Three Layer Engineering Flooring For Flooring Heating
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1500 m²
- Supply Capability:
- 100000 m²/month

- OKorder Service Pledge
- Quality Product
- Order Online Tracking
- Timely Delivery

- OKorder Financial Service
- Credit Rating
- Credit Services
- Credit Purchasing
Description of product:
Three Layer Engineering Flooring For Flooring Heating
Specification:
European/Russian oak engineered flooring
Antique Style
Saw cut veneer
old style oak flooring
Features:
(1) Beautiful looking;
(2) Fashionable, popularly in the world market;
(3) Easy to install and maintain;
(4) Environment-friendly
Photos:
FAQ:
① why from okorder?
Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.
All products had been produced under a clear quality standard and the quality is consistence among the shipments.
Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.
②How to guarantee the quality of the products?
We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.
QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery,
③How long can we receive the product after purchase?
Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.
- Q:Air to warm running costs are not high, 100 square meters a month about how much money?
- Probably in the four or five hundred yuan left 粻 笭 Gang locusts Hao Hao Tong Jun right, but the regional environment, housing insulation performance also affect the operating costs, such as energy efficiency in the South and the North will be different....
- Q:What kind of pipe is better to use, which is more used?
- Now do warm is basically more PEX tube...
- Q:Want to ask the big flower lamb lengyi only cut sweep the radicals do not know how to sell electric boilers, you can connect to warm, heating, our home area of 85 or so, want to heat the area of 60-70, to buy much The ah More
- You might as well press the power to warm Nexans electric heating is now the best
- Q:How long can I use water? How much does it cost each month? Which is the most professional to warm?
- Theoretically can be 50 to 70 years, if the maintenance may be longer, plastic in the ground is difficult to corrosion, and generally not bad, but part of the metal parts for a long time to change it. But the maintenance is not good for decades do not clean, maybe it will be blocked. Charges, according to traffic charges is the future trend, which depends on the home requirements of the water temperature. Professional? This is not good to say, I installed when the election of more than 20, and finally the million OKorder for high Jia 薨 spring hong pseudo for the construction of the sickle moved me, I am very good at his home image.
- Q:Home 200 square meters electric heating boiler
- Home 200 square meters electric heating boiler...
- Q:Water pressure test should meet the requirements
- (1) The hydrostatic test shall be carried out after the system has been flushed. (2) water pressure test should be per component, the collector as a unit, by group or by loop. (3) water pressure test should be carried out twice, respectively, before the pouring of concrete before the reign of rough rougers and the filling layer after the expiration of the maintenance of the filling tube; the best heating pipe laying before doing a test. (4) the test pressure should be 1.5 times the working pressure, and should not be less than 0.6Mpa. (5) test method: the test pressure, the regulator 1h, observe the pressure drop, if the pressure drop is not greater than 0.05Mpa, that qualified. (6) water pressure test should be used to slow down the manual pump, boost the process to observe and check the presence or absence of leakage. (7) in the case of freezing may test pressure, the pressure test pressure should be completed after the tube of water to dry, but only the air pump is blowing is not clean, it is recommended to use warm cleaning special tools, Each road tube, for drainage, so that the real guarantee of each tube, there will be no drop of water to ensure that no pipe freezing, practice has proved that there are many use of air pressure test.
- Q:Carbon crystal heating plate how much electricity
- Carbon crystal heating plate each piece of power 250w, generally a 15 square meters around the room to use four, an hour once electricity. The temperature continued to decline in the daily power consumption is relatively large. Not every family are suitable for installation, can not open all day, master the indoor and outdoor temperature difference, the thermostat to be adjusted. Can only carbon crystal hot plate as a useful supplement. Carbon crystal heating plate that "carbon crystal heating low temperature radiation heating system." Is a carbon crystal heating plate as the core components and developed a new type of low temperature radiation heating system. Carbon crystal heating plate principle: in the electric field, the heating element in the carbon molecules produce molecular motion, carbon atoms between the intense friction and impact, the heat generated by far infrared radiation and convection in the form of external transmission, Its power and heat conversion rate as high as 98% or more. Carbon crystal hot plate system makes full use of carbon crystal plate excellent surface heating characteristics, heating the whole plane temperature, continuous heating, good heat balance effect. To overcome the traditional heating products, heating is not continuous, poor heat balance effect of the disadvantages.
- Q:What is a family independent heating system
- Have an independent heat source, generally refers to the wall boiler, or an independent heating boiler.
- Q:120 square meters installed Bosch to warm about how much money? Question added: Bosch's warm overall effect, quality how? What kind of similar to the warm cost-effective more
- Ningxiang to warm, preferred Bosch. Brand strong, aftermarket is good, the technology did not have to say
- Q:Who used a small squirrel boiler. That model is easy to use? Can you talk about its practicality!
- Ha ha obviously sell the boiler most people know so clearly?
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Similar products
New products
Hot products
Hot Searches
Related keywords
You Might Also Like