• Luffing Crane TCD6029 System 1
  • Luffing Crane TCD6029 System 2
  • Luffing Crane TCD6029 System 3
Luffing Crane TCD6029

Luffing Crane TCD6029

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or L/C
Min Order Qty:
1 Unit unit
Supply Capability:
50 Sets Per Month unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description of TCD6029

1) CMAX TCD6029 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator

 

Specifications of TCD6029(TCD260)

Jib length: 60m

Maximum load capacity: 16T

Tip load: 2.9T

Base type: stationary

Mast section: 2.0 x 2.0 x 3.0m

 

 

Packaging & Delivery of TCD6029

40HQ container

40~45days after deposit

TCD6029

TCD6029

TCD6029

 

Q:Who is it? And when in the book do they say who it is?Thank you so much! :D
He okorder /
Q:For starters im nine and i dont know how to win the claw game ive tried like a million times (exagerating) and i never get it! Can someone be kind and tell me plz! I have seen prizes that i really want and most of them are animals! I am an animal lover and ive seen dolphins or puppy stuffed animals and i never can get them! :( plz help any one if u can i would really appreciate it!
Is this a video or online game?
Q:I am making a crane(jib) whatever you call it and I have a concept for the crane itself but not for how I will actually move the camera. I heard wires work but I can not seem to grasp teh concept.* It is a heaver camera by the way*
On a real camera crane you would press the up and down button that moves the wrist part of it. ( I drove a forklift). If you are doing to yourself you'll have to rely on the elbow movements. I might think about renting a Genie lift. And letting someone be your hands in the thing. Unless you know how to build a fully articulating hydraulic ball-joint?
Q:I have a few questions...do they have a shuttle and if so where does it go? What is near the resort? Such as stores etc.
Great propoerty, amazing views, cool breezes, near airport. Fantastic restaurants. I'd recommend hiring a car.
Q:More specifically, do Sandhill Cranes eat squirrels?
No! They eat fish and amphibians. .
Q:i have a 100 ton american crawler crane. how do i calculate the psf, for this equipment.
Not sure what you are asking exactly... Are you saying that you have a crane with a capacity of 100 tons and you want to know the pressure on the soil where the crane is positioned? In this case, you take the capacity (in pounds) plus the weight of the crane (in pounds) then divide their sum by the area of the tracks on the crane (in square feet). This will result in pounds per square foot or psf as you wrote above. These are example estimates, they may not be anywhere near the correct answer, this is simply how to do the calculation. Assumed Capacity 100 ton = 200,000 lbs. Assumed Weight 105 ton = 210,000 lbs. Assumed Area of Track = 200 square feet Note: 1 U.S. ton = 2,000 pounds = 2,000 lbs. 410,000 lbs / 200 square feet = 2,050 psf There's a start, now you just need to find out how much it actually weighs and how long and wide the tracks are to get the area of the track on the ground. I hope that answers the question you were asking.
Q:Could anyone tell me how they erect a construction crane.Some how they just are suddenly THERE, as If by magic.It seems as though the Boom part of the crane must be kind of JACKED up into place.That is the only way I can see them getting those GIANT concrete blocks into the back end of the boom. It doesn't seem possible otherwise. The only other thing I can thing of is the bulk of the pieces are brought in by helicoper and attached.Everything kind of makes sence except the Giant concrete blocks used as a counter weight. ALSO, if the blocks are needed to act as counterweigth to the CRANE itself..why doesn't the Crane fall over when it picks stuff up???
How do they erect the construction cranes? Not very well according to the news of them toppling down of late. Seriously, the cranes are lifted upward one or two floors at a time as the building progresses upward - this is usually accomplished by pulling them up into place with heavy cables and powered winches.
Q:Every day to see the site of the tower crane, and increased with the increase of buildings, but it is very strange. By what means, in the process of how to increase Balance Master, please explain.
With a bar of steel, each layer has about 10 or more bars of steel. When the building rises, add a few more bars to the top floor, plus a few layers. It uses the stability principle of the triangle to keep the tower crane from tilting, and it also needs to pull some cables around to keep it balanced, just like a country pole.
Q:I am doing uni coursework to design an ergonomic layout for an operator cab for a tower crane and so I need to list the required operator controls.Thanks!
There are only two control levers that are on a tower crane.There is one on either side of the seat called joy sticks the right side joy stick controls the hoist cable to go up and down pushed forward to go down and pulled back to hoist up.The left has four functions it controls the swing of the crane and also the boom of the crane to control the swing you push the lever to the left to swing left and push the lever right to swing right.You pull the lever back to boom up and puh it forward to boom down.
Q:How to build a tower crane?
7, the boom of the horizontal installation, setup of counterweight, main hoist installation, installation sequence of these large, there are provisions in the instructions.8 、 install operating room, main cable and control cable. Installation of crane wire rope, hook, lifting the car has been in the assembly of the boom when installed.9, at this time has completed the basic installation, the later self lifting installation, the main work by the tower crane itself equipment and artificial to complete.10 tower crane from basic height to work height.Each type of tower crane has different self lifting mounting methods. In fact, in addition to carrying heavy loads, the installation of a large number of high-strength bolts is a heavy work.11, the above is the general procedure, the actual installation work in strict accordance with the installation instructions. According to historical experience, tower crane installation accidents often occur in some professional installation team.12, the old type of tower crane installation is relatively simple, but also have independent installation, and now the development of automobile crane is not a must, general use of car crane can complete all the installation.
We are a leading manufacturer of a broad range of disposable medical products and durable medical equipments. From 1993, our American Headquarter, Basic Medical Industries Inc. was set up in California USA exploring our initial business of gloves. Over the past 17 years, we has enjoyed unprecedented growth due in large part to the support of our valued customers.

1. Manufacturer Overview

Location SHANGHAI,CHINA
Year Established 2000
Annual Output Value Above US$100 Million
Main Markets

CHINA
Company Certifications ISO 9001:2008;

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Shanghai
Export Percentage 0.8
No.of Employees in Trade Department 600 People
Language Spoken: English;Chinese;
b)Factory Information  
Factory Size: Above138,000square meters
No. of Production Lines Above 2
Contract Manufacturing OEM Service Offered;Design Service Offered
Product Price Range Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords