• Water return Value and water distributer  For Floor Heating  System System 1
  • Water return Value and water distributer  For Floor Heating  System System 2
  • Water return Value and water distributer  For Floor Heating  System System 3
Water return Value and water distributer  For Floor Heating  System

Water return Value and water distributer For Floor Heating System

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
50000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description:

Manifold for floor heating 


Specification:

materail:304 stainless steel 

size:1" *3/4" 2-12 loop 


Features:

1.With visual flowmeters in supply part to adjust the flow of each loop precisely.

2.With thermoelectrical motor and control valve in return parts to control the temperature automatically in the system.

3.The exhausted gas in the system can be released automatically by the automatic exhaust valve.

4.Drainage valve is convenient for draining and pressure testing.

5.It is convenient for installation and maintenance with movable connection fitting.

6.Double-sealed, safe and reliable.


Photo:


Water return Value and water distributer  For Floor Heating  System

FAQ:

① why from okorder?

Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.

All products had been produced under a clear quality standard and the quality is consistence among the shipments.

Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.  

②How to guarantee the quality of the products?

We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.

QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery, 

③How long can we receive the product after purchase?

Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.






Q:How to build electric heating
You find the warm company to consult
Q:Pavement should pay attention to what the details,
1. Handling and installation of pipe, the pipe surface shall not be scratched, slightly hurt; The pipe should be laid on the soft and flexible surface, and no hard sharp objects; A folder for the better, and less plug-in connection; The pipe is fixed with plastic tube card is better; 6, has been doing the low temperature to warm, is strictly prohibited on the ground ticking nails, holes or stacking heat 7, after the installation of the geothermal system, at least two to three months and then pave the floor, so that the ground can be completely dry.
Q:To warm the accessories 3 / 4m * 16 * 20 what meaning
Is the specification model!
Q:20 kilowatts of electric boilers for large area of heating
1000 kW = 1 MW, then 20 kilowatts equivalent to 0.02 megawatts 1 MW of heating area can be an average of 5000 square meters 20 kilowatts can be heated area is about 0.02 * 5000 = 100 square meters 20 kilowatts of electric boilers can be 100 square meters of area heating
Q:My house can not live in the winter Zhangjiakou mouth in the north will not be frozen? I installed the warmth. More
Of course not. If that is not the case of the market? But now more and more people in use. So at night you can feel at ease! The The
Q:Is not to warm the total valve opened on the line, do not control the room valve
Not to warm the total valve is to ensure that the sub-catchment water supply. If the total valve is also open to see whether the automatic temperature control or manual. If it is manual to ensure that each sub-catchment water supply back to the water supply of small valves are in the open state, if it is automatic temperature control with the temperature control panel control actuator, set their own on the line. General temperature adjustment Manual adjustment of water supply back to the water below the small valve, automatic temperature control on the adjustment panel. The general test performance through the porphyrin shortage of stupid Wei Han Li back to the water pipe heat is not hot to know this road opened not open.
Q:Taurus to warm what is the characteristics of oxygen
Oxygen tube only in a closed circulatory system in the role of the central heating is no use. Business a selling point only, no real effect
Q:Seeking the whole process of the head test pressure, text description, detailed point,
1. Test pressure single test pressure and system test pressure, single test pressure: pipe laying or hidden parts of the pipeline after the completion of installation and design requirements according to the requirements of water pressure test. System test pressure: heating system installed according to the design and specification requirements for system water pressure test. 2. Heating, air conditioning system test procedures: a first check the entire system of all control valves are open, the system should be separated from the outer pipe network, open the gas tank release valve. B will be the water supply pipe, test pressure pump and other temporary pressure test pipe connected to the main water supply pipe, and irrigation to the system until the system filled with water and the pipeline system after the air drained (put the wind gate workers The valve out of the water so far), close the release valve; c operation test pump to boost, boost the process should pay attention to check the management, fittings and accessories are leaked, such as leakage should stop the pressure, and after the buck Repair, change pad, tighten and so on. D system without leakage, the pressure and boost to the test pressure, stop the pump check, and observe the pressure gauge, requiring 10 minutes pressure drop of not more than 0.02Mpa, that is qualified.
Q:Heating equipment have what kind of
Air conditioning, to warm, electric heater, fireplace, warm handbag is also considered it
Q:Whether the groove card can be used for heating pipes
Not suitable for the groove in the gasket is rubber material heat resistance is not high long-term thermal environment will cause the gasket aging caused by leakage

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords