Water return Value and water distributer For Floor Heating System

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
50000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description:

Manifold for floor heating 


Specification:

materail:304 stainless steel 

size:1" *3/4" 2-12 loop 


Features:

1.With visual flowmeters in supply part to adjust the flow of each loop precisely.

2.With thermoelectrical motor and control valve in return parts to control the temperature automatically in the system.

3.The exhausted gas in the system can be released automatically by the automatic exhaust valve.

4.Drainage valve is convenient for draining and pressure testing.

5.It is convenient for installation and maintenance with movable connection fitting.

6.Double-sealed, safe and reliable.


Photo:


Water return Value and water distributer  For Floor Heating  System

FAQ:

① why from okorder?

Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.

All products had been produced under a clear quality standard and the quality is consistence among the shipments.

Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.  

②How to guarantee the quality of the products?

We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.

QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery, 

③How long can we receive the product after purchase?

Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.






Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The first time this year, warm, how should open, pay attention to what
Open the pipe cutting door, open the small tube to warm the door, the water separator to open, to the water discharge....
Q:Owners in the decoration before the obligation to suppress the warm
I was in October 2009 to get the key to the house, small property, but no evidence, on the 3rd floor. At that time the house has been built for two years, when we are a collective decoration. I was renovated in December 2009, was not to warm to suppress, to warm the project to do, at the end of this year when the second floor of the notice received, said his roof leakage, after investigation, confirmed that my family To warm the emergence of a problem, contact the developer, the beginning of the arc 粻 post to save the cheat brother wedge workers did not come over, our property is composed of the village committee, and now I have been paved to the ground, and carpentry has done, Ground to warm, the village committee said to pay part of the money, but not enough of my decoration loss, how should I do? Attached: I am not looking for the decoration company installed, all the renovation projects are looking for the relationship, then the decoration process, there is no damage to the warm 1. I did not suppress the decoration before the warm, I was in the decoration before the obligation to pressure to warm The 2. At that time to do the closure of the test when the second floor has been unable to contact, the current floor to warm this cost and my decoration loss, who should bear? Do I have any responsibility? Who is more responsible? 3. At present, the cost of compensation for the village committee, even the normal pavement money do not come down, how can I do? 4. If the lawsuit, I was the one which side? More...
Q:Electricity to warm and water to warm contrast
Before the water is warm, it is electric to warm. The first is because the gas costs continue to rise, and electricity began to appear electricity peak and trough, the second is because the water can not be closed after the warm, can not be laid single room, and now warm home warm, warm floor, According to the time, the district of different ways of the switch, power consumption is also low, so what is better and worse than the factory to determine Yao Deng witnessed super cunning, landlord should understand....
Q:Selection of electric heating stove
Selection of electric heating stove...
Q:200 flat house with a few vertical air conditioning can be warm
200 square meters with air conditioning why not consider the use of warm land. Or air can be combo
Q:Who used a small squirrel boiler. That model is easy to use?
Ha ha obviously sell the boiler most people know so clearly?
Q:What are the structural materials for the heating of household boilers?
Insulated material of water and electricity separation of ceramic electric heating pipe
Q:My home to the new clothes to warm and found no water filter, this water separator, to warm the company that nothing, we say can do?
Equipment and do not install the difference is not big. There are about three kinds of dirt in the water, scale, biological algae mud, rust, as follows: (1) scale: scale generation principle is that when the water heating, the water calcium and magnesium ions in the case of heating production precipitation, Said the scale. The critical temperature of the scale is 60 ° C. When the temperature is below this value, the amount of fouling is very small. When the temperature exceeds this value, it will fouling, and the warm water supply temperature is usually 55 ° C to 60 ° C Below the threshold. Plus floor heating is a closed system, which is always only so much water in the cycle, is a one-time scaling. So the scale of the warm in the warm, very negligible. (2) biological algae mud: In fact, most of the dirt in the water are biological algae mud. That is, bacteria, algae and other microorganisms in the water a lot of breeding formed, these microbes die after the adhesion to the wall, over time to form a biological algae mud. However, if the use of oxygen pipeline, so that oxygen can not enter the pipeline system inside, in the case of hypoxia, these microorganisms can not survive, you can put an end to the formation of dirt. At present, there is no oxygen barrier concept, so the domestic pipeline are not oxygen, only Germany have oxygen standard, the standard is DIN4726. (3) rust is due to the warm metal parts inside the formation of oxygen corrosion, metal in high temperature, high humidity, aerobic environment can easily be corroded. The general business has nothing to do with this. A little better business will add a system called Fenox F1 protection agent, it can slow down the rate of oxidation of metal, but the presence of oxygen corrosion. The real way to solve the problem is to prevent the oxygen into the system, that is, and the above mentioned the same, the use of oxygen pipeline.
Q:I intend to do warm, but the warmth of the company recommended to me is the oxygen to warm
Do not listen to those fudgy theory of oxygen barrier pipe can indeed reduce the water fouling and bacteria in the water, but this is just a separate manufacturer of gimmicks, the state is now out of oxygen standards are not out of it. You can ask in detail to warm the company's oxygen coefficient and anti-scaling factor, absolutely asked silly bite open satin and so persuade him at the slide. The water in the warm pipe is the boiled water from the heating boiler, and no one wants to use the water to bathe and drink
Q:The use of boiler should pay attention to what matters - safe use of boiler safety precautions
The use of boiler should pay attention to what matters - safe use of boiler safety precautions...

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range