Cube Meter Front Bucket Wheel Loader/Wheel Loader - Cl920

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8618101089932

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description Cube Meter Front Bucket Wheel Loader/Wheel Loader

Power-shift, countershaft gear box 
TC is isolated GB, easy maintenance 
Steering system is priority than Hydraulic 
Load sensing full hyraulic steering system 
Simple and reliable Four-drum brake 
Auto drop level mechanism 
Integrated wide-range dashboard


Specification Cube Meter Front Bucket Wheel Loader/Wheel Loader


Model NO.:CL955

Type:Medium-sized Loader

Usage:Universal Type

Certification:ISO9001: 2000, Rops,TUV,Ghost

Engine Power:147~515kw

Transmission:Hydraulic - Mechanical Transmission

Scraper Type:Tractor-Scraper

Walking Mode:Wheeled

Condition:New

Load and Unload Method:Front Discharge

Color:Caterpillar Yellow

Export Markets:Global

Cube Meter Front Bucket Wheel Loader/Wheel Loader - Cl920

Cube Meter Front Bucket Wheel Loader/Wheel Loader - Cl920



Cube Meter Front Bucket Wheel Loader/Wheel Loader - Cl920

Cube Meter Front Bucket Wheel Loader/Wheel Loader - Cl920

FAQ:

1.How about the shipment?

1. The loader machine load one 40HQ container.

2. The loader disassemble into 3 parts, major machine, bucket and cabin.

3. Before shipment, we have done the rust-proof and antiseptic treatment.


2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.


3. What Can we Do For You?                                                                 

1. During the period of 12 months or 2000 working hours warranty, Chaogong factory are responsible for maintenance and replacement of spare parts.

2. We attend the machinery exhibition in your country and please contact us when we are with you at that time and solve the problem you have.

3. For the sole agents, we will go with senior engineer to your country and offer the technical service. 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Excavator Substrate Question?
You'd need to offer several humid hiding spots, but yes, I've actually set up leopard geckos on excavator clay before. Make sure you get it wet, sculpt it, and let it dry completely before putting them on it, but it'd work quite well for leopard geckos. Due to how dry it makes the cage, it's mandatory that you provide at least 2 humid hiding areas, though. -Jen
Q:what is the mob and demob of excavator? exactly?
Google
Q:I want to know the information crawler excavator?
For more information on excavators and more information on other engineering machinery, such as: bulldozers, road rollers, cranes and concrete spraying machine information.
Q:Import Sumitomo A5-210 excavator fault code 0087 what does that mean? Is the engine system abnormal?
Should be the engine fuel pipe is not smooth, is it necessary to change the diesel filter, or diesel pipe is too dirty, the pipe and the diesel filter connector at the end of the pull out, hit with the trachea
Q:Why is important for a large tree to fall in the jungle?
Q:How should I describe my husband's education and experience with large steel erections and hard wood?
the steel erections just throws me off!!!
Q:Looking for FREE (custom,unique) lego tutorials ?
Try first site listed below. Its got an inventory list of parts and you have sign up but it appears free. The second and third site you buy instructions but might be worth it.
Q:NEW ORLEANS - Thieves hauled off $100,000 worth of.......?
What do you expect from Ray School Bus Naigen who blames everyone else for his failures. Yes the system fell apart, but he was supposed to be in charge of his city. New Orleans was on the skids long before the levees broke. It just took this to expose it. All the years of mismanagement and no real fixes to existing problems led up to this event. Finding yourself in the midst of a crisis and then waiting for the Federal Government to bail you out is just bad policy.
Q:Door penetration loads?
I'm thinking a digging bar and a 16lb sledgehammer. Firing rounds at steel can lead to personal injury.
Q:What kind of loan do we need?
a real estate loan can be limited to just doing dirt moving. you must tell the bank........... be careful--most modular homes are disappointing-- too small, light weight, etc. Instead of moving a house to your site, having a house built on the lot will be MUCH better! [i have never ever known anyone seeking to buy a modular home on a lot................never in 35 yrs ]

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range
客服
live chat