestic and overseas markets.
3)After many years efforts,we are now the primary production parnter of a lot of domestic construction groups.
4)We are entitled with high degree of trust and very good reputation by our customers overseas.
KIND REMINDER:
WE ALSO MANUFACTURE OTHER TYPES OF MASTSECTION AND OTHER TOWER CRANE
SPARE PARTS, SUCH AS LIFTING JIB, TIE-IN
COLLAR, CLIMBING CAGE AND HOOK.  
ALSO WE PRODUCE MAST SECTION AND OTHER SPARE PARTS FOR
OTHER NAME BRAND TOWER CRANES, SUCH AS COMANSA, RAIMONDI
AND COMENDIL.
WE WISH TO PRODUCE MOST-SATISFIED PRODUCTS FOR YOU!
PLEASE FREELY CONTACT US FOR INQUIRY!


Q:What is a door rack for a construction site? How high is it generally?
Door scaffolding has not yet unified design and product standards, the products of different specifications, quality is inconsistent. Not only for construction units to use and management of great difficulties, is not conducive to the promotion of applications, but also to the construction safety risks. Therefore, it is necessary to organize and issue a unified standard for door scaffolding
Q:Where does Heilongjiang do the most construction machinery?
In the world, the industry address basic similar, of which the United States and Britain called the construction machinery and equipment, construction machinery and equipment for Germany, Russia called for the construction and road construction machinery, construction machinery called japan. In China, some products are also known as construction machinery, and in the mechanical system, according to the State Council to set up the industry approval, collectively referred to as construction machinery, has continued to the present
Q:How do the welding parts in the welding drawings of the machine parts indicate the technical requirements of the drawings?
The whole circle of the triangle is welded as an angle weld, and the other is the outer circle with the same diameter as the two, so the butt joint is better to open the groove. Welding, for V type welding seam, and, technical requirements are generally, welding firm, no defects, welding smooth grinding, cleaning welding slag splash
Q:What are the world famous mechanical equipment exhibition?
2 、 Las Vegas Construction Machinery Exhibition (Conexpo-Con/Agg) sponsored by the American equipment manufacturers association, the American precast concrete association, the United States sand association. It is the world's second largest construction machinery exhibition after BAUMA. The exhibition, sponsored by the American Association of equipment manufacturers, has been held every three years for nearly a hundred years. The next exhibition will be held on March 2017 7-11. The exhibition is of great size and numerous merchants. It has focused on world famous brands such as Caterpillar, Komatsu, Liebherr and Volvo. It is an important platform for displaying the latest technology, equipment and products in the industry.
Q:What are the principles, performances and uses of the commonly used construction machinery equipment?
1.: concrete pump principle: concrete pump driven by motor pump system, the conveying capacity of constant power control of hydraulic system of concrete pump automatic control, manual control can also be used to select the concrete delivery volume. Performance: 1. using the hydraulic system of double pump double open circuit, the main pump valve swing circuit and S circuit are separate for fault diagnosis and removal; 2. pumping hydraulic circuit adopts the main valve pilot pressure control; 3. hydraulic system has safe relief protection, while the main pumping system overpressure, oil pump automatic pressure cutting off; 4. switching circuit with constant voltage supply with the energy storage device, so as to guarantee reliable swayingforce large and have the advantages of energy saving effect; 5. pumps and valves are used continuously, the world famous brand is more reasonable and more reliable and easily realized commodity concrete transport quantity adjustment; 6. hydraulic pipeline with cone seal pipe joint sealing material; 7. pumping circuit adopts a valve block mode of high and low voltage switch, convenient, no leakage; 8. with oil and oil filter technology, foreign body into the hydraulic system. Further improve the hydraulic system reliability and component life; 9. hydraulic hose hose. Use: widely used in commercial concrete demand for large, high grade and strict quality requirements, long conveying distance of high-rise buildings, municipal construction, electric power, energy, transportation and other civil and industrial buildings, especially the construction of the narrow space more show its true colour of a hero.
Q:What are the main functions of construction equipment monitoring system?
This belongs to information management engineering. The control part is the "heart" and "brain" of the whole system. It is the command center to realize the function of the whole system. The control part is mainly composed of the main console (some systems also have a secondary console). The main function of the total console: video signal amplification and signal distribution, image correction and compensation, image signal and image signal (including switching or voice signals) record, cameras and auxiliary components (such as camera, PTZ, shield) control (remote control) and so on.
Q:Construction machinery production need to deal with what documents?
The person in charge of the enterprise, the person in charge of the project, full-time safety management personnel in "safety assessment qualified" column content according to the "three persons" Safety Assessment Certificate (fill in the contents of enterprise work safety management staff should meet the enterprise production safety management, the safety management department staff with the qualification to the total contract for not less than 5, not less than 3 professional contracting labor subcontracting, not less than 1; the construction site should be equipped with full-time safety management personnel according to the project size can be determined, according to the construction area of less than 10 thousand M2 project has at least a part-time staff of more than 10 thousand M2; project 1 - 2 full-time staff; more than 50 thousand M2 large sites, according to different professional safety management group);
Q:China mechanical net
From Chinese GM parts, general machinery, hardware, tools, instruments, electrical appliances and related equipment, textile equipment, chemical equipment, agriculture, food equipment, construction equipment, environmental protection equipment, mining equipment, metallurgical equipment, financial equipment, commercial vehicles and accessories, machinery processing equipment, machinery processing industry machinery enterprises and mechanical products
Q:How are buildings, installations and materials divided?
Provisions on the division of equipment and materials for engineering construction? [answer] the division of equipment and materials in engineering construction is directly related to the reasonable division of investment structure, budget preparation and calculation of construction output value. In order to reasonably determine the project cost, strengthen the investment in the process of construction and management, the equipment and materials in the engineering construction is unclear, especially the universal controversial common problems and put forward the principle of division of fifteen copies of "national unified installation project budget quota" of the equipment and materials are divided, the provinces, autonomous regions and municipalities directly under the central government and the relevant departments of the State Council, the Department should be combined with the local situation, formulate rules for its implementation, and report to the Ministry of construction for the record.
Q:Where are the mechanical pressurization air supply facilities set up?
When the smoke proof staircase and antechamber antechamber, fire elevator or common antechamber parts can be opened outside the window, can use the natural ventilation, resulting in a stairwell with or common antechamber in the use of natural smoke exhaust with pressurized air supply arrangement of diversified combinations, and the two exhaust can not be shared.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords