FAML-2 LHD Mining Excavator
- Loading Port:
- Tianjin Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 Units per Month unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Name: FAML-2 LHD Mining Excavator
2. Product feature of SWE08B Excavator
Engine model | Cummins QSM11-C335 |
Type | Water cooling, 4 stroke |
Suction | Turbo charging, air intercooler |
Cylinder amount | 6 |
Cylinder bore | |
Piston displacement | 10.8L |
Speed controller | Electronic, whole process speed control |
Power | 250kW(335HP) |
Rated revs | 2100rpm |
Fuel system | Direct injection |
Max. torque | 1647nm@1400rmp |
Lubrication system | Gear pump forced lubrication |
Filter | Full flow type |
Air filter | (double element, dust discharge and dust indicator) dry type |
Hydraulic torque converter | |
Type | Single stage, 2 phase, 3 elements |
Transmission | |
Type | Planetary gear |
Travel speed km/h | |
Drive system | 4WD |
Front wheel | Fixed, full floating type |
Rear wheel | Central pin bearing, full floating type, 26° swing |
Reduction gear | Spiral bevel gear |
Differential gear | Common gear |
Final drive | Planetary gear, first stage reduction |
Service brake | Full hydraulic wet type disc brake (4 wheels) |
Parking brake | Wet type disc brake |
Emergency brake | Also used as parking brake |
Type | Articulation, full hydraulic power steering |
Steering angle | bidirectional 40° |
Min. turning radius(by outer wheel center) | 6200mm |
Steering system | |
Hydraulic pump | Gear pump |
Max. flow | 168ltr/min |
Pressure of safety valve | 19MPa |
Steering cylinder | |
Type | Double acting piston type |
Cylinder amount | 2 |
Cylinder bore × stroke | 115mm×445mm |
Loading control | |
Hydraulic pump | Gear pump |
Rated flow | 294+168I/min |
Pressure of safety valve | 20MPa |
Operating cylinder | |
Type | Double acting piston |
Cylinder amt. - cylinder bore × stroke: | |
Boom | 2-180mm×880mm |
Bucket | 1-220mm×590mm |
Control valve | Single handle |
Control device | |
Boom | Lifting, retaining, descending, floating |
Bucket | Back inclination, retaining, dumping |
Cylinder operating time | |
Lifting | 7 s |
Dump | 1.2 s |
Descending (empty bucket) | 4.3 s |
Cooling system | 65L |
Fuel tank | 420L |
Engine | 33L |
Hydraulic system | 340L |
Drive axle (each) | 66L |
Transmission | 64L |
FAML-2 LHD is mainly used in underground mine, particularly for transporting excavated rock. It can also be used for the construction of railway, highways, water conservancy and other tunnel projects. It is particularly suitable for poor working conditions, narrow operating site, low and muddy operating surface.
This machine employs DEUTZ air-cooled low-pollution engine which is advanced in today’s world and is deployed with dry-type platinum exhaust cleaner and silencer provided by ECS.
Its transmission system uses hydraulic torque converter and power-shift transmission provided by DANA and thus it boasts light, convenient control, and smooth operation. The vehicle’s hydraulic system mainly adopts the components provided by parker. The well-designed main frame structure ensures ruggedness and high efficiency.
Braking system uses full-hydraulic two-line mechanism, and comes equipped with fully enclosed multiple wet discs brake and ON-SPIN limited-slip differential for safe and reliable operation in poor environments with high moisture content or on muddy roadways. It is designed with full hydraulic steering and manual control.
3. Delivery of SWE08B Excavator
This model could be shipped by Bulk Vessel or Roll-on roll-off vessel.
4. Primary Competitive Advantages
1) Brand-name Parts
2) Country of Origin
3) Competitive Price
4) Good Product Performance
5) Prompt Delivery
6) Quality Approvals
7) Good Reputation
8) Expedite Communication
9) Good Packaging
10) Distributorships Offered
11) One Step Service
12) Good Quality Service
13) Small Orders Accepted
14) Overseas Service Branches
- Q:I also need a couple of different ways they found and mined the gold.
- In the early days of any gold rush, miners go to the creeks and pan for gold. They get a shovelful of gravel/sand and throw it in their mining pan and swish it with water. The heavy gold falls to the bottom as the gravel is washed away. Then within a short time two or three miners would get together and build a sluice box or rocker - this is just like panning except it's a long shoot with little boards nailed to the bottom - looks like a chicken ladder. As the gravel and sand is washed down the sluice, the miner rocks the sluice box and the gold settles out behind the little boards in the chicken ladder. These low-tech ways of getting gold out of the creek are always the first techniques to be used. But all the time time the miners are looking around for the source of the gold which is in the creek - when they find that, then they begin mining through hard rock following the color in the rock.
- Q:Does any one know what type of gearboxes fit with the toyota 1.5L vvt-i 1nz-fe?
- We deal in parts for excavator,usually all the parts have the part number.Maybe your gear box also has its part number,you can check it,and enquire the parts agent.
- Q:What does LC mean after the Komatsu excavator model?
- PC200-8 -8 is the eighth generation of products, but some domestic manufacturers because it is not a long time, may directly from -7, -8 started, so this number may not express the meaning of a lot of sense for many domestic manufacturers. These are basically the basic components of an excavator model, representing the number or letters of excavators + excavators, tonnage + excavators, series / excavators, and generations. Some foreign manufacturers in order to meet the China specific conditions, or some manufacturers specializing in the production of specific conditions of the products in the model have said, such as DH215LC-7, where LC is the meaning of long track, generally used for the construction of soft ground conditions. 320DGC "GC" means "ordinary construction", including earthworks, mining of sand and gravel dam (the density ratio is not too high), highway construction, railway construction. And like tough quarries, it's not appropriate. Carter 324ME "ME" is a large capacity configuration, including short arms and enlarged. Add digital symbols (such as -7, -9 etc.) and Japanese and Korean brands of domestic excavator models can often see - plus digital identification, this article said several generations of models of this product, such as Komatsu PC200-8 -8 said it is the eighth generation models Komatsu, -7 said Doosan DH300LC-7 in it is the seventh generation Doosan models. Of course, many domestic manufacturers of excavator production history is only 10 years, will own excavator named "-7" or "-8" is pure "follow the trend"".
- Q:i cant find it and i was wonderin where it may b thanks
- You gotta feel around
- Q:i'm not dealing with engineering line. This might soubds like a stupid question to ask. But i just need to know. Hope you can help me to sort it out. Thanks alot.
- Civil engineering is about infrastructure design such as water systems, bridges, traffic flow, etc. Mechanical engineering is about equipment design like your excavator buckets.
- Q:I scrapped the goodies out of a house while an excavator was demolishing it. Dusty work.
- Bir ekskavat?r evi y?karken ben de evin d???nda mallar? imha ettim. Tozlu bir i?. (You can also use ''kazma makinesi'' instead of ''ekskavat?r'' both means excavator.)
- Q:Mainly the wheel ones just wondering how fast can they go
- UK mostly limited to 18MPH as are tractors. No suspension you see.
- Q:I can nnot find the peices anywhere! Can you help me?
- Excavator parts can be found in , Wildwood Glen and Jaguar Temple. The mixer parts are in skytown skatepark and the crystal catacombs.(on the 3rd plateau 350 coins!
- Q:I have an old lego suit case full of random pieces and i want to play with my nephew but i dont want to buy sets because most i have no interest in and they can be quite expensive as i was looking at them in the lego store. I have no problem buying a few loose random pieces as they have a wall of all random pieces in any color you can think of. Personally id like to see if i can build him barney the big purple dinosaur, hes two and loves him. Or a construction viehicle like a cement truck steam roller or excavator. I saw in the store on display but no set for a golfer made of legos id love to build that since his dad is a golfer and google is failing me.
- Try first site listed below. Its got an inventory list of parts and you have sign up but it appears free. The second and third site you buy instructions but might be worth it.
- Q:What does an operating engineer do?Would their salary be the same as a regular nuclear engineer?I only wanted to get a bachelors degree and nuclear engineering looked the most interesting to me, but then I found out that with a bachelors in nuclear engineering you can only be an operating engineer..
- help run a nuclear power plant basiclly help watch over the control room operations. it starts out at about $80'000 year but be prepared to be bored as hell.
1. Manufacturer Overview |
|
---|---|
Location | Luoyang,henan |
Year Established | |
Annual Output Value | ¥25 billion |
Main Markets | China;Southeast Asia;Middle East;Russia;Africa;South America |
Company Certifications | ISO9001;GOST;CCC |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Tianjin |
Export Percentage | 0.35 |
No.of Employees in Trade Department | 5 |
Language Spoken: | English |
b)Factory Information | |
Factory Size: | 500acres |
No. of Production Lines | 10 |
Contract Manufacturing | OEM Service Offered |
Product Price Range | ¥350000-450000 |
Send your message to us
FAML-2 LHD Mining Excavator
- Loading Port:
- Tianjin Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 Units per Month unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords