Tower Crane TC5610 Construction EquipmentMachinery
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC5610 Details:
Minimum Order Quantity: 1unit Unit: unit Loading Port: China main Port
Supply Capability: 5unit/month Payment Terms: T/T or L/C
Tower Crane TC5610 Description:
1.CMAX Tower Crane TC5610 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC5610 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC5610 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC5610 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC5610 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC5610 Parameter:
Max. working range 56m, tip lifting weight 1T and Max. lifting weight 6T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 41.5
Max height with attachment (m) 141.5
Working range can be adjusted (m) 44、50、56
Min working range (m) 2.5
Max lifting capacity (t) 6
Tip load @ 50m (t) 1
Tower Crane TC5610 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC5610 Diagram:
Tower Crane TC5610 Technical Sheet:
Tower Crane TC5610 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC5610 for example, the first two letters “TC” means Tower Crane, “56”means jib length is 56 meter, and the last two letter “10” means the tip load is :1 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q: What are the mixing arms of the concrete mixer?
- Mixing arm concrete mixer is a component of the mixing arm itself and divided into lateral mixing arm (positive and negative points), stirring arm (also have positive and negative points), stirring arm below is the bearing seat connected, connected with 4 sets of high strength bolts with stirring arm. The top is equipped with wear-resistant mixing blades, connecting with mixing blades, high-strength bolts 2 sets. In addition, some manufacturers have designed mixing side bonded shaft swivel, is installed in the interval between the stirring arm fixed and rotated in two ways.
- Q: The building electrical iron pipe and the pipe line fixing member connected to what is called, what is called the iron pipe and the 86 fixed part of tin
- This book is based on the characteristics of construction electrician, in accordance with the scientific, practical and applicable principles. The content is simple, the language is easy to understand, the form is illustrated, and the system, authority, operability is strong.
- Q: Where was the construction machinery conference held in 2015?
- Organizer: China Academy of machinery science and engineering machinery and military modified vehicle testing center, Shandong Bada International Engineering Machinery Company Limited, Shandong Bada Luqiao Construction Co. Ltd. and Shandong northern Luqiao Engineering Company Limited. Organizer: Shandong Bada international engineering machinery City, Lee brothers auction, Beijing Shengda Trade Center, Hing Beijing power machinery and equipment in the international science and Technology Co Ltd
- Q: How are the machine parts stacked?
- Classification ah! Put small pieces of different sizes and functions into boxes and attach labels; larger items can be placed outside in a certain order (for example, function, length, value, etc.)
- Q: Definition of large mechanical equipment?
- The hoisting machinery used in bridge construction can be divided into three categories: light and small lifting equipment, bridge type crane and boom type crane. Light and small lifting equipment, such as jacks, hoists, winches, etc.. Bridge type lifting machinery, such as beam cranes, Longmen cranes and so on. Boom type cranes, such as stationary slewing cranes, tower cranes, truck cranes, tires, crawler cranes, etc..
- Q: What are the safety protection equipment, machinery and equipment, construction machinery and accessories for construction enterprises?
- Different types of work, security appliances are not the same. For buildings, the main safety helmets, safety nets, safety belts (San Bao), etc., for electrical operators, mainly insulated shoes, insulating gloves, insulation rod, insulation table, etc.
- Q: What are the mechanical drawing software?
- The plane is mainly CAD and CAXA, there are some non mainstream mechanical engineer what, mainly engaged in your spare parts of machinery industry, roughness, form and position tolerance requirements, recommendations for CAXA, which symbols are readily available, there are standard parts library, mechanical symbols library etc..
- Q: Construction machinery production need to deal with what documents?
- At all levels of production safety responsibility system, mainly refers to: the legal representative of the safe production responsibility system; the responsible person in charge of safety production safety responsibility system; the technical director (Chief Engineer) production safety responsibility system; the safety department (Department) Changan production responsibility system; responsibility for production safety, the project manager; specifically (and) post safety responsibility system for production safety; construction technician (technician), safety production responsibility system; 8 class (Group) Changan production responsibility system; workers, production safety responsibility system. Departments responsible for production safety system, mainly in accordance with the functions of enterprises set up departments, the corresponding formulation of the responsibility system for safety in production.
- Q: What are the construction materials, components, fittings and equipment in construction?
- Board: cast-in-place slab, prefabricated slab, prefabricated hollow slab, reinforced concrete slab, wood board. The wall, brick wall, concrete wall, roof parapet, wall light. Door: solid wood door, plywood door, steel door. Window: window, wooden window, Aluminum Alloy window, plastic steel window. The building is in addition to other parts of the building and construction of houses built some auxiliary components, such as scaffolding, construction with pipe thread adjuster, building rod, triangle construction support, reinforced joints etc..
- Q: What are the sub projects of a construction project?
- Appendix B Construction Engineering Division (sub branch) engineering, sub project division, B.0.1 Construction Engineering Division (sub branch), engineering, sub projects can be divided into table B.0.1. Table B.0.1 division number of construction works, sub works and sub projects
Send your message to us
Tower Crane TC5610 Construction EquipmentMachinery
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords