• XE3000 MIning Excavator hydraulic excavator power of motor is 1193KW bucket capacity is 14m3 System 1
  • XE3000 MIning Excavator hydraulic excavator power of motor is 1193KW bucket capacity is 14m3 System 2
  • XE3000 MIning Excavator hydraulic excavator power of motor is 1193KW bucket capacity is 14m3 System 3
XE3000 MIning Excavator hydraulic excavator power of motor is 1193KW bucket capacity is 14m3

XE3000 MIning Excavator hydraulic excavator power of motor is 1193KW bucket capacity is 14m3

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT or LC
Min Order Qty:
1 watt
Supply Capability:
10 watt/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

XE3000 hydraulic excavator is an hydraulic excavator product of the ultra-large tonnage in domestic at present, which is developed by XCMG independently based on its years of R&D experiences with several proprietary intellectual property rights. The excavator is applicable to various mine construction conditions, and the R&D of the ultra-large type hydraulic excavator has technicalization, intelligentization and humanization as a whole.

 

XE3000 hydraulic excavator weighs 285t in total, the power of motor is 1193KW. For front shovel excavatorthe bucket capacity is 14m3 . Suitable for material density below 2.5t/m³,  the max. bucket digging force up to 935KN; the max. arm digging force is 1200KN. Under various complex heavy load working conditions, the machine has excellent work capability. The whole machine performance of XE3000C reaches international and domestic advanced level, breaking the complexion that foreign products of super large excavator monopolized the market and improving the status of national brand.

 

XE3000Cproduct design has the following main technical characteristics:

1. Adopt the Cummins QSK50 full electronic-controlled engine and the double turbocharging technology, having full power and high fuel economy;

2. Variou creative   advance hydrauli technologies,   highe work efficiency, and more comfortable operation safety;

3. Unique electric control technology ensuring excellent efficiency, stability and energy conservation;

4. Higher reliability and durability;

5. The capacious and comfortable cab and the convenient maintenance and inspection channel can fully show the concept of humanized design;

6. The convenient maintenance can escort high-efficient operation...

 

 

 

 

 

 

 

 

Q:I am buying a home that has a large shed in the back. The loan is FHA and the appraiser requires it be torn down or repaired. This is an old shed close to 100 years old and was built with all 2x4s with many rotting pieces so fixing it would cost the same as rebuilding a new one. The shed is approx 15x24 in an L shape. I'm working with a contractor for the other repairs and he quoted me at $7,500 for a full demo, I said leave the floors and he brought it down to $5,500. This seems like a rather large amount especially looking around online I was expecting 2-3k at most. Is his quote realistic? Im under a deadline so I had him write it up but I most likely will do it myself or find someone with a excavator to come in and just crush it.
That is a bit high, yes.
Q:I am adding an apartment onto my house and I need to know what is a good fondation to sit it on and how close to the septic tank can I build it. One more question what comes first the foundation or the plumbing?
i prefer block foundations they are warmer , and easy to repair some rough plumbing comes first usually the excavator will have a limited plumbing license for this, with these type of ?'s i would recommend a general contractor the plumbing is a very basic ?, it will get much more complicated as you go, as a carpenter I give priority to my general as he will always have more work for me, as for homeowners they are confused and disorganized and do not know who to call next, if you do it yourself get all your bids then ask a general for a bid, odds are you left something out so pad your bid at least 15%. good lucxk
Q:The excavator won't hit the car
The 1 key to open the instrument is normal, there is no 2 starter reaction speed is enough, before the 3 switch is back to 4 have no reaction force start 5 is repaired 6 other things if you confirm the normal oil, many oil, diesel oil pump and nozzle to normal. New battery. Normal intake. It may be the wrong circuit, check the circuit should be 1 key to open the instrument is normal, there is no 2 starter reaction speed is enough, before the 3 switch is back to 4 have no reaction force start 5 is repaired 6 other things if you confirm the normal oil, many oil, diesel oil pump and nozzle normal. New battery. Normal intake. That could be a faulty circuit,
Q:excavator KOMATSU (DEMAG) H241 is excessive consumption of fuel ,what's the renson ? I just change the bucket lip .
Umm, because it's an excavator.
Q:The streets were wild and the ads said the excavator was carrying an oil hammer. What's the hammer?
A hammer, usually a diesel fuel, that is used to raise the impact mass of a gas that is ignited by a mixture of fuel, but other compression ignition engine fuels can be used. Oil hammer is a kind of construction machinery, and it is a common mechanical equipment in constructionAn oil hammer uses a fuel explosion to push the piston back and forth and hammer the pile.
Q:How interested are you in the following hydraulic excavator improvements? ?Ability to Measure Machine Productivity (Payload, Cycles) ?On Machine Operator Coaching/Assistance ?Machine Protection Improvements ?Machine Security Improvements
Whoever wrote that meant in, not on. So that choice reads: How interested are you in machine operator coaching/assistance. Hope that helps.
Q:is there a graph or chart showing the maximum gradiant a 360 tracked excavator can dig at?
Manufacturers usually have that information. Try their web site,
Q:How much does it cost in gas to run an excavator for 10hrs a day?
depends on the size, eg: 20tonne komatsu at what we call full load conditions, big bucket loading sand non stop will use about 12-15 litres/hr on a hot day with A/C on, oh then operator's wages, payment, tube of grease, blah, blah, blah
Q:Compare the objects and scenes:cameraexcavatorcourt sceneblue boxambulanceBased on the stuff above, explain how all systems are similar...
The only similarity is that all require light to be able to be seen.?
Q:What does an operating engineer do?Would their salary be the same as a regular nuclear engineer?I only wanted to get a bachelors degree and nuclear engineering looked the most interesting to me, but then I found out that with a bachelors in nuclear engineering you can only be an operating engineer..
help run a nuclear power plant basiclly help watch over the control room operations. it starts out at about $80'000 year but be prepared to be bored as hell.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords