• Laminated Flooring For Flooring Heating System System 1
  • Laminated Flooring For Flooring Heating System System 2
  • Laminated Flooring For Flooring Heating System System 3
Laminated Flooring For Flooring Heating System

Laminated Flooring For Flooring Heating System

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
2500 m²
Supply Capability:
1000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description of Product:

Laminated Flooring For Flooring Heating


Specificaiton: 

1215*195*7mm

1215*195*8mm  1215*143*8mm  1215*125*8mm 808*100*8mm  808*90*8mm

 808*148*12mm  808*130*12mm  1215*195*12mm 1215*165*12mm 1215*143*12mm 1215*126*12mm                
2.Click system: uninlin/Arc\Double\Single
3.HDF\MDF
HDF  900kg\m3  at  least
MDF  880kg\m3  at least
White\Green  core 

4.Available Surface: Crystal Surface, Embossed surface,Hand-scraped Surface, Peal Surface,

                                   High Glossy Surface, Real Wood Texture Surface, Synchronized Surface. 
5.Balance paper: Grey\Yellow\Brown\Beige
6.Resistance grades: AC1,Ac2,AC3,AC4 


Features:

(1) Beautiful looking;
(2) Fashionable, popularly in the world market;
(3) Easy to install and maintain;
(4) Environment-friendly
(5) Save the hardwood, save the forest;


FAQ:

① why from okorder?

Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.

All products had been produced under a clear quality standard and the quality is consistence among the shipments.

Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.  

②How to guarantee the quality of the products?

We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.

QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery, 

③How long can we receive the product after purchase?

Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.

Q:Is a new type of wall-mounted heating panels, electricity is one-third of air conditioning
Mainly to see how your room insulation effect. Insulation is good what kind of heating are staring at the top of the hugs who bluntly blunt who touch OKorder more provincial. With electric film or heating cable foot heating effect better
Q:Do you have a good geothermal cleaner?
OKorder workers to warm the washing machine is very good operation, the Internet has a video operation. The specific operation steps are as follows: 1. Close the manifold main control valve and also open the sub-valve is also closed. 2. Place the drain on the side of the divider and install the quick connect. 3. The host pulse output, inlet pipe, water separator sewage pipe connected. 4. Check the various parts of the connection is not leaked open cleaning. Cleaning pipe Note: 1. The connection must be tightened to prevent leakage, must be inserted in the end of the tube, when the card must be broken to the end of the ring. 2. The drain end must be inserted into the sewer mouth to prevent contamination of the environment when it is discharged. 3. Before cleaning, be sure to ensure that every road to warm pipe without discount. 4. Cleaning should pay attention to the pump pressure to prevent the pipeline blockage pulse generator can not work properly, to stop the work analysis reasons. 5. The pulse generator found that there is leakage of water leakage phenomenon should stop working troubleshooting. 6. If you encounter the construction environment in the water source can be more distant piping connection.
Q:Heating equipment have what kind of
Heating equipment have what kind of...
Q:Heating bar electric heating and carbon crystal heating which power saving
Carbon crystal heating power
Q:Members of my dear friend, brother house this winter can not live, but this heating fee is expensive, ah, want to stop, afraid of the temperature is too low, the warm tube to crack. Would like to ask experienced friends, what advice? Is not to put the pipe in advance of the water out of the ah, the stare out of the box of meat, Or simply do not have to drain the water is not bad, thank you more
Too cold, if the indoor temperature below 5 ℃ will crack. If you do not need to do some maintenance. Maintenance methods: 1, the winter should not pay attention to heating, watertight parts should be prevented from cracking and heating pipe in the water clogging the pipeline. 2, do not be activated to prevent the water separator parts of the system after the installation of the winter is not enabled, such as indoor temperature below 5 ℃, should be the system of water with air compressor all blown to prevent the system by freezing; winter Do not enable geothermal heating system should pay attention to protection, to prevent the water cut parts or water heating pipe in the ice.
Q:To warm the company which installed the best
To warm is a complex system, the installation of a large number of components to choose, even if the product quality is good, but the performance of lamb bite to find the rescue is to find that if the installation is not in place or very easy to problems, or to the old, professional big company There is a guarantee.
Q:Solar water heating system energy-saving projects in what energy-saving sub-item, heating energy-saving projects Well?
You are registered or heating works basically useless
Q:Does the gas ratio valve of the boiler be airtight
The gas proportional valve is mainly based on the current command or load demand of the main control board of the boiler, instantaneous opening, shutting off the gas source or in the air supply state, according to the different needs of heat load, current affairs to reduce or increase the gas flow A combustion system components, generally consists of two safety off valve and Fuhai Dili destroy Gao Ji Dian top hug a proportion of regulating valve composition. If the gas ratio valve fails, then it may cause the boiler to work properly. General recommended direct replacement, maintenance is relatively cumbersome, not necessarily repaired.
Q:Home to install 400 atmospheric boiler on the first floor, to the second floor for the warm, the water tank in the boiler next to the circulation pump is 500 watts head 8 meters, equipped with a check valve, Equipment into the export are installed automatic valve, but the temperature of a 40 degrees there is gas parked in the pump, the hot water on the up, please enlighten me master
There are two factors that affect your pump work: First, the pump long-term flow is small or sometimes no flow (which may be temperature control action and other reasons), then the pump kept turning the pump hot water temperature vaporization. Second, the pipeline installation problems, the pump can not automatically row of the system row row of the law of the degree of defense, but the power point, automatic discharge. Solution: The reason is determined by the nature of the system, not easy to change, you can change a way to control the way through the pump to control the indoor temperature (of course, a pump to a number of room heating, this law does not work) The The reason two need to transform the pipeline, you use the pump is generally a pipeline pump can be changed to vertical installation, and the installation height is lower than the water separator, the middle do not impede the bubble rise of the parts and elbow, so pump bubble Can be automatically discharged into the water separator, and then through the automatic exhaust valve discharge.
Q:Do you have a brand name?
Should have it, this you can go to the Internet query, in fact, only online inquiries, because they do not know where the 粻 笭 Gang locusts Hao Hao Tong Jun Kun. But to warm the tube also has the brand of St. Lawrence, before the main to do the radiator, and now warm to do is also good.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords