• Laminated Flooring For Flooring Heating System System 1
  • Laminated Flooring For Flooring Heating System System 2
  • Laminated Flooring For Flooring Heating System System 3
Laminated Flooring For Flooring Heating System

Laminated Flooring For Flooring Heating System

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
2500 m²
Supply Capability:
1000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description of Product:

Laminated Flooring For Flooring Heating


Specificaiton: 

1215*195*7mm

1215*195*8mm  1215*143*8mm  1215*125*8mm 808*100*8mm  808*90*8mm

 808*148*12mm  808*130*12mm  1215*195*12mm 1215*165*12mm 1215*143*12mm 1215*126*12mm                
2.Click system: uninlin/Arc\Double\Single
3.HDF\MDF
HDF  900kg\m3  at  least
MDF  880kg\m3  at least
White\Green  core 

4.Available Surface: Crystal Surface, Embossed surface,Hand-scraped Surface, Peal Surface,

                                   High Glossy Surface, Real Wood Texture Surface, Synchronized Surface. 
5.Balance paper: Grey\Yellow\Brown\Beige
6.Resistance grades: AC1,Ac2,AC3,AC4 


Features:

(1) Beautiful looking;
(2) Fashionable, popularly in the world market;
(3) Easy to install and maintain;
(4) Environment-friendly
(5) Save the hardwood, save the forest;


FAQ:

① why from okorder?

Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.

All products had been produced under a clear quality standard and the quality is consistence among the shipments.

Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.  

②How to guarantee the quality of the products?

We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.

QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery, 

③How long can we receive the product after purchase?

Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.

Q:To warm the winter can not live without water can be frozen to warm it?
Too cold, if the indoor temperature below 5 ℃ will crack. If you do not need to do some maintenance. Maintenance methods: 1, the winter should not pay attention to heating, watertight parts should be prevented from cracking and heating pipe in the water clogging the pipeline. 2, not to be activated when the watertight parts to prevent cracking, the system is not installed after the winter that year, such as indoor temperature below 5 ℃, the system should be all the air with air compressor blowing, to prevent the system by freezing. Winter should not be enabled when the geothermal heating system should pay attention to protection, to prevent the water diversion components or heating pipe in the water icing.
Q:Silicon crystal floor heating is not very expensive to use it
Silicon crystal to warm the heating industry is the cheapest bar, compared to the home before the air conditioning to save more money.
Q:How to do with the warm pipe
Find professional cleaning geothermal master to help you clean, will be resolved. do not worry.
Q:To warm the company which installed the best
To warm is a complex system, the installation of a large number of components to choose, even if the product quality is good, but the performance of lamb bite to find the rescue is to find that if the installation is not in place or very easy to problems, or to the old, professional big company There is a guarantee.
Q:How to connect the natural gas boiler
How is the natural gas boiler connected to the warm pipe? Of course, through the water separator and the water collector to connect.
Q:I see the panel has a "cycle of digital time relay", the United States called microcomputer controller, as well as seismic pressure gauge, the rest is the switch indicator light, and there is no knowledge of what (estimated that there are two A solenoid valve a tube of water a gas), this thing on the market to sell more than 2000, I feel the cost of 200 to 300 yuan (guess, because I do not know where the burden of the child to pay the nuclear shop is too much money). Hope to tell the internal structure, which there are any components, I would like to do one, have a better picture, as well as cleaning, "time relay" set parameters (water and ventilation time), hope you greatly educated, brother Thank you The More
Practice has proved that the method of pulse geothermal cleaning is far from the effect of good projectile, the so-called pulse is a pulse device, the name is the water to form a spiral to play out, and then rotate in the pipeline flow to the flushing pipe wall The role of the general situation are part of the water block part of the blockage is serious, the mouth can not get into the water how will rotate in the wall? I have been engaged in geothermal cleaning has five or six years, the pulse of the basic method is a hammer , The effect is very poor, and always call me this is not hot, obviously not hot, so less than a last resort I will not use the pulse, and only those who can not be demolished, or with the projectile. Since you have been demolished on a demolition in the end chanting, that thing is very simple, the cost of the burden of the child from the nuclear shop as you said it is one or two hundred dollars, only two solenoid valves, and a control of the intensity Small board, purely bluffing stuff
Q:To warm the warranty period from when to count
First, to warm the warranty period is generally the beginning of the check if the developer is to do the warmth of the warranty period for the two heating period. Second, the "home quality guarantee" warranty period from the developer will be completed acceptance of the use of housing from the date of calculation. Third, the specific quality of the warranty period and the warranty period is: the foundation and the main structure within a reasonable life life; roof waterproof for 3 years; wall, kitchen and toilet ground for 1 year; general agreement basement and pipeline leakage For 1 year; wall, ceiling plaster layer off for 1 year; ground empty drum cracking, large area sand for 1 year; doors and windows cracked, hardware and sanitary ware damaged for 1 year; lamps, electrical switch damage to 6 Month; pipe block for 2 months; heating and cooling system equipment for the two heating period or the heating period; other parts, parts of the warranty period, agreed by the buyers and sellers, and written in the project quality assurance.
Q:Electric heating furnace in the resistance wire and magnet wire which is a good power saving it
Resistance wire high thermal quality, power saving and durable wire
Q:Which brand is good to warm?
First of all you have to understand, to warm is a system, not just a component or a product, to warm the brand is almost the quality of the company to warm and the installation process to decide. The heating company is indeed a difficult problem, need to consider a lot of factors, first, the company good reputation; second, the company size to large; third , With the quality of the material reliable, the best choice of a level of energy efficient boiler, and now high gas costs, can save a lot; Fourth, the construction should be standardized, have their own construction company or construction team; fifth, have special Of the after-sales department; this is my own home in the election heating company summed up, hoping to help you.
Q:Owners in the decoration before the obligation to suppress the warm...
I was in October 2009 to get the key to the house, small property, but no evidence, on the 3rd floor. At that time the house has been built for two years, when we are a collective decoration. I was renovated in December 2009, was not to warm to suppress, to warm the project to do, at the end of this year when the second floor of the notice received, said his roof leakage, after investigation, confirmed that my family To warm the emergence of a problem, contact the developer, the beginning of the arc 粻 post to save the cheat brother wedge workers did not come over, our property is composed of the village committee, and now I have been paved to the ground, and carpentry has done, Ground to warm, the village committee said to pay part of the money, but not enough of my decoration loss, how should I do? Attached: I am not looking for the decoration company installed, all the renovation projects are looking for the relationship, then the decoration process, there is no damage to the warm 1. I did not suppress the decoration before the warm, I was in the decoration before the obligation to pressure to warm The 2. At that time to do the closure of the test when the second floor has been unable to contact, the current floor to warm this cost and my decoration loss, who should bear? Do I have any responsibility? Who is more responsible? 3. At present, the cost of compensation for the village committee, even the normal pavement money do not come down, how can I do? 4. If the lawsuit, I was the one which side? More...

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords