XE3000 MIning Excavator hydraulic excavator power of motor is 1193KW bucket capacity is 14m3

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT or LC
Min Order Qty:
1 watt
Supply Capability:
10 watt/month
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8617190086776

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

XE3000 hydraulic excavator is an hydraulic excavator product of the ultra-large tonnage in domestic at present, which is developed by XCMG independently based on its years of R&D experiences with several proprietary intellectual property rights. The excavator is applicable to various mine construction conditions, and the R&D of the ultra-large type hydraulic excavator has technicalization, intelligentization and humanization as a whole.

 

XE3000 hydraulic excavator weighs 285t in total, the power of motor is 1193KW. For front shovel excavatorthe bucket capacity is 14m3 . Suitable for material density below 2.5t/m³,  the max. bucket digging force up to 935KN; the max. arm digging force is 1200KN. Under various complex heavy load working conditions, the machine has excellent work capability. The whole machine performance of XE3000C reaches international and domestic advanced level, breaking the complexion that foreign products of super large excavator monopolized the market and improving the status of national brand.

 

XE3000Cproduct design has the following main technical characteristics:

1. Adopt the Cummins QSK50 full electronic-controlled engine and the double turbocharging technology, having full power and high fuel economy;

2. Variou creative   advance hydrauli technologies,   highe work efficiency, and more comfortable operation safety;

3. Unique electric control technology ensuring excellent efficiency, stability and energy conservation;

4. Higher reliability and durability;

5. The capacious and comfortable cab and the convenient maintenance and inspection channel can fully show the concept of humanized design;

6. The convenient maintenance can escort high-efficient operation...

 

 

 

 

 

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How much does it cost for a decent backhoe? Read On..?
Rent A Backhoe
Q:Can you use excavator soil for a Sandfish?
No, that excavator stuff is great for animals that love to dig burrows, but sandfish are one of the few reptile species that really SHOULD be kept on loose sand (most desert species should not). They've evolved to live in sand dune environments, and swim through the sand (hence their name). So, use clean, dry play sand--you can get it from local hardware stores, it's made for children's sand boxes. The substrate should be 6 inches deep. Use a good UVB basking light, with a 100F basking spot. Cool side should be 80F during the day.
Q:So when is my new dump truck and excavator going to fall out of the sky and into my lap so I can do gov work?
the 1st 1000 government jobs would be as alternative tunnel helps alongside the northeastern turnpikes. as to your new unload truck and excavator, it is going to likely be mailed alongside with something of the bob the builder set, finished with a invoice for one trillion funds.
Q:How much are the first pilot pressure and the two pilot pressure of the excavator?!
The two pilot pressure is usually 10% of the pilot pressure, and the two pilot pressure is controlled by the handle button. A pilot pressure is required with the normal operation of the system is generally about 35kg, two pilot pressure used in special conditions, such as the bucket bucket must use to dig out from the stone soil and the mining stress exceeds the system overflow pressure 345KG system set in a mining buried in the earth stone, then open the two pilot system, the sum of the overflow pressure at that time as one and two times the pilot pressure is 380kg, the working pressure increased to complete this action.
Q:What can I use to build a climbing wall for my crested gecko?
you can purchase a all Natural wooden background for a 10 gallon or buy a bigger one and cut it down i customized my own cage with my females and have the natural wood on all sides, a waterfall and a fog machine with lots of live plants. Its the best thing if ever seen used for climbing, also put plenty of live looking think vines they love them its also great exercise for the jumping experiences
Q:Can anyone explain why any element has the number of protons that it does?
The number of protons must equal the number of electrons outside of the nucleus so that the atom has a neutral charge. The atomic number is used to identify the element and equals the number of protons in the nucleus. The number of neutrons in the nucleus may vary for a specified element. This leads to there being isotopes for a given element.
Q:Are these pictures of trackhoes?
In your picture, the top line of photos, yes. In the Industry, excavators or track-hoes are the same thing. The words are interchangeable. Hope this helps. Wingman
Q:Questions About Iron Ore?
good, you dont want carbon to extract iron from iron ore, you wish to have it to make iron into metal, through reinforcing the molecular chain, to get iron from iron ore, its convenient, you soften it, scoop off the slag that floats to the highest, and bam, iron.
Q:I have a 1995 Kamatsu excavator that wont shut off once its started?
There's a solenoid on the fuel pump that is supposed to shut off the fuel when you turn the key off.It's usually not much. Go to the local dealership with the model and make and they'll be able to tell you for sure.They go out once in a while.It's nothing more than a little electro magnet just like a solenoid on a starter.
Q:Modern 335-7 excavator hydraulic oil temperature at how many degrees normal?
6 、 adjust the system pressure according to the requirements, avoid the pressure is too high, make sure the safety valve, overload valve and so on in normal condition work7, regular maintenance, avoid other parts wear too much to cause leakage. Timely replacement of volumetric efficiency of the hydraulic pump, because of its internal leakage will make the pump shell temperature rise, accelerate the system heating up8, regular inspection of engine speed and fan belt tension degree, so that fans keep enough speed, adequate heat dissipation, so that the equipment in good running condition

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range
客服
live chat