• New Digital Thermostat  For Floor Heating  System System 1
  • New Digital Thermostat  For Floor Heating  System System 2
  • New Digital Thermostat  For Floor Heating  System System 3
  • New Digital Thermostat  For Floor Heating  System System 4
New Digital Thermostat  For Floor Heating  System

New Digital Thermostat For Floor Heating System

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
50 pc
Supply Capability:
50000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description:

New Electric Thermostat for Floor Heating 

Model Number:  C16.H


Specifications

Load: 3A/16A 

Voltage: 110(± 10%)VAC / 220(± 10%, -15%)VAC, 50/60Hz  24VAC ( option)  

Differential Temperature: 1 ° C Max 

Setting Temperature Range: 5° C~35° C 

External Limitation: 5°C~60°C( factory setting 35°C) 

Mounting: Mounts directly onto wall or wall-box 

Temperature range: 0° C - 40 ° C 

Sensor type: NTC 

Color: White ivory 

Relative humidity: < 85% (23 ° C) 

Housing material: anti-flammable PC

Dimensions: 86mm× 86mm× 13mm(H/W/D) 


Basic function: 

1. Recommended for control of underfloor heating and electrical heating. 

2. Electronic on/off control up to 3600W, 16A or 6000W, 30A 

3. Setting daily 4 periods of programmable, time settings, Kinds of periods of time modes. 5+2 / 6+1 / 7days

4. Large Back-lit display, LED screen, easy-to-see and read 

5. Infrared remote-controlled function(option) 

6. Built-in interrupter 

7. Two work mode switchover: ( programmable ,non programmable) 

8. Display temperature recalibrates 

9. Low temperature protection function 

10. Surveys, display and set room temperature 

11. Memory function: Parameters are permanently held in memory and retained during power outages 

12. Anti-freezing protection 

13.2-sensor: Built-in Room sensor , floor limiter sensor  ( floor limiter sensor is option) 


Features:

high quanlity with competitive price 

OEM / ODM TUV and CE


Photo:

New Digital Thermostat  For Floor Heating  System

FAQ:

① why from okorder?

Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.

All products had been produced under a clear quality standard and the quality is consistence among the shipments.

Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.  

②How to guarantee the quality of the products?

We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.

QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery, 

③How long can we receive the product after purchase?

Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.


Q:To install the mixed water center also installed with a pressure differential bypass valve
The role of mixed water center is mainly to adjust the warm water supply problems, to achieve automatic control of water supply temperature. Reason: According to the provisions of the country to warm the installation, the water temperature should not be higher than 60 ℃: 1, to prevent the warm water in the warm pipe, water mixers and other heating system components in the scale. 2, to warm the pipe material for the plastic material, the higher the temperature of the working environment, the greater the pressure, will shorten the warm life. Municipal central heating more in accordance with the heating film heating temperature of 80 ℃ to the water, far more than the warm to apply the highest temperature. The mixed water center can mix the low temperature water of the heating system backwater into the water supply pipe, lower the heating water temperature, and then supply it to the floor. Refer to the following figure: Madison fireplace, dedicated to your service.
Q:The first time this year, warm, how should open, pay attention to what
Open the pipe cutting door, open the small tube to warm the door, the water separator to open, to the water discharge....
Q:What parts of the radiator (radiator) heating system?
Generally, there are some auxiliary equipment such as circulating pump, expansion tank, make-up pump, etc.
Q:Will the warm winter do not burn?
Is the ice will be bad, the water will not be bad.
Q:What is the difference between a warm water and a water separator?
The role of the water separator is the heat source of hot water separately into each side of the ground radiation heating pipe laying, to achieve sub-room heating and temperature adjustment purposes. The sump is a combination of low temperature water in each way after the heat dissipation is separated and fixed to the wall or the ground. The manifold and the sump are made up of supervisors, shunting valves and joints, exhaust valves, drain valves, and terminal plugs. The use of sub-catchers effectively avoid the loopholes in water management, centralized installation, management of water meters, and with single-tube multi-channel.
Q:What is the geothermal decoration process?
Process: 1, in the case of the ground flat before the first with about 5MM of benzene board will be all the pavement covered with the ground. 2, in the benzene board covered with a layer of insulation film. 3, in the insulation film laying geothermal tube. Here need to pay attention to, every square meter should be laid around the heat pipe 5M can not have any joints. The spacing between tubes and tubes should be appropriate at 20CM. 4, after the completion of geothermal pipe laying on the top of the hourglass (that is, sand sands save things). 5, finally, in the above with about 1: 5 cement mortar leveling. (Absolutely can not be calendering, otherwise affect the cooling effect. I will not say the first brick) Note: 1, geothermal company's choice. Congratulations, hidden projects do not save, we must choose a qualified, strong, good reputation, professional and strong, rich experience in the construction of geothermal companies, signed a formal contract. This is the decisive condition for ensuring the quality of the project. 2, the choice of geothermal pipe. Do not be confused by the low offer, geothermal pipe quality of the good and bad, a direct impact on the life of geothermal engineering, the choice of good quality underground pipe, floor components (including water separator, valves, filters, etc.). Step back, even if the future quality problems, the pipe manufacturers will have some compensation. 3, the choice of the best parts of the ground are all qualified quality copper parts. Geothermal engineering underground part of each road must be a complete tube, can not take any form of connection In fact, after the cement mortar filled with what pipe is not important (but can not use too rubbish). In fact, when the shop is most afraid of heat resistance (air resistance: that white is the tube in the air). So in the shop when the heat, especially immediately before the backfill must let the workers carefully check the good.
Q:My home is rural, in the floor before the ground should be the first shop or what to do to prepare? And what is its structure, how to coil (and the spacing of the tube), and how to warm into the water pipe and each room of the coil how to connect (not ask what to take together)? My house is a floor tile, would like to shop to warm and tiles do not want to dig out. So I would like to use the sand to do to fill the design and production of the floor, the second is to use the sand cost can be lower and the heat of the heat than the heat more heat
My home is rural, in the floor before the ground should be the first shop or what to do to prepare? And what is its structure, how to coil (and the spacing of the tube), and how to warm into the water pipe and each room of the coil how to connect (not ask what to take together)? My house is a floor tile, would like to shop to warm and tiles do not want to dig out. So I would like to use the sand to do to fill the design and production of the floor, the second is to use the sand cost can be lower and the heat of the heat than the heat more heat...
Q:Household gas boiler classification
Household gas boiler classification...
Q:Which brand is good to warm the mixer?
Tsinghua Tongfang
Q:My home to the new clothes to warm and found no water filter, this water separator, to warm the company that nothing, we say can do? Blocking how to do
Must be installed filter, stainless steel mesh on the line. To warm the company does not install their own equipment, although the warm pipe can also be cleaned, but that much more trouble.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords