Bamboo Flooring for Floor Heating System

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1800 m²
Supply Capability:
3000000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description of product:

bamboo flooring for heating


Specification:

1.carbonzied horizontal structure 

2regular knots texture 

3 F-type click lock 

4.A grade


Features:

1. horizontal carbonized structure

2.gloss lacquer finished

3.beauty,various color for choose

4.meet E1 grade

5.pass CE/ISO9001/ISO14001 certification

6.size:1000x126x17mm or 960x96x15mm

7. harder and stronger

8. this series bamboo flooring: high-temperature and pressure carbonized desugared,degreased and dehumidification, strong hardness with high density, fine tissues with high elasticity, anti-wear & spilt-rersisting, E1 grade quality Assurance and mothproof, mildew proof, healthy & environmental.


Photos:


Bamboo Flooring  for Floor Heating System


FAQ:

① why from okorder?

Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.

All products had been produced under a clear quality standard and the quality is consistence among the shipments.

Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.  

②How to guarantee the quality of the products?

We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.

QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery, 

③How long can we receive the product after purchase?

Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Owners in the decoration before the obligation to suppress the warm
I was in October 2009 to get the key to the house, small property, but no evidence, on the 3rd floor. At that time the house has been built for two years, when we are a collective decoration. I was renovated in December 2009, was not to warm to suppress, to warm the project to do, at the end of this year when the second floor of the notice received, said his roof leakage, after investigation, confirmed that my family To warm the emergence of a problem, contact the developer, the beginning of the arc 粻 post to save the cheat brother wedge workers did not come over, our property is composed of the village committee, and now I have been paved to the ground, and carpentry has done, Ground to warm, the village committee said to pay part of the money, but not enough of my decoration loss, how should I do? Attached: I am not looking for the decoration company installed, all the renovation projects are looking for the relationship, then the decoration process, there is no damage to the warm 1. I did not suppress the decoration before the warm, I was in the decoration before the obligation to pressure to warm The 2. At that time to do the closure of the test when the second floor has been unable to contact, the current floor to warm this cost and my decoration loss, who should bear? Do I have any responsibility? Who is more responsible? 3. At present, the cost of compensation for the village committee, even the normal pavement money do not come down, how can I do? 4. If the lawsuit, I was the one which side? More...
Q:Electric heating furnace in the resistance wire and magnet wire which is a good power saving it
Resistance wire high thermal quality, power saving and durable wire
Q:How to connect the natural gas boiler
There are five tubes below the natural gas boiler, look at the instructions you will understand. They are: heating water, heating back to the water, tap water, sanitary hot water, gas pipe. 1, connected to warm, then, is the "heating water", "heating back to the water," the two water pipes connected to the floor to the water heater, the warm water separator has two rows of metal valves, two joints, and the boiler Of the heating water, heating back to the water two interface docking. Usually above a row of water supply, the following row of water back. But it does not matter. 2, the gas pipe and the gas pipeline to be connected at home, if the home inside the gas pipeline is only a fight forged forged treads overturned fist joints, to take a three links before they can connect the fireplace and gas stove. 3, tap water, and the home should be connected to the water pipe, used to add pressure to the heating system, and the supply of bath, wash your face, vegetables and other water. 4, sanitary hot water and water, and the need for hot water at home tap, such as shower, washbasin, wash the pool and so on. note! The The 1, the connection of the boiler related to the installation of gas pipeline transformation, the need for a corresponding qualification, and to the local gas company to declare. 2, in the clear understanding of each interface before the boiler, do not rush to connect, boot, so as to avoid damage to the boiler parts. 3, the boiler / floor heating work pressure generally 1-1.5bar between the working temperature of 45-55 ℃ between. Too high temperature and pressure, is not conducive to the warm life. Maidi Si boiler, dedicated to your service.
Q:How to build electric heating
To see what you want to do there are electric film and heating cable two if you want to do electric geothermal can find our company Tianmei Technology Development Co., Ltd. wholeheartedly at your service
Q:Whether the groove card can be used for heating pipes
Not suitable for the groove in the gasket is rubber material heat resistance is not high long-term thermal environment will cause the gasket aging caused by leakage
Q:New house can not keep warm in winter?
Since the "have to pay half of the money, and this winter is not to stay, apply for warmth, then they are not responsible for the warmth of frozen," then change the idea to solve, do not have to spend more time with their children wasting: warm is not easy to crack, but do not rule out extreme case. To understand: there is water in the warm tube is the key, easy to freeze. Solution: the home of the warm system and the external system to isolate the household valve closed (preferably in the demolition of the valve joints plus a wire plug to prevent the valve from the external system out of water), and then please use The air pump blows out the residual water of the home heating system, so there is no moisture in the whole system, and it is not afraid to warm the crack.
Q:Water to warm service water heating system as a covert project
Ventilation and air conditioning from the big set of Huai Chou cake bander to see the leather palace Ji Yi is the housing ventilation works and air conditioning works, both air-conditioning works. HVAC works include ventilation works and heating works. The installation of the place and nothing different, but the contents of the inclusion is not the same.
Q:20 kilowatts of electric boilers for large area of heating
1000 kW = 1 MW, then 20 kilowatts equivalent to 0.02 megawatts 1 MW of heating area can be an average of 5000 square meters 20 kilowatts can be heated area is about 0.02 * 5000 = 100 square meters 20 kilowatts of electric boilers can be 100 square meters of area heating
Q:Solar water heating system energy-saving projects in what energy-saving sub-item, heating energy-saving projects Well?
Solar water heating system energy-saving projects in what energy-saving sub-item, heating energy-saving projects Well?...
Q:Gas boiler display hh what is the fault
2, different brands of fault code expression is not the same way; 3, in order to better, but the code is not the same as the code, The problem can explain the consequences of failure.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range