• Bamboo Flooring  for Floor Heating System System 1
  • Bamboo Flooring  for Floor Heating System System 2
  • Bamboo Flooring  for Floor Heating System System 3
Bamboo Flooring  for Floor Heating System

Bamboo Flooring for Floor Heating System

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1800 m²
Supply Capability:
3000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description of product:

bamboo flooring for heating


Specification:

1.carbonzied horizontal structure 

2regular knots texture 

3 F-type click lock 

4.A grade


Features:

1. horizontal carbonized structure

2.gloss lacquer finished

3.beauty,various color for choose

4.meet E1 grade

5.pass CE/ISO9001/ISO14001 certification

6.size:1000x126x17mm or 960x96x15mm

7. harder and stronger

8. this series bamboo flooring: high-temperature and pressure carbonized desugared,degreased and dehumidification, strong hardness with high density, fine tissues with high elasticity, anti-wear & spilt-rersisting, E1 grade quality Assurance and mothproof, mildew proof, healthy & environmental.


Photos:


Bamboo Flooring  for Floor Heating System


FAQ:

① why from okorder?

Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.

All products had been produced under a clear quality standard and the quality is consistence among the shipments.

Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.  

②How to guarantee the quality of the products?

We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.

QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery, 

③How long can we receive the product after purchase?

Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.




Q:Does the gas ratio valve of the boiler be airtight
It is best not to disassemble and repair,
Q:Water tank plus electric heating tube to give warm when the heat source
If you only use this water when heating, it is possible. But pay attention to the cycle
Q:Dual-use boiler is also only one burner, then the life of hot water and heating hot water is how to burn at the same time? More
Dual-use fireplace life hot water, heating function is not working, and always life is hot and dry tripod scraping scraping calcium state water abalone priority, no life hot water demand and then switch to heating, casing machine and plate change Machine life hot water function is different...
Q:One hundred and seventy square meters of house electric heating to use much of the furnace?
One hundred and seventy square meters of house electric heating to use much of the furnace?...
Q:Is the carbon crystal warmer than the other? Where is it?
Carbon crystal to warm the advantages of: 1. durable and reliable carbon crystal to warm all underground buried parts can guarantee more than 50 years of service life. Carbon crystal heating plate can guarantee 100,000 hours of continuous work without trouble. 2. Heating efficiency of high-carbon crystal tiger ridge Hong Kong Fan Fan huan song but attack the warm heating plate "electric --- hot" conversion efficiency is extremely high, by the national professional testing, "electricity --- hot" conversion rate to More than 99%. 3. Heating speed Fast carbon crystal to warm the board of the excellent surface heating characteristics, so that the system work, to maximize the entire ground plane at the same time, synchronous heating. Is the fastest heating rate to warm the system. 4. Construction of a simple carbon crystal to warm the minimum to meet customer "one square meter" of heating requirements. 100m2 to warm the installation of construction, a group of workers (2) a day and can be laid to install the construction is completed. 5. Health and environmental protection situation, heating up quickly, fever fast. Power 30 minutes to heat. Carbon crystal heating plate directly on the indoor radiation heat, the temperature rise faster than the traditional plumbing and heating cable more than 5 times faster.
Q:Maintenance of gas boiler
I'll help you answer. 1, your home has been using the boiler, not off this will not have any problems. 2, radiator pipe is not leaking, but the pipeline pressure drop, it may be other parts of the system there are problems, otherwise the pressure will not be separated by three poor decline. Under normal circumstances, to maintain the wall pressure on the top of the pressure display is 1-1.5bar, below this pressure to pay water pressure. The pressure to your home often decline, they can not find the reason, I suggest you find a boiler after the sale to see you, the problem in time to solve.
Q:Do you forget to close the water injection valve and start the machine in the heating state will damage the three-way valve?
Not the water valve can be off the system may be overpressure by the safety valve with the three-way valve to protect the relationship is not...
Q:Members of my dear friend, brother house this winter can not live, but this heating fee is expensive, ah, want to stop, afraid of the temperature is too low, the warm tube to crack. Would like to ask experienced friends, what advice? Is not to put the pipe in advance of the water out of the ah, the stare out of the box of meat, Or simply do not have to drain the water is not bad, thank you more
Too cold, if the indoor temperature below 5 ℃ will crack. If you do not need to do some maintenance. Maintenance methods: 1, the winter should not pay attention to heating, watertight parts should be prevented from cracking and heating pipe in the water clogging the pipeline. 2, do not be activated to prevent the water separator parts of the system after the installation of the winter is not enabled, such as indoor temperature below 5 ℃, should be the system of water with air compressor all blown to prevent the system by freezing; winter Do not enable geothermal heating system should pay attention to protection, to prevent the water cut parts or water heating pipe in the ice.
Q:Who used a small squirrel boiler. That model is easy to use? Can you talk about its practicality!
Ha ha obviously sell the boiler most people know so clearly?

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords