Tower Crane TC5610 Description:
1.CMAX Tower Crane TC5610 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC5610 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC5610 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC5610 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC5610 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC5610 Parameter:
Max. working range 56m, tip lifting weight 1T and Max. lifting weight 6T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 41.5
Max height with attachment (m) 141.5
Working range can be adjusted (m) 44、50、56
Min working range (m) 2.5
Max lifting capacity (t) 6
Tip load @ 50m (t) 1
Tower Crane TC5610 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC5610 Diagram:
Tower Crane TC5610 Technical Sheet:
Tower Crane TC5610 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC5610 for example, the first two letters “TC” means Tower Crane, “56”means jib length is 56 meter, and the last two letter “10” means the tip load is :1 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q: Minimum QTZ63 tower crane special electric box open for many A
- QTZ63 tower crane with air and leakage protection:Minimum three-phase air switch not less than 100A; at the same time leakage protector is not less than 100A three-phase four wire system leakage protection.Maximum three-phase air switch not greater than 150A; at the same time, leakage protector is not more than 150A of three-phase four wire system leakage protection.
- Q: How to choose tower crane in engineering, such as arm length and lifting weight?
- How to choose tower crane in engineering:1, according to the general layout plan on the mechanical layout requirements to determine. The tower crane's arm length should be swept to the required area, otherwise the worker's formwork and materials can not be transported vertically. (tower crane is the main tool to solve vertical transportation, and auxiliary tools are derricks and double cage elevators)2. After a project has been obtained, it is important to design the layout plan of the field machinery at first. It determines the position of the tower crane and uses several tower cranes, etc. it also conforms to the requirements of economic rationality.3, we should take into account the location of the tower crane, but also take into account the length of the tower crane, but also to meet the requirements of the site construction schedule.
- Q: What are the "2 magnification" and "4 magnification" mentioned in the lifting characteristics table of tower cranes?
- Popular saying: "car to hook this section of vertical distance, you see 4 wire rope is 4 magnification, you see 2 wire rope is 2 magnification.".
- Q: IN HEAVY LIFTING WORKS, Which type of crane is better ? Certain area I See Cranes with JIbs are being used and for same type of lifting jobs i See TELESCOPIC CRANES are used. Ofcourse both are Mobile cranes. I see JIB cranes are assembled at site ...
- Try okorder /
- Q: Crane lifts a 600-kg bin with an initial acceleration of 2 m/s^2. Determine the force in each of the supporting cables due to this motion.?
- F = ma Assume the crate is uniformly loaded, both cables will carry the same force F(AB)(4/5) = (600/2)(9.8 + 2) F(AB)(4/5) = 3540 F(AB) = 4425 N F(BC) = 4425 N F(B-Crane) = 600(9.8 + 2) F(B-Crane) = 7080 N As a form of exchange, please remember to vote a Best Answer from among your results. This is not the same as like or thumbs up which are also nice and do boost points, but only after asker awards initial points with their vote.
- Q: My husband and I will be going to the Crane Resort in Barbados for 3 nights in January. Just wondering, will we need to rent a car or is everything we need to see right there on the beach. Past Crane visitors or even Barbados civilians, please respond. Thanks :)
- The okorder / If you only are focusing on relaxing at your resort/beach then renting a vehicle is not necessary.
- Q: Where can I buy Crane Lake wine in Orange County?
- I'm looking for them too
- Q: Basically what it says on top. Also provide maybe a video to prove it.
- ok,im not sure about it but...maybe if you spred the wings far enough wait for good wind and throw it at a correct angle/thrust then it is possible otherwise it will crash
- Q: The earthing resistance of tower crane shall not be greater than that of the tower crane
- The lightning resistance of tower crane (tower crane) on the construction site shall be no more than 4 ohms.I. tower crane GB/T 5031--20085.5.5.9 lightning protectionIn order to avoid lightning stroke, the main structure of the tower crane, the motor frame and all the electrical equipment metal shell, wire metal protection tube should be reliable grounding, and its grounding resistance should be no more than 4 ohms. When multiple repetitive earthing is adopted, the grounding resistance shall be no more than 10 ohms.Two. Safety regulations for tower cranes GB 5144 - 20068.1.3 tower crane metal structure, track, all electrical equipment metal shell, metal line pipe, safety lighting transformer, low voltage side should be reliable grounding, grounding resistance is not more than 4 ohms. Repeated earthing resistance is not greater than l0. The selection and installation of the earthing device shall comply with the relevant requirements of the electrical safety.The insulation resistance of the 8.1.7 main circuit and control circuit shall not be less than 0.5M ohm.
- Q: when a skyscraper is done being built, how does the crane come down?
- Most probably you are referring to the Tower Crane. Interesting questions should have followed, like: How is it constructed while the construction is in progress? How is the placement of the Tower Crane determined? What happens to the space occupied by the Tower Craneafter work completion? How far should the 'boom' (the arm that has a moving pulley) go? Anyway, your question is a good one, because when I had my first construction work, the Tower Crane was already there and I was thinking of how to dismantle it afterwards. The dismantling process, is done part by part, set by set starting from the top going down. Another interesting question is: How would that excavating truck or bulldozer be able to get out of that deep matt excavation after all excavation works have been accomplished? It is interesting to note that an earth ramp is created while excavation progress, until the machine is down deep in the excavation and seems that it is impossible for it to get out after excavation work is done?
Send your message to us
Tower Crane TC5610 Construction Equipment Building Machinery
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords