• TOWER CRANE QTZ160 new type of large tower crane for construction System 1
  • TOWER CRANE QTZ160 new type of large tower crane for construction System 2
  • TOWER CRANE QTZ160 new type of large tower crane for construction System 3
  • TOWER CRANE QTZ160 new type of large tower crane for construction System 4
  • TOWER CRANE QTZ160 new type of large tower crane for construction System 5
TOWER CRANE QTZ160 new type of large tower crane for construction

TOWER CRANE QTZ160 new type of large tower crane for construction

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

TOWER CRANE QTZ160 new type of large tower crane for construction

 

1. Brief Introduction
QTZ160 Tower Crane is a new type of large tower crane for construction developed through adopting technology by Shandong Huaxia Group in 2000. During designing, general operations like limited meta count of steel structure parts, parameter optimization of entire crane, stability check of entire crane and choice of each mechanism, etc. are completed with computerized tower crane design platform, which has reached international leading level.
Max. hoisting moment of QTZ160 (6516) Tower Crane is 1940kn/m, and each index of performance occupies leading position among domestic products of the same grade. Its advantages are as follows:

 

  1. Hoisting arm can reach 65m, which largely increases covering area, and its working scope can satisfy constructions of more than two buildings simultaneously.

  2. It has many working modes with largest application range.

Groundwork is poured on the ground without under frame, and tower crane is fixed directly on the groundwork. This method makes tower crane spare groundwork section and crossing girder, and separate working height of tower crane is 46.2m under such condition.
If construction object is high, tower crane can adopt attaching mode, and hoisting height can reach 161-200m. If it is required to be higher under special conditions, please contact our company.
No matter which kind of mode is adopted, hoisting arm has lengths of 55m, 60m and 65m, which can be chosen according to different objects.

 

  1. It adopts hydraulic hoisting system to increase or reduce standard sections, which makes height of tower crane rise or fall according to height of construction to adapt construction of different buildings.

  2. Working speed is high, timing performance is good, and working efficiency is high.

Hoisting mechanism adopts double speed double pulley winding motor to realize low speed on heavy load and high speed on light load, and max. speed can reach 100m/minute. Start and brake are steady, impact is small, and operation is convenient. Swing mechanism adopts domestically advanced frequency conversion timing project, which makes start and brake become steady and reliable.

 

  1. Horizontal Arm Frame and Trolley Radius

The tower crane adopts horizontal arm frame, load is hung in hoisting trolley, and radius is realized through horizontal movement of trolley on arm frame. Compared with luffing jib tower crane, working is steady, installation is convenient, and radius application is wide, which can make hoisting performance be fully exerted, enlarge storing range of construction materials, and make disposal of general construction ichnography be convenient.

 

  1. Safety devices are complete, and there are brakes fixed in each mechanism, which can ensure working safety. There are safety protecting devices like hoisting height restrictor, trolley radius restrictor, moment restrictor, hoisting weight restrictor and swing restrictor, etc. fixed in tower crane.

  2. Driving room is set separately on side with good field of vision and large working space, which create better working environment for operator.

  3. Operation is convenient, and maintaining is simple.

Electric control system adopts domestically advanced PLC control with automatic malfunction judgment, overload and over moment safety chain protection, motor overtime protection, program controller of famous Japan Mitsubishi Company, transducer of Japan Yaskawa Company, relay of OMR Company and contactors manufactured through introducing technology of TE Company, which makes its reliability be much higher than general electric control systems. It is safe and reliable with less malfunctions.
There is no central collector to avoid disadvantages of short circuit and creepage because of damp and make entrance and exit of driver be easy.

2.Structure Figure

3.Form of Hoisting Performance of QTZ160 (6516) Tower Crane


Scope R
(m)

Hoisting Weight Q (kg)

Arm Length of 55m

Arm Length of 60m

Arm Length of 65m

A = 2

A = 4

A = 2

A = 4

A = 2

A = 4

5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
4 7 5 5
4 4 6 2
4 3 2 7
4 1 9 8
3 9 6 0
3 7 4 3
3 5 4 5
3 3 6 4
3 2 7 8
3 1 9 7
3 0 4 3
2 9 0 0

5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
4 9 2 4
4 5 8 6
4 2 8 7
4 0 1 8
3 8 9 4
3 7 7 6
3 5 5 8
3 3 6 0
3 1 7 8
3 0 1 2
2 9 3 4
2 8 5 9
2 7 1 8
2 5 8 8
2 4 6 6
2 3 5 4
2 3 0 0

5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
4 6 9 8
4 3 3 0
4 0 0 9
3 7 2 5
3 4 6 6
3 2 4 8
3 1 4 4
3 0 4 5
2 8 6 1
2 6 9 4
2 5 4 2
2 4 0 3
2 3 3 7
2 2 7 4 .
2 1 5 6
2 0 4 6
1 9 4 4
1 8 4 9
1 8 0 4
1 7 6 0
1 6 7 8
1 6 0 0

1 0 0 0 0
8 7 5 3
7 6 7 8
6 8 1 9
6 1 1 9
5 5 3 2
5 0 3 7
4613
4245
3924
3640
3381
3163
3059
2960
2776
2609
2457
2318
2252
2189
2071
1961
1859
1764
1719
1675
1593
1515

 

4. Main Technical Parameter


Working Level

Hoisting Mechanism

M5

Swing Mechanism

M5

Traction Mechanism

M4

Hoisting Height (m)

Ratio

Separate Fixed Type

Attached Type

a=2

46.2

161-200

a=4

46.2

100

Max. Hoisting Weight (t)

10

Scope

Max. Scope

65

Min. Scope

2.4

Hoisting Speed

Speed

Ratio

a=2

a=4

Hoisting Weight (t)

5

2.5

10

5

Speed (m/min)

50

100

25

50

Stable lowering-speed

Speed(m/min)

3

Motor Model

YZRSW280-4/8

Power (KW)

55

Rotate Speed (r/min)

1440/700

Swing Mechanism

Motor Model

YEJ132S-4B

Power (KW)

5.5×2

Swing Speed (r/min)

0-0.61

Rotate Speed (r/min)

1440

Form of Technical Performance

Traction
Mechanism

Motor Model

YZTDE180-4/8/24

Power (KW)

5/3.7/1.1

Speed (m/min)

58/29/9.5

Rotate Speed (r/min)

1440/690/210

Hoisting
Mechanism

Motor Model

Y132M-4

Power (KW)

7.5

Hoisting Speed (m/min)

0.4

Rotate Speed (r/min)

1440

Working Pressure (Mpa)

25

Crane Weight

Arm Length (m)

55

60

65

Balance Weight (t)

14.9

16.15

18.15

Total power (KW)

62

Working Environment Temperature (℃)

-20-40

5. Form of Main Metal Structure Components


Name

Figure

Main Material and Specification

Remark

Reinforced Section

Main Chord: Angle Iron 140×140×40 with seal board

Size: 1850×1850
Total Height: 2800

Standard Section

Main Chord: Angle Iron 140×140×40

Size: 1850×1850
Total Height: 2800

Hoisting Arm

Upper: Angle Iron 2<100×100×8
2<80×80×8

Space joist frame structure welded with V-iron and angle iron = 10 sections

Lower: Angle Iron 2<120×120×10
2<100×100×10
2<80×80×8

Balance Arm

Angle Iron
125×125×12
90×90×10

Space joist frame structure welded with V-iron and angle iron = 2 sections

Upper Rotating Platform

δ24 Steel Plate

Box Structure

Lower Rotating Platform

δ24 Steel Plate

Box Structure

Cover Frame

Angle Iron
125×125×12

Space joist structure for hoisting

 

Q: please tell me thats not what i think it is O_O
there is cow hoof protein in mascara
Q: I need to know how Stephen Crane came up with writing the Red Badge of Courage. I need examples of his life experiences that he had and then he put them in the Red Badge of Courage.
i could continuously advise To Kill a Mockingbird. it quite is a large tale and additionally you're able to relish it. Do you purely might desire to verify a form of? by way of fact the extra you examine, the extra constructive arranged you would be. Does your e book on the topic of wellbeing careers might desire to be non-fiction? an astonishing novel a pair of conventional practitioner is slicing for Stone by utilising Abraham Verghese.
Q: I work a few blocks away and my window faces the building, now shrouded in black netting and scaffolding. I cannot comprehend how that crane got up there!!
First opf all structure engineer design the crane(wind Load+load carrying capacity+self weight+torsion+moment...etc) then designed in parts then fabricated with iron pipe, angles, girdrers. then transported to site on trucks then assembled in small pieces on ground then step by step joined with the help of crane, or even helicpoter(it was even used in CN tower)
Q: I am familiar with them, I have seen them before at my previous houses. But this is the first spring season for me in the house I am living in and they are absolutely everywhere. They stay right out side the house and they are all over the yard. I want to know if anyone knows any possible ways to rid them from the vicinity of our home. Thanks for the answers.
pesticides control department (call them and spend some $$$)
Q: I need the answer badly
The world would be a little less beautiful. The blue crane's role as a predator in its ecosystem would be left empty, allowing its former prey to breed without check until (hopefully) another predator moves in to pick up the slack. Otherwise the ecosystem will be out of balance.
Q: The mobile crane has a weight of 116kip and center of gravity at G1; the boom has a weight of 29kip and center of gravity at G2. Determine the smallest angle of tilt θ of the boom, without causing the crane to overturn if the suspended load is W = 38kip . Neglect the thickness of the tracks at A and B. Determine the smallest angle of tilt θ of the boom, without causing the crane to overturn.
Smallest Crane
Q: in the karate kid 1984 is the crane kick something they just put in the movie and not real ?
The Crane kick is an actual Martial Arts move it is done in some Hung Ga Kung Fu forms but differently than the one in the movie because it is done without jumping and is much faster the crane kick in the Karate Kid is just a figment of the director and screen writers imaginations.
Q: Information of distributor or manufacturer for Crane Lake Cellars will be helpful too.
Funny how they use a Napa address, being that Bronco has been under attack by all of the legitamite Napa wineries that pay the huge prices to grow and produce wines in Napa that resent a bulk wine producer buying cheap bulk juice from all over and labelling it with names containing Napa and Rutherford when the crap inside has nothing to do with the AVA's they hint at. They ruined the industry starting with a surplus year with 2 buck chuck pricing (per alcohol content) below boones, olde english 800 and Colt 45. For shame.
Q: I think I'm going to try white crane kung fu. This is the club I'm going to which does three lessons in kung fu per week and 2 in sparring.The annual cost is ?40. It says it will take a minimum of 10 years to get a black sash.What are your views on this style? Is it effective and worth my time and does this club look good? Thanks
I have watched some white crane kung fu. It seems to be a good style.
Q: please tell an article about electromagnetic crane?
electromagnetic crane has a huge electric magnet instead of a hook. this magnet is operated by an electrical current. when electric is switched on the magnet becomes magnetized,allowing metal objects to be picked up just like an ordinary magnet.when Electric is turned off the metal object will fall away, as it is no longer magnetized.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords