HIGH QUALITY TOWER CRANE TCD5030 WITH MAX LOAD 8T

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8618101089932

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

With level beams, trolley radius changing, swing top and versatile crane including the following characteristics:

1.With domestically advanced technology and capacity indexes matching up with international level, the tower crane’s working radius can reach 43 meters.

2.With an internationally fashionable appearance, the crane enjoys popularity among both domestic and overseas users.

3.The working style of this tower crane can be divided into 2 ways: base fixation and wall-attached fixation with independent erecting height up to 25 meters. On the basis of independent erecting, the attached erection can be achieved by adding standard sections and additional devices and the height can be 100 meters.

4.With high efficiency and excellent timing capacity, the tower crane is liable and safe. The rotating structure is driven by Epicyclic reducer. The elevating system is featuring in tight structure, high efficiency, convenient to use and maintain and safety.

5.Safety devices are integral and belong to mechanic and electric appliances with great reliability and can be used in wild and harsh environment.

6.The tower crane applies hanging jibs with large breadth and bi-tie bars. The jibs is very rigid , light in weight, pleasing to eyes, small in base with great capacity to shoulder pressure and resist wind.

7.The driver’s cabin is independently designed with good sight and spacious interior.

8.Without central electric circuit, the tower crane is free from disorders and accidents when being drenched by rain and violated by short circuit, at the same time is convenient for the driver to pass through.

Because of the above mentioned characteristics, the tower crane is suitable for civic building construction, bridge and irrigation projects, industrial plants and high chimneys constructed in the way of sliding mould and buildings with high walls.

HIGH QUALITY TOWER CRANE TCD5030 WITH MAX LOAD 8T


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Ok so I am now on my laptop in my room, in my bed and I am bursting for the loo, like really bad. I knew before I went to bed there was a crane fly in the hall (outside my room), so I made sure I went to the loo before I went to bed. But me being me I need it again but i have phobia of those dreaded crane flys. I went out and put the light on making sure 2 close the bedroom door, and then it started to fly towards me so I ran back to my room. I need help cause I don't know what to do?I am petrified of them. My fiance would normally move it for me but he is on night shift tonight.The last time this happend I stayed up all night and went to the loo at 7 am when my daughter got up, I don't want to do that again considering it is only 1:44 am over here
No dude, youre confusing two different species. Daddy long legs- or Harvestmen, as they're known in the UK- are the ones with powerful venom, but fangs too short to bite a human being. Crane flies, which look kind of like a flying daddy long legs, are a species that feed one nectar only. They are not carnivorous, and they don't have fangs, or a stinger, or any other means to defend themselves. The females have a tool on their abdomens for depositing eggs. It looks kind of like a stinger, but it is not one, and can do no harm at all.Daddy long legs-spiders can not fly. Crane flies don't even live long enough to eat. Most of the species of crane flies live long enough to mate, and nothing more. Theres is no reason to fear either species. Oh, and they don't eat mosquitos. That's a myth.
Q:and it appears to be looking up at the sky?
It isn't craned back, it is in whatever position it ends up in after the deer is killed by the careless driver.
Q:how does a crane operator's knowledge of where the centroid is generally located for most uniform objects help them perform their job more safely?
If an object is uniform, it's a fair bet the centre of mass will be at the centre of the shape. If lifting with slings, he will have them placed equidistant from centre, at an angle to each other not exceeding 60 degrees. He will then lift a little, and can tell by the angles from vertical of each sling whether or not the CM is under the centre of the crane cable. If not, he will lower the load, and have someone adjust the sling positions. Having slings equally loaded ensures a level load when lifting, and when a load is level it is a much safer lift than when it tilts one way or the other. A tilt would mean greater force in the sling on the low end. The load could slip out, or the excess force could break the sling.
Q:I have an odd fear of construction cranes. I literally get chills and almost dizzy anytime I see cranes. I get very nervous and almost want to cry. I know this is so odd but, I've seen phobias of things that are even more odd so I wonder...is there a phobia for my fear? Does anyone else share my fear?
Devastator-aphobia. Sorry. It's a bad reference to the Transformers cartoons in the 1980s. The constructicons were robots who linked together to form Devastator. It was kind of a Voltron rip-off, except with backhoes and forklifts instead of robot lions.
Q:What is the safe distance of a tower crane to the surrounding buildings?
The latest specification is that the tower crane is 4M from the proposed building.According to the safety regulations of tower craneRegulation 10.3: the tower crane tail and the surrounding building and its surrounding construction facilities between not less than 0.6m.Article 10.5 stipulates: between the two tower cranes of minimum distance should be erected to ensure that at least 2m in the distance between the tower crane boom end and another tower crane tower; the most part of the high tower crane (hook up to the highest or lowest part of the balance weight) should not be confused with the vertical distance of tower crane at in between the highest position of the components is less than 2m.The latest specification is that the tower crane is 4M from the proposed building.The distance from the tower to the building shall be considered:1, the slewing radius of the tower itself.2. The distance between the double shelf of building and tower crane.3, double shelf and tower crane safe distance.4, according to the specific type of tower crane to determine the specific.
Q:What should i do to solve tower crane collapse?
i couldn't figure it out either. try the castle catapult instead.
Q:would 2 500 ton crawler cranes be able to lift a 854 ton bridge section 80 feet in the air?
wow. im helpful anybody tried it!! why : the recommendations co-ordinates the strikes of the finished physique. fairly the arms and the ft, so once you're turning your appropriate foot in clockwise path, with the help of drawing 6 jointly with your hand, that's an ANTI-CLOCKWISE circulate, the recommendations then makes the foot circulate anti-clockwise. Thats how suitable GOD made us!!
Q:A crane lifts a 1265 kg steel beam vertically 26 m, it then stops and swings the beam 3 m horizontally into a position where the welders can secure it into its proper position. What is the work done on the beam by the crane? What is the work done by the force of gravity on the beam?
the work done on the beam by the crane = 1265 * 9.81 * 26 + 1265 * 9.81 * 0 = 322651 J answer work done by the force of gravity on the beam = 1265 * 9.81 * 26 + 1265 * 9.81 * 0 = 322651 J answer
Q:my yard is infested with crane flies. Help please.
It's impossible to think of an insect more harmless than a crane fly. Enjoy them.
Q:How many meters of cranes should be in accordance with the anemometer?
In accordance with national regulations, outdoor cranes need to install anemometer.Specific provisions"GB6067.1-2010 crane safety regulations", 9.6.1 anemometer and wind speed alarm9.6.1.1 high speed cranes for outdoor work shall be equipped with an anemometer. The anemometer shall be located upwind of the upper part of the crane.9.6.1.2 high speed crane for outdoor operation should be equipped with an air speed alarm that displays instantaneous wind speed, and when the wind speed is greater than the working wind speed setting value, the alarm signal should be sent out.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range
Hot Searches
客服
live chat