Dual Cores Heating Cable for Floor Heating System
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 5000 m
- Supply Capability:
- 30000000 m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Description of Product:
ANLT Dual cores insulated floor heating cable
1.Double Cores-applied in difficult situation
2.Silicon Rubber Insulated-Safe
Specification:
Features
l Energy saving, self regulating, automatically vary its power output respond to pipe or vessel ambient temperature changes.l Cut to any length as you want (up to max circuit length), easy to install and pave along with pipe.
l Low install cost than another heat tracing, less maintenance charges and less downtime.
l No overheat or burnout even when overlapped.
l Several output powers
l Suitable for use in non-hazardous, hazardous and corrosive environment.
FAQ:
① why from okorder?
Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.
All products had been produced under a clear quality standard and the quality is consistence among the shipments.
Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.
②How to guarantee the quality of the products?
We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.
QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery,
③How long can we receive the product after purchase?
Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.
- Q: What skills?
- Electric boiler energy consumption is the highest, there is no way to reduce the....
- Q: What are the structural materials for the heating of household boilers?
- Insulated material of water and electricity separation of ceramic electric heating pipe
- Q: What is the difference between a system furnace and a single heating furnace in a boiler
- Have
- Q: Does the gas ratio valve of the boiler be airtight
- It is best not to disassemble and repair,
- Q: What is the difference between a warm water and a water separator?
- The role of the water separator is the heat source of hot water separately into each side of the ground radiation heating pipe laying, to achieve sub-room heating and temperature adjustment purposes. The sump is a combination of low temperature water in each way after the heat dissipation is separated and fixed to the wall or the ground. The manifold and the sump are made up of supervisors, shunting valves and joints, exhaust valves, drain valves, and terminal plugs. The use of sub-catchers effectively avoid the loopholes in water management, centralized installation, management of water meters, and with single-tube multi-channel.
- Q: Geothermal pipes are not at all temperatures
- Plumbing heat pipe after 2-3 years, the tube wall will produce a lot of accumulated dirt, resulting in inadequate water flow, heat is not enough, heating effect caused a great impact, this time you need to use the warm pipe cleaning equipment to solve the warm pipe Blocking the problem, to warm the pipe dredge commonly used tool is to warm the pipeline dredge machine. In order to clean the pipe, it is necessary to use the correct way to clean, otherwise it will cause unnecessary results.
- Q: The pressure to look at the floating spring faint tempered tents touching up in the 1.5 or so, after the opening of the heat will be similar to the heat will see the temperature will rise but it is not put out hot water, and the ground is not hot feeling. But also to open what valve? What is the black valve below the machine? More
- Any boiler before starting the machine to pay the water to see if the water pressure gauge pointer is between 1 - 1.5bar. If the water pressure in the above range, open the gas pipe valve, power on, set the machine in the winter position, set the heating temperature, usually the upper limit of the floor heating temperature can be set to 55- -60 degrees Celsius, radiator heating up to 75-85 degrees Celsius (if the radiator is not anti-hot protection, it is best to set the temperature a little lower). After normal ignition do not have to ignore it. Bath: see the water pressure gauge pressure is normal, open the gas valve, power on, set the machine in the summer position (if it is winter, that is set in the winter position), the hot water temperature is set at 42-45 degrees Celsius Between, open the hot water head, until the water temperature is appropriate and stable after you can start bathing. Antifreeze: water pressure gauge pressure is normal, the machine power plug (do not boot), the gas path open (must ensure that the gas source) can be. The above operation applies to Faroe, Haas, Ariston, Bosch, Squirrel, Beretta and other brands of boiler
- Q: Radiator parallel system how to take pictures
- The installation of the radiator is divided into two forms: the installation and installation of the radiator. The installation steps include the installation of the pipe, the installation of the radiator, the installation of the boiler, the pressure test and the customer acceptance. Trouble, need to slot and install the set of water, for the decoration of the housing, the general choice to install the radiator, installed both convenient and not damage the indoor decoration effect. 1. Laying the pipeline in advance with the customer to communicate with the location of the radiator after the installation of the need for the layout of the pipeline, the pipeline is generally in the ceiling, baseboard and other hidden places, the laying of the tube as much as possible not to affect To the interior decoration or take up too much space. 2. Install the radiator in the process of installing the radiator to the radiator to be stable, and to use the level of measurement to see if the installation is smooth, and then the valve connection and inlet and outlet valves connected, after checking the correct The pipe clamp is reinforced. 3. Installation of the wall-mounted boiler The installation of the boiler should be noted that with the open line and electrical equipment separated from the flammable and explosive materials can not be on the hair to promote the safety of the body, Table and gas stove should be more than 300mm distance. 4. Stress test and customer acceptance Construction workers in the pipe stamping test when there is no run, run, drain, drop and other phenomena, confirmed by the customer after the inspection can be accepted.
- Q: To warm or water pipe leakage from the time of the warranty period
- I heard that do not repair.
Send your message to us
Dual Cores Heating Cable for Floor Heating System
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 5000 m
- Supply Capability:
- 30000000 m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords