JCM913D Hydraulic Crawler Excavator,strong machinery,13 tons excavator
- Ref Price:
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 100 unit/month
- OKorder Service Pledge
- Quality Product
- Order Online Tracking
- Timely Delivery
- OKorder Financial Service
- Credit Rating
- Credit Services
- Credit Purchasing
•It adopts originally imported Cummins B3.9 engine which features Tier 2 standards, energy saving, environmental care, and convenient service and maintenance;
•It adopts radial seal air filter with pre-filter which effectively prolongs engine life, with fuel filling pump and pressure transmitter as standard device for higher fuel economy.
•It adopts originally imported hydraulic parts, which features stable and reliable quality, high efficiency, and big digging force;
•It adopts new type cab and seats, brand-new interior, and new air conditioning system with automatic adjustment function for comfortable operation;
•New generation electric control system: large color display capable of real time monitoring of machine operation condition, self-diagnosis and recording, electric throttle, and multiple work modes.
•Multiple kinds of buckets and optional parts like dozer blades, breakers, scarifiers, electromagnetic suction cups, quick couplers, etc. are available for digging, landfill, breaking, and grading operations.
•The multifunctional GPS can achieve remote control and data transfer so that the real time machine conditions can be known.
JCM913D HydraulicCrawler Excavator
TechnicalSpecifications
Engine | Travel System | |||||||||||||
Model | CUMMINS B3.9-C | Travel motors | DOOSAN/NABTESCO; Variable axial piston motor | |||||||||||
Type | Water cooling, turbocharged, empty enter-cooling | Support roller quantities | 2×7 | |||||||||||
Carrier roller quantities | 2×1 | |||||||||||||
No. of cylinder | 4 | Travel shoes | 2×44 | |||||||||||
Bore and stroke | 102mm×120mm | Travel speed | 3.59/5.57km/h | |||||||||||
Displacement | 3.9L | Drawbar pulling force | 98kN | |||||||||||
Power output | 86kW/2200rpm | Grade ability | 70% (35°) | |||||||||||
Ground clearance | 425mm | |||||||||||||
Hydraulic System | Cab & Control | |||||||||||||
Pump | KAWASAKI, | Cab | All-weather, sound-suppressed Cab and equipped with a heavy, insulated Floor Mat; Front Window can be opened and slid; 6-direction adjustable Seat; LED display, Automatic monitoring, display and warning; cool & hot Air Conditioner | |||||||||||
Type | variable double–piston pump | |||||||||||||
Max. discharge flow | 2×108L/min | |||||||||||||
Max. discharge pressure | ||||||||||||||
Boom, arm and bucket | 31.9MPa | Control | Two hand levers and two foot pedals for travel Two hand levers for excavating and swing; Electric rotary-type engine throttle | |||||||||||
Travel circuit | 31.9MPa | |||||||||||||
Swing circuit | 25.5MPa | |||||||||||||
Control circuit | 3.9MPa | Boom, Arm & Bucket | ||||||||||||
Pilot control pump | Gear type | Boom cylinder | 105mm×70mm×980mm | |||||||||||
Main control valve | Negative flow control | Arm cylinder | 115mm×80mm×1175mm | |||||||||||
Oil cooler | Air cooled type | Bucket cylinder | 95mm×65mm×885mm | |||||||||||
Swing System | Refilling Capacities&lubrications | |||||||||||||
Swing motor | KAWASAKI, | Fuel tank | 238L | |||||||||||
Swing motor type | Axial-piston motor | Cooling system | 20L | |||||||||||
Brake | Hydraulic oil released | Engine oil | 15L | |||||||||||
Parking brake | Hydraulic disc brake | Hydraulic oil tank | 120L Tank oil level | |||||||||||
Swing speed | 12.6r/min | 208L Hydraulic system | ||||||||||||
Bucket | ||||||||||||||
Type | Backhoe bucket | |||||||||||||
Bucket capacity | 0.55m3 (SAE) | |||||||||||||
Bucket width | 980mm | |||||||||||||
Arm Type | ||||||||||||||
A | Max. digging depth | 8495mm | ||||||||||||
B | Max. dumping height | 6065mm | ||||||||||||
C | Max. digging height | 5537mm | ||||||||||||
D | Max. vertical digging depth | 4907mm | ||||||||||||
E | Max. Depth cut for 2440m(8')Level Bottom | 5275mm | ||||||||||||
F | Max. digging distance | 8297mm | ||||||||||||
G | Max. digging radius at ground level | 8168mm | ||||||||||||
H | Min. swing radius of work equipment | 2426mm | ||||||||||||
Digging Force (ISO6015) Unit: kN | ||||||||||||||
Arm length | 2500mm | |||||||||||||
Bucket digging force | 73.5kN | |||||||||||||
Arm digging force | 60.8kN | |||||||||||||
Arm Type 2500mm | ||||||||||||||
A | Overall length | 7718mm | I | Tread | 2925mm | |||||||||
B | Ground contact length (Transportation) | 4209mm | J | Track length | 3659mm | |||||||||
C | Overall height(to top of boom) | 2674mm | K | Track gauge | 2000mm | |||||||||
D | Overall width | 2500mm | L | Track width | 2500mm | |||||||||
E | Overall height(to top of cab) | 2752mm | M | Shoe width | 500mm | |||||||||
F | Counter weight ground clearance | 912mm | O | Bonnet height | 2145mm | |||||||||
G | Ground clearance | 425mm | P | Revolving frame width | 2490mm | |||||||||
H | Tail swing radius | 2318mm | Q | Distance from swivel center to tail | 2318mm | |||||||||
Operating Weight and Ground Pressure | ||||||||||||||
Operating weight includes basic machine (with boom 4.6m, arm 2.5m, and bucket 0.55m3) | ||||||||||||||
Shoe width | 500mm | |||||||||||||
Overall width | 2500mm | |||||||||||||
Ground pressure | 39KPa | |||||||||||||
Operating weight | 12800kg | |||||||||||||
- Q:In Transformers revenge of the fallen. Does any 1 know what the vehicle the giant robot in the beginning is? The one that says the fallen will rise again.
- That one you described he is called Demolishor and his vehicle mode are excavator and one big unicycle.
- Q:LOL excavator how to play ah, great God taught some skills
- Say first, S6, playing wild knife weaken, many dozen wild to GANK before, or go home first, or not brush wild, directly to squat, playing wild days very sad. But the excavator is very abnormal, reasonable runes and open strange order can make fast and strong brush excavator grab.Rune:The essence of attack speed, red AD, yellow armor, Ramos anti +CD mashup (now AD rampage, magic may not be used, so X cooling).Talent:As a GANK type wild, pre injury is necessary, and deep defense is not recommended, as recommended by 6/18/6.Agility is the Lord of the thunder, blood damage from the defense, and attack with a double-edged sword. The playing field in this position, as long as the opposite let down can win general turmoil, late, so focus on talent output and life.Daguai order, in fact, did not sprinkle, the main disciplinary must be reasonable. The order is > > red stone frog, others do not pay CJ, ready to catch the wolf and another F4. Or QWAQQQE (over second sets of Q Q+ can know the underground hit it), playing skills on the fancy retreat to avoid danger, don't and monsters die endlessly. I tried not to take medicine, naked with a vampire knife 350, can smoothly brush the 6 wave of wild home upgrade jungler knife + eyewater. However, this also gave up the first time before going home, GANK and fear of anti wild, the risk is quite large. At this point, end.
- Q:What is the capacity of the 'bucket' or 'backhoe' of a large construction excavator for commercial buildings? What is the capacity of a dump truck that takes the payload from such an excavator? I'm trying to figure out how many dump truck trips and how many scoops of earth it will take to excavate a 40m x 20 m x 4 m hole, for an apartment building construction site.
- well that stuff is pretty impressive, but try cubic yds or meters etc, it might help simplify it.
- Q:I was wondering if there is a huge difference in damage and speed. I need an idea on which direction I want to go. Dual or Rifle.
- No, there is no huge difference. Use Dual. Greetings The Freak
- Q:i need your help on the mana sort i dont have any blue and white lands because theyre really expensive so help me with thisDeck list:Kazandu Blademaster x4kabir Evangel x4umara raptor x4Halimor excavator x4Hada Freeblade x3Talus paladin x2ondu cleric x3sea gate loremaster x4Journey to Nowhere x3cancel x4angels mercy x2solem offering x2Venser, the Sojourner so how much blue and white mana should i put in here and how could i possibly make this deck better thanks for your help (:
- Ditch the Angel's Mercy. Life gain for the sake of life gain is worthless. Personally, I'd ditch the Cancels and Solemn Offerings as well. I find Ally decks work best where pretty much everything is aimed at just playing an Ally every turn. At least Sideboard them. I'd also remove one of the Seagate Loremasters, just because of the mana cost being enoguh that you don't want to start with two of them in your hand. Add in another Hada Freeblade and 4 Jwari Shapshifters. Remove the Ondu Clerics. Then you can have your lands be something like 10 Plains, 10 Islands, and 4 Tectonic Edges.
- Q:Which school has the strongest excavator technique in China?
- The Shandong Lanxiang Vocational School of course!
- Q:Good, bad or other?
- Not the biggest but definitely the most interesting was a check for 25,000 dollars. There was construction going on north of my property by the city. It sounded like they were right in my back yard so I went outside and they were in my yard. I large excavator was on my property tearing trees out of the ground and piling them up. I tried to explain to the Foreman of the crew that they were on my property, but he ignored me. He was extremely rude and condescending. Finally he confronted me and said that If I didn't leave his job site he was going to call the Police and have me removed. I told him that I would do it for him. When the police arrived the mayor was with them and he knew where the city property ended. He told them to get their equipment off of my property. I contacted my lawyer and he told me my rights. I checked with a company that planted trees the size of the ones that were damaged and he told me it might cost over 50,000 dollars to replace the trees. When a company rep from the contractor came to the house he was almost as rude as the Foreman had been. I told him how much the replacement trees would cost and even gave him the number so he could talk to them himself. I offered to settle for 25,000 if he brought the check before 5 that afternoon. Around a quarter till 5 he showed up with the check.
- Q:What card does excavator driver need to mount guard?
- Operation certificate, special operation certificate!Specific to the driving school inquiry, half of the large driving schools have agents, as well as excavators, schools are also agents here documents test!Usually 800 yuan each
- Q:Excavator theory
- The excavator is driven by the engine work in pump operation, the pump is divided into pump and pump, and then by the operation of the hydraulic excavator driver rod of the hydraulic oil distribution to the pilot valve and main control valve, such as the hydraulic oil distribution to the main control valve, hydraulic oil delivered by the main control valve to the arm; small arms; dig bucket cylinder, and then drive the arm; small arms; digging bucket. If the hydraulic oil is allocated to the pilot valve, the hydraulic oil drives the motor through the pilot valve to make the excavator rotate and drive.
- Q:Dave's Nighttime Bonus Code for feb 29 country on 92.5?
- Listen to the station. They should tell you what it is.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Similar products
New products
Hot products
Related keywords
You Might Also Like