Solid Wood Flooring For Flooring Heating
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1800 m²
- Supply Capability:
- 1000000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Description of Product:
Prefinished solid flooring
Features:
Excellent stability,be suitable for ground heating system
Damp-proof, anticorrosive, anti-rot.
Specification:
1.Species: Oak,maple, teak, compass, ash and so on
2.Grade: A,AB,ABC
3.Color: Natural or as per you want
4.Surface: Flat surface
5.Length: Varying length 300-1500mm
6.Width: 76-95mm or 120-127mm
7.Thickness: 15mm/18mm
8.Moisture content: 8%-10% or as per customer requested
9.Air-dryDensity:0.6 to 0.8g/cm3
10.Joint4 side: T & G, with micro bevel
11.Installation Location: On or above ground level
12.Installation: Nail
13.Gloss:Matt/semi-gloss/high-light
14.Timber origin: china, southeast asia,russia, usa, canada
15.Style: Full plank
Features:
FAQ:
① why from okorder?
Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.
All products had been produced under a clear quality standard and the quality is consistence among the shipments.
Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.
②How to guarantee the quality of the products?
We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.
QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery,
③How long can we receive the product after purchase?
Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.
- Q:Last year just cross the room, will the ground to freeze it? How big is it possible? If it is possible to crack, need to press to determine it? Question added: no live, to warm should be no water. More
- Too cold, if the indoor temperature below 5 ℃ will crack. If you do not need to do some maintenance. Maintenance methods: winter should not pay attention to heating, should prevent the water separator parts and heating pipe in the water clogging the pipeline. If the indoor temperature is lower than 5 ℃, the system should be used in the air compressor all blown out, to prevent the child fat forging forging crazy Fist Fist system is frozen. Winter should not be enabled when the geothermal heating system should pay attention to protection, to prevent the water diversion components or heating pipe in the water icing.
- Q:One hundred and seventy square meters of house electric heating to use much of the furnace?
- One hundred and seventy square meters of house electric heating to use much of the furnace?...
- Q:Radiator parallel system how to take pictures
- Radiator in parallel 1: radiator parallel 2:
- Q:What does the boiler pressure mean?
- The pressure must not be too high, 1.2 to 1.5 is the most appropriate range, more than will reduce the life of the sealing parts, too little pressure will not start the phenomenon, the solution is to open the bleed valve to open the water, open the water switch add water. Gas-fired boiler (also known as gas-fired heating water heater, see GB-2017 "gas heating water heater") is based on natural gas, artificial gas or liquefied petroleum gas as fuel, fuel burner output, combustion in the combustion chamber, by The heat exchanger absorbs the heat, and the circulating water in the heating system passes through the heat exchanger and is heated by reciprocating heat to continuously output heat to the building to provide heat to the building. In addition to the general dual-use gas boiler with heating function, both hot water function (that is, in addition to heating, but also with gas water heater function). The boiler can provide heat for the heat sink or heat source for the floor heating system. Commonly used wall-hung boilers are divided into two types of heating and heating dual-purpose furnaces and single-floor furnaces.
- Q:What is the warm lead of the heating cable
- Heating cable in the ground is the heating body, but the heating part can not be on the wall, which requires non-heating cable for current guidance.
- Q:Will the warm winter do not burn?
- A. Winter should not be careful when heating, should prevent the water separator parts and the water pipe in the heating pipe clogging the pipeline; b. Not to be activated when the water cut parts to prevent cracking; the system is not installed after the winter, such as Indoor temperature below 5 ℃, should be, the system of water with all the air compressor blowing out to prevent the system for the Dianxian spring spring temple pseudo-East sickle frozen; winter does not enable geothermal heating system should pay attention to protection, The water is frozen or the water is frozen in the heating pipe.
- Q:Maintenance of gas boiler
- I'll help you answer. 1, your home has been using the boiler, not off this will not have any problems. 2, radiator pipe is not leaking, but the pipeline pressure drop, it may be other parts of the system there are problems, otherwise the pressure will not be separated by three poor decline. Under normal circumstances, to maintain the wall pressure on the top of the pressure display is 1-1.5bar, below this pressure to pay water pressure. The pressure to your home often decline, they can not find the reason, I suggest you find a boiler after the sale to see you, the problem in time to solve.
- Q:Owners in the decoration before the obligation to suppress the warm...
- I was in October 2009 to get the key to the house, small property, but no evidence, on the 3rd floor. At that time the house has been built for two years, when we are a collective decoration. I was renovated in December 2009, was not to warm to suppress, to warm the project to do, at the end of this year when the second floor of the notice received, said his roof leakage, after investigation, confirmed that my family To warm the emergence of a problem, contact the developer, the beginning of the arc 粻 post to save the cheat brother wedge workers did not come over, our property is composed of the village committee, and now I have been paved to the ground, and carpentry has done, Ground to warm, the village committee said to pay part of the money, but not enough of my decoration loss, how should I do? Attached: I am not looking for the decoration company installed, all the renovation projects are looking for the relationship, then the decoration process, there is no damage to the warm 1. I did not suppress the decoration before the warm, I was in the decoration before the obligation to pressure to warm The 2. At that time to do the closure of the test when the second floor has been unable to contact, the current floor to warm this cost and my decoration loss, who should bear? Do I have any responsibility? Who is more responsible? 3. At present, the cost of compensation for the village committee, even the normal pavement money do not come down, how can I do? 4. If the lawsuit, I was the one which side? More...
- Q:How to use the boiler to open a few files
- How to use the boiler to open a few files...
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Solid Wood Flooring For Flooring Heating
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1800 m²
- Supply Capability:
- 1000000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords