• Ceramic flooring for Floor Heating System System 1
  • Ceramic flooring for Floor Heating System System 2
  • Ceramic flooring for Floor Heating System System 3
Ceramic flooring for Floor Heating System

Ceramic flooring for Floor Heating System

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1000 m²
Supply Capability:
3000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description:

Ceramic tile for floor heating system.


Specification:


Surfaceglazed, micro crystal 
MaterialPorcelain
Water Absorption<0.09%< span="">
MOQ500 SQMS
Packing Detail600x600mm: 4pcs/ctn 800x800mm: 8pcs/ctn
Colorsblue, brown, white, yellow, black, beige, etc


Features:

1. All products are top grade of ceramic Tile 

2. CE certificate, ISO9001

3. Special size available according to request.

4. Best Quality with best price, strictly quality control.

5. Delivery on time

6. Best after sale service, customer can follow their order situation any time, no matter on product line, warehouse or shipment.

7. Small order accepted.

8. Feature: no fading


Photo:

Ceramic flooring for Floor Heating System

FAQ:

① why from okorder?

Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.

All products had been produced under a clear quality standard and the quality is consistence among the shipments.

Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.  

②How to guarantee the quality of the products?

We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.

QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery, 

③How long can we receive the product after purchase?

Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.


Q: Can electric heating boilers and coal-fired boilers be able to share together?
As if not, have not seen these two strings with the use
Q: What are the advantages of home gas boiler?
The advantages of Fiseman's Boiler are: home gas boiler high efficiency, more features, can simultaneously solve the heating and water supply problems; heating the temperature of self-regulation, heating time can also limit their own, With the ax to take good control of the temperature of each room. At the same time the efficiency of its heating system to save gas, heating cycle power consumption is low. Is a good choice
Q: Is a new type of wall-mounted heating panels, electricity is one-third of air conditioning
Is a new type of wall-mounted heating panels, electricity is one-third of air conditioning...
Q: Home new house ready to install warm, to ask a few, each pipe is not the same, and the price difference is also more, do not know the clerk said that the ravages of the destruction of the slander, It is difficult to judge Yeah, there is a friend know, or the home installed to mention the comments, more urgent ah! The More
As long as the PERT material can be
Q: New to buy a house, construction area of 120 square meters, I heard that the installation of warm, do not understand to warm, do not know what to warm, how the cost?
The cost is high, 120 square feet, to make warm water price should be around 10,005, the monthly cost in 1000-1200, electricity and warm at around 20,002, the monthly cost 800-1000 ,, just installed before 3- 4 months, costs can even reach 3000, and then slowly down the initial installation fee in accordance equipment you use, is above the domestic price of imported equipment plus 10,000 other half 5--10 years we should overhaul, replacement equipment ,, guard in front of each year to be hungry thirsty budding pole leek blood Christine Ge Mount maintenance costs it 2-3 one thousand, but this kind of thing to warm a different air-conditioning, opened after 1-3 hours the effect to be fully out, so unless go out a couple of weeks, otherwise they can not turn off, to be always open; in short warm high cost of installation and use costs, 300 square feet or less of an area of ??land is not recommended warm, of course, if your family income is high, the cost of care To warm the effect is much better than the air conditioning, a lot of comfort, really warm like the feeling of spring, must be installed, or recommend water to warm, much better than electricity to warm, and the other equipment, in the house or rough when it is necessary find warm company People came to the site to do the design, there are some cross construction, put before the best house decoration scheme laid down,
Q: The first time this year, warm, how should open, pay attention to what
Open the pipe cutting door, open the small tube to warm the door, the water separator to open, to the water discharge.
Q: Water pressure test should meet the requirements
(1) The hydrostatic test shall be carried out after the system has been flushed. (2) water pressure test should be per component, the collector as a unit, by group or by loop. (3) water pressure test should be carried out twice, respectively, before the pouring of concrete before the reign of rough rougers and the filling layer after the expiration of the maintenance of the filling tube; the best heating pipe laying before doing a test. (4) the test pressure should be 1.5 times the working pressure, and should not be less than 0.6Mpa. (5) test method: the test pressure, the regulator 1h, observe the pressure drop, if the pressure drop is not greater than 0.05Mpa, that qualified. (6) water pressure test should be used to slow down the manual pump, boost the process to observe and check the presence or absence of leakage. (7) in the case of freezing may test pressure, the pressure test pressure should be completed after the tube of water to dry, but only the air pump is blowing is not clean, it is recommended to use warm cleaning special tools, Each road tube, for drainage, so that the real guarantee of each tube, there will be no drop of water to ensure that no pipe freezing, practice has proved that there are many use of air pressure test.
Q: Home heating stove, how about? Is not very costly, which brand is better.
Beautiful, very costly, power two thousand to six kilowatts
Q: To warm or water pipe leakage from the time of the warranty period
Installation of the general two-year warranty period. If there is a problem with quality without warranty

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords