QTZ100(TC6016) tower crane
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
QTZ100(6016) tower crane tower crane is novel hoisting and conveying machinery which is designed by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool.
The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the maximum working amplitude of 56m, the independent lifting height of 40m, the adhesion lifting height of 150m, the rated lifting moment of 710kN•m and the maximum lifting moment of 853.2kN•m. All the performance parameters and technical indexes of the crane meet or surpass national standards.
The crane features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many construction enterprises.
The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.
Amplitude(m) | 3-13.6 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 |
Lifting capacity(kg) | 4000 | 3890 | 3618 | 3380 | 3170 | 2860 | 2810 | 2660 | 2530 | 2400 | 2290 |
Amplitude(m) | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 |
Lifting capacity(kg) | 2190 | 2090 | 2000 | 1920 | 1850 | 1770 | 1710 | 1650 | 1590 | 1540 | 1490 |
Amplitude(m) | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 |
Lifting capacity(kg) | 1440 | 1390 | 1350 | 1310 | 1270 | 1230 | 1200 | 1170 | 1130 | 1100 | 1070 |
Amplitude(m) | 46 | 47 | 48 | ||||||||
Lifting capacity(kg) | 1050 | 1020 | 1000 |
(2)2-magnification Lifting Performance Table
Amplitude(m) | 3-26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 |
Lifting capacity(kg) | 2000 | 1920 | 1850 | 1770 | 1710 | 1650 | 1590 | 1540 | 1490 | 1440 |
Amplitude(m) | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 |
Lifting capacity(kg) | 1390 | 1350 | 1310 | 1270 | 1230 | 1200 | 1170 | 1130 | 1100 | 1070 |
Amplitude(m) | 46 | 47 | 48 | |||||||
Lifting capacity(kg) | 1050 | 1020 | 1000 |
Technical Performance Parameter Table
Item | Unit | Magnification | ||
α=2 | α=4 | |||
Rated lifting moment | kN.m | 500 | ||
Maximum lifting capacity | t | 2 | 4 | |
Working amplitude | m | 3 ~48 | ||
Maximum amplitude lifting capacity | t | 1.0 | ||
Lifting height | Independent | m | 30 | |
Attached | m | 120 | ||
Time of moving outrigger end to rotation center | m | 48.74 | ||
Time of moving balance arm tail to rotation center | m | 12.816 | ||
Counter weight | t | 7 | ||
Total motor power | kW | 24.9 | ||
Allowable working temperature | 0C | -20~+40 |
- Q:What is a typical hourly wage, and what kind/how much training is required? Is there a special certificate that you have to get, sort of like a driver's or pilot's license? Does it vary much depending on what type of crane (track crane vs. tower crane)?
- i really don't know
- Q:I want to join
- Madras Institute Of Heavy Machinery in Thirumullaivoyal No 45, Thirumullaivoyal, Mth Road, Thirumullaivoyal, Chennai - 601209 (44)-26384031, 26382363, 26381739
- Q:The machine weight is 17500 KgEach crane capacity is 12500 KgThe lenght of beam is 4.5m and square cross section areaMaterial of beam is ASTM A 615 Gr60Machin connect to beam in 3 pointWhat is the beam cross section area dimension?
- You left out crucial information and working it out with risky assumptions takes too much work. Whatever this was supposed to mean Machin connect to beam in 3 point What is missing is whether the cranes connect to the end and the entire weight of the machine is in the middle - or is the machine attached at 3 distributed points. In addition, there has to be some condition - looking at the ASTM spec will give strength, but you have specified whether the beam is to be just at failure or 50% safety factor, etc.
- Q:I'm thinking of making a senbazuru for by boyfriend as our first anniversary gift but I'm not sure if it's appropriate. I know its usually given to couples as a marriage gift, but yeah...does it seem too much?Btw a senbazuru is 1000 paper Cranes strung together.Thanks for the help!
- It does seem like too much because it's a big time consumer to make it--takes hours upon hours upon hours. An average of 1 crane made every 5 minutes would result in 83.3 hours nonstop of crane making. That's off-putting. Alternatively it would be like him giving you a $600+ ring because he worked 83.3 hours at his $8/hr job. It's just weird to put in that much time for a 1st year anniversary.
- Q:Does a crane have a pulley?AND....Is an axe a wedge?THANX CUZ I DONT KNOW WHAT IM DOING, AND OMG IM SO GOING TO FAIL MY TEST BECAUSE IM SO DUMB.
- Yes, a crane has a pulley in order to reduce the workload. Each time there is a loop of the pulley made the workload is reduced.
- Q:I know, do you know?
- Usually another crane is used to hoist modular sections an erect the crane. Some large construction cranes build themselves using modular tower sections. The boom and crane cab lifts itself on a track, the crane lifts a modular section of tower from the ground, and inserts it under the cab. The top lifts itself up and starts again. Check out the video below. Incidentally, enormous blocks of concrete are poured on the ground to support cranes like this one, and are too massive to remove when construction is complete. So, many tall buildings have huge monolithic hunks of concrete in the ground at their base....
- Q:What are the lifting moment requirements for tower cranes?
- 1. Tower crane consists of three parts: metal structure, working mechanism and electrical system. The three main technical parameters are lifting moment, lifting weight and working speed. Lifting moment refers to the boom as the basic arm length maximum amplitude corresponding to the rated lifting weight of product, product or maximum weight with the corresponding inflection point.
- Q:I was wondering if anyone knows what period this book is set in? I know that it's set in the slums of New York and the story was published in 1893. But what time period does the story actually take place?
- I studied in in university - it's contemporary to when it was written, so it may as well be set in 1893. Crane was in his early 20's when he wrote it. He was addressing a societal issues of the day, particularly living in the slums of New York and the shift in American culture/economy from primarily agricultural to industrial. It addressed poverty, disaease, social ills and the dreariness of poor city life. The book was quite controversial when it first came out.
- Q:I'm folding 1000 origami cranes for my upcoming wedding. It's a tradition. I'm trying to find a website that can show me how to make the cranes into a large picture or an idea for a mobile. I found some sites that show pictures of each, but nothing with a how to on it.
- from most of the pictures i saw, it seems pretty simple to figure out thinking of it logically. Origami cranes, string, wood sticks, Love and care. And with a bit of your own creativity and whatever supplies you can gather I think you will do a great thing. (making a paper crane now :)
- Q:Has anyone actually folded 1000 paper cranes? i want some proof
- no and no proof
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
QTZ100(TC6016) tower crane
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords