XE1250 MIning Excavator hydraulic excavator 567kw/1800rpm 115000kg

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT or LC
Min Order Qty:
1 watt
Supply Capability:
10 watt/month
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8617190086776

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

XE1250 hydraulic excavator is an hydraulic excavator product of the ultra-large tonnage in domestic at present, which is developed by XCMG independently based on its years of R&D experiences with several proprietary intellectual property rights. The excavator is applicable to various mine construction conditions, and the R&D of the ultra-large type hydraulic excavator has technicalization, intelligentization and humanization as a whole.

 

Cproduct design has the following main technical characteristics:

1. Adopt the Cummins QSK50 full electronic-controlled engine and the double turbocharging technology, having full power and high fuel economy;

2. Variou creative   advance hydrauli technologies,   highe work efficiency, and more comfortable operation safety;

3. Unique electric control technology ensuring excellent efficiency, stability and energy conservation;

4. Higher reliability and durability;

5. The capacious and comfortable cab and the convenient maintenance and inspection channel can fully show the concept of humanized design;

6. The convenient maintenance can escort high-efficient operation...

型号 Model

XE1250

重量 Weight

115000kg

接地比压 Ground pressure

143kpa

司机室噪音

Noise in driver's cab

(ISO 6395)

78dB(A)

驾驶室减振Cab damping

4个硅油橡胶减震器

Four silicone rubber shock absorbers

二、发动机系统 Engine system

型号 Model

QSK23-C760

型式 Type

水冷、四冲程、六缸直列、直喷、涡轮增压

Water cooling、Four strokes、Six cylinders、Direct injection、Turbo-charging

额定功率/转速

Rated power/Speed

567kw/1800rpm

最大扭矩/转速

Torque/Speed

3468Nm/1350rpm

排放标准

Emission standard

U.S.EPA Tier 2

排量 Displacement

23.15L

燃油箱容量

Fuel tank capacity

1460L

三、液压系统Hydraulic system

主泵数量No.of main pump

3

主泵额定流量

Rated flow of main pump

3×531L

工作装置压力Working pressure

34.3MPa

回转系统压力

Pressure of swing syetem

28 MPa

行走系统压力

Pressure of travel system

34.3 MPa

先导系统压力

Pressure of pilot system

3.9 MPa

液压油箱容积

Hydraulic tank capacity

640L

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What type of diesel oil is the best for excavator? Can 0# diesel be used? Thank you
Choose the corresponding diesel according to your local temperature condition. For example: higher than 4 degrees with 0# diesel, higher than -5 degrees with -10# diesel, or diesel will freeze.
Q:How Do I find year model for Komatsu Excavator?
take model and serial number to a dealer or aftermarket parts dealer.maybe you could find it on the internet, but its probably easier to just have a human look up a part.
Q:What is the height of the 130 excavator?
Case CX130B detailed parameter configurationSpecificationsOverall work weight (kg):Twelve thousand seven hundred and fiftyBucket capacity (ISO) (M fand):0.34-0.7Boom length (mm):Four thousand six hundred and thirtyLength of bucket (mm):Two thousand and five hundredCountry of origin:performanceEarth specific pressure (Kpa):FortySlew rate (RPM):Fourteen point threeWalking speed (Km/h):3.4/5.6Climbing ability (%):Bucket digging force (ISO standard) (kN):92 (standard mode) /97 (afterburner mode)Bucket digging force (ISO standard) (kN):64 (standard mode) /68 (afterburner mode)
Q:doe's anyone know how much it would cost to pass a 360 excuvater test driving test .?
I'm a excavator operator in Va. Never of a test drive!!!! If you can operate it do it!!!!!
Q:i need help with a physics problem?
F-Weight (load)=mass (load)X0.2 2.25x105-9.8mass (load)=0.2mass (load)=====> mass (load)= 236.25/10=23.625kg, that weighs 231.525newtons.
Q:How about Carter excavator model?
Caterpillar excavator. Caterpillar's hydraulic excavators are named after the 3 prefix, followed by two numbers indicating tonnage levels, such as 320DL, said Caterpillar excavator, 20 ton level, D series, L, said track elongated.
Q:What can you hack on Moon in Call of Duty?
Steve has about answered everything; except you cannot hack Semtax Grenades, Claymores, or Bowie Knife. However you can in fact hack Mystery Boxes when the boxes are not there... What I mean is that you cannot hack the actual mystery box itself but the other three possible locations with a teddy bear can be hacked for 1200. When hacked, they will give you a turn at box and also keep that specific location from being active for a while.... Meaning that the box will not move to that spot for a while nor will you be able to access the box you hacked with either a hacking device or even during a fire sale for quite some time... Could be quite useful to hack the box in receiving area near quick revive and the one near power to keep the box near Mule Kick and the Dome because those are the best areas in the map to run with 2-4 players. Also you can hack perks back for a refund of price... Best strategy for getting the Perks in Space achievement. (Buying all 8 perks in one game) Also it's wise to hack back your perks before you complete the easter egg and get 8 permanent perks so that you get all your money back. (Which can in turn be used for upgrading 3 guns for the Fully Armed and Operational achievement.) Also the One Giant Leap achievement is best to get after you complete the Easter Egg so that you can be revived with 8 perks and just go through teleporter and pack your Mustang and Sally... ;-) ) Just remember to buy all 8 perks before you complete the Easter Egg and get 8 permanent perks because once you do the Egg you cannot buy any more perks to complete the Perks in Space achievement.
Q:when to pay contractors building a house?
I just built a house. I paid the architect after final billing and paid the contractor first a deposit, and from then on had a planned payment schedule of 3 sums with the successful completion of each stage as described in our contract. There was also a final payment for requested extras not included in our quote. Our builder is a very stand up guy.
Q:Dozer\excavator work. How much $$ to dig a hole?
You would need to hire two machines to have4 flat verticle sides. A front end loader and a back hoe. I would take only one day and both usually are hired for $125 per hour with an 8 hour minimum. So your looking at $2,000. If you dont mind one side having a ramp to the front end loader can go in and out. Then you'll only need the one machine. $1,000. This time of year, find a pool builder. He's probably and slow, needs the work, and willing to negotiate.
Q:LDS: Where did the mummies go?
Yes okorder.com/

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range
客服
live chat