Bamboo Flooring for Floor Heating System

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1800 m²
Supply Capability:
3000000 m²/month
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8618101089932

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description of product:

bamboo flooring for heating


Specification:

1.carbonzied horizontal structure 

2regular knots texture 

3 F-type click lock 

4.A grade


Features:

1. horizontal carbonized structure

2.gloss lacquer finished

3.beauty,various color for choose

4.meet E1 grade

5.pass CE/ISO9001/ISO14001 certification

6.size:1000x126x17mm or 960x96x15mm

7. harder and stronger

8. this series bamboo flooring: high-temperature and pressure carbonized desugared,degreased and dehumidification, strong hardness with high density, fine tissues with high elasticity, anti-wear & spilt-rersisting, E1 grade quality Assurance and mothproof, mildew proof, healthy & environmental.


Photos:


Bamboo Flooring  for Floor Heating System


FAQ:

① why from okorder?

Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.

All products had been produced under a clear quality standard and the quality is consistence among the shipments.

Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.  

②How to guarantee the quality of the products?

We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.

QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery, 

③How long can we receive the product after purchase?

Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Geothermal coil spacing is too hot not how to do
Home improvement 200. works 350
Q:What is the difference between a single-fired stove and a dual-purpose stove for a gas-fired boiler?
Single heating can only heating the heating film or to warm with the use of heating and hot water can be used to provide hot water
Q:To install the mixed water center also installed with a pressure differential bypass valve
The role of mixed water center is mainly to adjust the warm water supply problems, to achieve automatic control of water supply temperature. Reason: According to the provisions of the country to warm the installation, the water temperature should not be higher than 60 ℃: 1, to prevent the warm water in the warm pipe, water mixers and other heating system components in the scale. 2, to warm the pipe material for the plastic material, the higher the temperature of the working environment, the greater the pressure, will shorten the warm life. Municipal central heating more in accordance with the heating film heating temperature of 80 ℃ to the water, far more than the warm to apply the highest temperature. The mixed water center can mix the low temperature water of the heating system backwater into the water supply pipe, lower the heating water temperature, and then supply it to the floor. Refer to the following figure: Madison fireplace, dedicated to your service.
Q:Precipitation of pulverized geothermal cleaning machine
1, pulse cleaning machine is a high-pressure gas-water mixing equipment, the body parts are strictly prohibited twist, or easy to produce leakage leak phenomenon, man-made machine failure. 2, air compressor boost is relatively slow when you can determine the air compressor piston ring need to be replaced. The expansion of the piston and the cylinder gap of the air compressor will cause the air compressor lubricating oil to flow into the tank and convey it to the pulsator via the gas tank, possibly causing the pulsator intake control device to fail. At this point need to clean the intake control device. 3, had to use the ground drain direct sewage will be sewn off the hook burst of feedback. It is therefore strongly recommended that the sewage sludge be used to prevent contamination of the environment or to cause damage to the quality of the drainage system. 4, cleaning, such as the discovery of poor sewage, should immediately stop the intake air, remove the solid impurities before they can continue to clean. 5, pulse generator, if gas, water leakage, please stop working, please contact us for maintenance. 6, winter construction, in order to prevent the process of outdoor transport within the machine pipe fittings freeze, please after the completion of the washing machine will be clean water inside the sweep; summer construction, because the air humidity, the machine internal pipeline may occur condensation Water out, this is a normal phenomenon. 7, during the winter heating heat, the ground needs 1-2 days of heat storage and heating process, geothermal return pipe will not immediately heat, should be explained to the customer.
Q:The first time this year, warm, how should open, pay attention to what
Open the pipe cutting door, open the small tube to warm the door, the water separator to open, to the water discharge.
Q:Steam heating system,affecting the two parts of the radiator heating effect?
Steam source if the pressure is the same, and connected together in the hydrophobic pipeline can be condensed in time to complete the condensate (not cause condensate water row not) then will not affect the heating effect of two parts of the radiator helium power Fen Lian, and vice versa will affect.
Q:What are the advantages of choosing forward winners?
Forward HVAC as a pioneer in the HVAC industry, the development so far, has been more mature and perfect, forward HVAC has the following advantages: 1. Each household into the system, while addressing the heating and hot water supply problems. 2. Single-family warm-up heating has great flexibility to adjust the use of completely independent, heating warm wounds to pay the mouth of the meat can hold the degree of self-regulation, heating time can be controlled, the room temperature can be freely controlled, No heat loss of boiler room and external heating network, saving investment in external network construction. 3. In line with the principle of heat charges, can accurately measure the amount of gas consumption, gas consumption can be controlled by the user, saving gas. 4. Heating cycle of low power consumption, saving energy, improve the utilization of gas pipelines and the use of economic benefits.
Q:What are the advantages of home gas boiler?
The advantages of a large number of home gas boiler, platinum diagram of the boiler as an example, then at least the following advantages: 1, heating, and domestic hot water can supply; 2, heating temperature stability, water temperature can be adjusted; Flexible, simple operation; 4, high thermal efficiency, cost savings, conducive to environmental protection; 5, less land, take up less space 6, high comfort, good heating effect. & Lt; & lt; / RTI & gt; & lt; / RTI & gt; re are a lot more!
Q:Composition of solar heating composition
Solar heating equipment, the main components: solar collectors (flat solar collectors, all-glass vacuum tube solar collectors, heat pipe solar collectors, U-tube solar collectors, etc.), storage tanks, control systems, Pipe fittings and related accessories, building the end of the cooling equipment and other components.
Q:1000 square meters to warm how much electric boilers, where to sell?
1000 square meters to warm how much electric boilers, where to sell?...

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range
客服
live chat