1-4 way curved blade air vent linear diffusers air flow vent air conditioning
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 999999 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Air Diffuser
Supplying Air Diffusers
-Frame Thickness: 1.0mm /0.8mm
-Any Size be customed
-Powder Coated RAL 9010/9016
Our Service
1. Professional manufacturer of air vent for 7 years.
2. Factory price with high quantity and fast delivery.
3. High grade material and exquisite manufacturing acheives a good quality.
4. Freely sample is available before order.
5.Own anodized factory so diffent finish colour
Specification
1 | Item | HVAC aluminum air conditioner grille |
2 | Materials | Extruded Aluminum alloy (6063-T5) |
3 | Blade | Blades in 45°from aluminum profile or as customer’s requirements |
4 | Bar spacing | 30mm as standard or as customer’s requirements |
5 | Materials | 0.8mm, 1.0mm, 1.2mm, 1.5mm or according to the customers’ |
6 | Surface Finish | Powder coated, Anodized , PVDF, Mill finish. |
7 | Size | Width x Height, any sizes available |
8 | Powder for Finish | Environmental protection and non-toxic, and Color to keep 5 -10 years. |
9 | Color | Refer to RAL colors swatch or customized colors available |
10 | Design | Drawings designed according to the customers’ requirements |
11 | Payment terms | T/T, L/C, PYAPAL, etc. |
12 | Delivery time | Usual 15-20 work days for a 40GP container |
13 | Package details | Bubble wrap + Cartons for FCL, Bubble wrap + Cartons + Wood-box for |
14 | Mesh | Stainless steel security mesh, Aluminum security mesh |
15 | Type | Fixing and adjustable installation |
Products show
Company show
FAQ of Air Diffuser:
1, What's size do u have for round type diffuser?
A: We have face size from 150mm to 550mm,neck size from 250mm to 400mm聽
2, Do u still have other types ?
A: Yes, we have round diffuser/ rectangle diffuser/ linear grilles/ baseboard diffusers,etc
3, What's the most early delivery time?
A: Within 25 days for each 40'fcl
- Q: Can electric heating boilers and coal-fired boilers be able to share together?
- As if not, have not seen these two strings with the use
- Q: Electric heating furnace in the resistance wire and magnet wire which is a good power saving it
- Resistance wire high thermal quality, power saving and durable wire
- Q: Last year just cross the room, will the ground to freeze it? How big is it possible? If it is possible to crack, need to press to determine it? Question added: no live, to warm should be no water. More
- Too cold, if the indoor temperature below 5 ℃ will crack. If you do not need to do some maintenance. Maintenance methods: winter should not pay attention to heating, should prevent the water separator parts and heating pipe in the water clogging the pipeline. If the indoor temperature is lower than 5 ℃, the system should be used in the air compressor all blown out, to prevent the child fat forging forging crazy Fist Fist system is frozen. Winter should not be enabled when the geothermal heating system should pay attention to protection, to prevent the water diversion components or heating pipe in the water icing.
- Q: Does the gas ratio valve of the boiler be airtight
- The gas proportional valve is mainly based on the current command or load demand of the main control board of the boiler, instantaneous opening, shutting off the gas source or in the air supply state, according to the different needs of heat load, current affairs to reduce or increase the gas flow A combustion system components, generally consists of two safety off valve and Fuhai Dili destroy Gao Ji Dian top hug a proportion of regulating valve composition. If the gas ratio valve fails, then it may cause the boiler to work properly. General recommended direct replacement, maintenance is relatively cumbersome, not necessarily repaired.
- Q: Geothermal coil spacing is too hot not how to do
- The spacing is too large to increase the water supply temperature (& lt; 60 degrees), or to accelerate the hot water cycle
- Q: What is the basic task of heating engineering? The heating system is composed of some parts
- The basic task of heating engineering is to meet the needs of the heat load components: heat, heat, hot users
- Q: What is the mixing device in the warmth?
- 2. The use of electric three-way valve cooling water cooling device The advantages of this warm water cooling device is: (1) set with a thermostat and according to changes in water temperature control installed in the high temperature water inlet valve body opening, thus changing High temperature water intake,
- Q: To warm the type of too much, do not know what kind of election, and now the most is the kind of ah?
- You can try under the hot geese to warm.
- Q: Radiator parallel system how to take pictures
- The installation of the radiator is divided into two forms: the installation and installation of the radiator. The installation steps include the installation of the pipe, the installation of the radiator, the installation of the boiler, the pressure test and the customer acceptance. Trouble, need to slot and install the set of water, for the decoration of the housing, the general choice to install the radiator, installed both convenient and not damage the indoor decoration effect. 1. Laying the pipeline in advance with the customer to communicate with the location of the radiator after the installation of the need for the layout of the pipeline, the pipeline is generally in the ceiling, baseboard and other hidden places, the laying of the tube as much as possible not to affect To the interior decoration or take up too much space. 2. Install the radiator in the process of installing the radiator to the radiator to be stable, and to use the level of measurement to see if the installation is smooth, and then the valve connection and inlet and outlet valves connected, after checking the correct The pipe clamp is reinforced. 3. Installation of the wall-mounted boiler The installation of the boiler should be noted that with the open line and electrical equipment separated from the flammable and explosive materials can not be on the hair to promote the safety of the body, Table and gas stove should be more than 300mm distance. 4. Stress test and customer acceptance Construction workers in the pipe stamping test when there is no run, run, drain, drop and other phenomena, confirmed by the customer after the inspection can be accepted.
- Q: Home coal-fired heating stove and electric heating furnace which is good
- Coal, cheap to save money. Electricity, clean and easy to control, expensive
Send your message to us
1-4 way curved blade air vent linear diffusers air flow vent air conditioning
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 999999 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords