• Plastic Building Pillars/ Building Design Pillar/Plastic Pillars Columns System 1
  • Plastic Building Pillars/ Building Design Pillar/Plastic Pillars Columns System 2
Plastic Building Pillars/ Building Design Pillar/Plastic Pillars Columns

Plastic Building Pillars/ Building Design Pillar/Plastic Pillars Columns

Ref Price:
get latest price
Loading Port:
Ningbo
Payment Terms:
TT OR LC
Min Order Qty:
100 m²
Supply Capability:
10000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Item specifice

Material:
ABS
oil:
no need
Reusable:
more than 100 times
Weight:
about 15 kgs per square meter

Plastic construction formwork

plastic concrete formwork system

Saving your time, money and energy !!!

 

Plastic Building Pillars/ Building Design Pillar/Plastic Pillars Columns

What is Details of our products plastic concrete formwork ?

Features:

1. Long lifespan& Cost effective -- Plastic formwork can be reused over 100 times,

where  Plywood can only be reused 3 to 5 times. Therefore the Plastic Formwork

is more cost effective.

2. Waterproof --  As the nature of plastic material. It's imputrescible and rustless,

especially suitable for underground and watery circumstance.

3. Interlocking Design -- No release agent needed, good effect of demolding.

4. Easy deassembly -- The template will be separated easily from concrete 

5. Simple Installation -- Light weight and safe to handleeasy cleaning and very robust.

6. High Quality -- Abrasion resistance, excellent mechanical property, best impermeability. 

7. Recycable -- Waste scrap molding board could be recycled.

What is Advantages of our company ?

Our anvantages

 

High quality

Reasonable price

Strict delivery time
Good after-sales service

Profession maker for 21 years

Gold supplier 9th year

Strict quality control

professional injection mould
3D design

Product Photos/ plastic concrete formwork


Plastic Building Pillars/ Building Design Pillar/Plastic Pillars Columns


Plastic Building Pillars/ Building Design Pillar/Plastic Pillars Columns

Plastic Building Pillars/ Building Design Pillar/Plastic Pillars Columns


Plastic Building Pillars/ Building Design Pillar/Plastic Pillars Columns


If you are interested in our plastic formwork , please feel free to contact with us by email. We will quote you the best price, if you have drawings, we can help you caculate the quantity of plastic formwork .

Any building drawings is OK, just send us your drawing, we can make the plastic formwork  quantity for you.

And we warmly welcome friends from all over the world to visit our factories for business.



Q:Shear wall plastic template for the wall height and thick ratio requirements is how much?
Should not be less than 160mm, and should not be less than the floor of the high 1/20; bottom reinforced parts of the wall thickness of not less than 200mm, and should not be less than the floor of the high 16/1. Hope to be helpful to you.
Q:I am a novice, do this product development, and now design a set of products, and now take the product to open the mold, it is not clear what kind of material template selection! Please advise experts who look
You do not explain your product is to open a metal mold or plastic mold, the two mold materials are not the same! I do plastic mold, we mainly use the factory S136 quenching material as a mold material, the slider generally use 718. And you also have the output of the product requirements of the mold, the production will choose a better point of the material.
Q:How does the concrete on the plastic template remove (already glued to the concrete)
Stupid way, with a little hammer little bit of the beat, out a little less a little bit.
Q:I heard that there are building aluminum template and plastic template it? Which is better?
Aluminum alloy template construction is convenient, high efficiency: aluminum alloy building template system assembly is simple, convenient, average weight 30KG / m2, completely assembled by the artificial, do not need any mechanical equipment assistance (workers usually only need a wrench or a small hammer Easy to install), skilled installation workers can install 20-30 square meters per person per day (compared with the wooden mold: aluminum mold workers only need to install wood workers 70-80%, and do not need skilled workers, just install Before the construction of the staff can be a simple training can be).
Q:Plastic deformation of the template how to solve or why the deformation Thank you I want the reason
Pvc plate deformation are: physical deformation and chemical deformation.A physical deformation, the cause:???? High temperature lead to deformation, if it is such a deformation, targeted plastic raw materials for high temperature modification, can effectively improve such problems???? Improper textile lead to deformation, such deformation has two reasons, a plate of raw materials can not meet the actual requirements of the product requirements, re-deployment of raw materials formula to meet the actual requirements of the product can be. Second, the processing and storage methods are not correct, leading to deformation, such problems can solve the problem from the rootTwo chemical deformation: mainly the molecular structure of raw materials change.
Q:Does the building plastic template use it? How's the effect? Can I use 30 to 50 times? Can the fire protection requirements of the steel plate on the cast-in-place plate be achieved?
I used, hand drawing is very convenient, can use hundreds of times, made of plastic
Q:Plastic construction template has no one used? How about the effect of using. How much can the main savings? Can really use 50 times?
It seems to have been the introduction of hollow plastic building template production line (foreign technology), the site last year to see someone used this plastic building template, our site is now using this plastic building template material is polypropylene PP, this template Cheap, suitable for ordinary wall. There is also a material that is made of polycarbonate PC This material is suitable for viaducts, water conservancy works, pouring walls without whitewashing. The wall is very light. It is expensive point.
Q:Types of building templates? What is the water template?
The type of template, according to the material to wood template, steel formwork, bamboo template, Gangmu combination template, etc.
Q:Who used it, how not universal.
4. The product pouring concrete surface smooth, bright as a mirror, to meet the requirements of decorative and decorative water, eliminating the need for secondary plastering process. 5. Turnover times more than 50 times, the template each time the amortization cost is less than 3 yuan, steel frame plastic template turnover times more than 300 6. The material is non-toxic, harmless, pollution-free, 100% recovery, green products The 7. The product acid, alkali, anti-corrosion performance. Product use temperature of -80 ℃ ~ 100 ℃, good weather resistance.
Q:Is there a kitchen toilet to seal the water pipe plastic template? Where to sell?
With PVC board and steel ceiling of the board on it, to the hardware store to buy

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords