• Simple Thermostat  For Floor Heating  System System 1
  • Simple Thermostat  For Floor Heating  System System 2
  • Simple Thermostat  For Floor Heating  System System 3
  • Simple Thermostat  For Floor Heating  System System 4
Simple Thermostat  For Floor Heating  System

Simple Thermostat For Floor Heating System

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
100 pc
Supply Capability:
50000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description:

Electric thermostat for floor heating  or hot water radiator heating systems 

Model Number: TR90


Specifications

TR90 floor heating room thermostat 

Temperature range:5-30 C 

Contact capacity: 16A(4)/250V 

Sensor type: gas filled sylphon

Diamension: 80X80X37MM 

Voltage: 110(± 10%)VAC / 220(± 10%, -15%)VAC, 50/60Hz  24VAC ( option)  

Differential Temperature: 1 ° C Max 

Setting Temperature Range: 5° C~35° C 

External Limitation: 5°C~60°C( factory setting 35°C) 

Mounting: Mounts directly onto wall or wall-box 

Temperature range: 0° C - 40 ° C 

Sensor type: NTC 

Color: White ivory 

Relative humidity: < 85% (23 ° C) 

Housing material: anti-flammable PC

Dimensions: 86mm× 86mm× 13mm(H/W/D) 


Basic function: 

1. Recommended for control of underfloor heating and electrical heating. 

2. Electronic on/off control up to 3600W, 16A or 6000W, 30A 


Photo:

Simple Thermostat  For Floor Heating  System


FAQ:

① why from okorder?

Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.

All products had been produced under a clear quality standard and the quality is consistence among the shipments.

Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.  

②How to guarantee the quality of the products?

We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.

QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery, 

③How long can we receive the product after purchase?

Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.

Q: How to connect the natural gas boiler
There are five tubes below the natural gas boiler, look at the instructions you will understand. They are: heating water, heating back to the water, tap water, sanitary hot water, gas pipe. 1, connected to warm, then, is the "heating water", "heating back to the water," the two water pipes connected to the floor to the water heater, the warm water separator has two rows of metal valves, two joints, and the boiler Of the heating water, heating back to the water two interface docking. Usually above a row of water supply, the following row of water back. But it does not matter. 2, the gas pipe and the gas pipeline to be connected at home, if the home inside the gas pipeline only one connector, to take a three links before they can connect the boiler and gas stove. 3, tap water, and the home should be connected to the water pipe, used to add pressure to the heating system, and the supply of bath, wash your face, vegetables and other water. 4, sanitary hot water and water, and the need for hot water at home tap, such as shower, washbasin, wash the pool and so on. Note 1, 1, the connection of the boiler related to the installation of gas pipeline transformation, the need for a corresponding qualification, and to the local gas company to declare. 2, in the clear understanding of each interface before the boiler, do not rush to connect, boot, so as to avoid damage to the boiler parts. 3, the boiler / floor heating work pressure generally 1-1.5bar between the working temperature of 45-55 ℃ between. Too high temperature and pressure, is not conducive to the warm life. Maidi Si boiler, dedicated to your service.
Q: Rooftop electric film from the heating how?
In the early years, many of the time to do so, but the effect is not good, are now doing on the ground.
Q: Home new house ready to install warm, to ask a few, each pipe is not the same, and the price difference is also more, do not know the clerk said that the ravages of the destruction of the slander, It is difficult to judge Yeah, there is a friend know, or the home installed to mention the comments, more urgent ah! The More
As long as the PERT material can be
Q: Dual-use boiler is also only one burner, then the life of hot water and heating hot water is how to burn at the same time? More
Dual-use fireplace life hot water, heating function is not working, and always life is hot and dry tripod scraping scraping calcium state water abalone priority, no life hot water demand and then switch to heating, casing machine and plate change Machine life hot water function is different
Q: To warm the company which installed the best
To warm the installation to consider a lot of factors, or please warm the company to warm it
Q: To install the mixed water center also installed with a pressure differential bypass valve
Mixed with a pressure valve is not?
Q: Water tank plus electric heating tube to give warm when the heat source
If you only use this water when heating, it is possible. But pay attention to the cycle
Q: What is the difference between a warm water and a water separator?
The role of the water separator is the heat source of hot water separately into each side of the ground radiation heating pipe laying, to achieve sub-room heating and temperature adjustment purposes. The sump is a combination of low temperature water in each way after the heat dissipation is separated and fixed to the wall or the ground. The manifold and the sump are made up of supervisors, shunting valves and joints, exhaust valves, drain valves, and terminal plugs. The use of sub-catchers effectively avoid the loopholes in water management, centralized installation, management of water meters, and with single-tube multi-channel.
Q: What is the geothermal decoration process?
First to do the original ground leveling, and then covered with insulation materials, the top of the laying of warm water pipes, and then laying a layer of insulation materials, and then above the mortar leveling
Q: How to do with the warm pipe
Find professional cleaning geothermal master to help you clean, will be resolved. do not worry....

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords