Floor Heating Mat for Floor Heating System

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
2500 m²
Supply Capability:
3000000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description of Product:

Floor Heating Mat for Floor Heating System


Floor  Heating Mat for Floor Heating  System


Floor  Heating Mat for Floor Heating  System


① why from okorder?

Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.

All products had been produced under a clear quality standard and the quality is consistence among the shipments.

Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.  

②How to guarantee the quality of the products?

We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.

QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery, 

③How long can we receive the product after purchase?

Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Can home heating heat sinks be placed under the TV?
Can not, the following hot air will bring up the dust, look at the warmer above the walls are more dirty to know
Q:Since the heating is good or good warm
Of course, is still good and plumbing, cost-effective
Q:Geothermal coil spacing is too hot not how to do
Home improvement 200. works 350...
Q:The water in the heating furnace is often good
Bad, often change the water easy to rust. Repeatedly boiled water is low in oxygen.
Q:Does the gas ratio valve of the boiler be airtight
It is best not to disassemble and repair,
Q:PE-RT II oxygen-resistant heating tube custom specifications manufacturers where?
PERTII-type oxygen to warm the pipe has been popular in foreign countries, the domestic pe-rtII oxygen to warm the current tube is still the ranks of high-end heating pipe, slowly will be popular; pertII oxygen to a good solution to solve the problem of oxygen permeation To warm the system in the installation and use of metal components to meet, such as valves and other metal parts, the general pert to warm the plastic and other plastic bite the body of the abundance of the agent by the ax of the hot water circulation process metal parts can easily be corroded, This will be detrimental to pe-rt to the long-term use of the warm-pipe system, the new pertII oxygen to warm the tube to solve this problem, so that the heating system to greatly improve the life of the heating system to ensure that the pe-rtII to warm the system safe use 50 Years or more.
Q:How to determine the heating pipe test pressure
Google library solution
Q:Casing head test pressure process
1. Test pressure single test pressure and system test pressure, single test pressure: pipe laying or hidden parts of the pipeline after the completion of installation and design requirements according to the requirements of water pressure test. System test pressure: heating system installed according to the design and specification requirements for system water pressure test. 2. Heating, air conditioning system test procedures: a first check the entire system of all control valves are open, the system should be separated from the outer pipe network, open the gas tank release valve. B will be the water supply pipe, test pressure pump and other temporary pressure test pipe connected to the main water supply pipe, and irrigation to the system until the system filled with water and the pipeline system after the air drained (put the wind gate workers The valve out of the water so far), close the release valve; c operation test pump to boost, boost the process should pay attention to check the management, fittings and accessories are leaked, such as leakage should stop the pressure, and after the buck Repair, change pad, tighten and so on. D system without leakage, the pressure and boost to the test pressure, stop the pump check, and observe the pressure gauge, requiring 10 minutes pressure drop of not more than 0.02Mpa, that is qualified.
Q:What is the working principle of air source heat pump and what is it?
What is the working principle of air source heat pump and what is it?...
Q:You are registered or heating works basically useless...
Home wall boiler attention to what the use of boiler concerns...

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range