Tower Crane New TC7034 12T with Good Quality

Tower Crane New TC7034 12T with Good Quality

Ref Price:
$40,000.00 - 200,000.00 / unit get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Quick Details of TC7034 Tower Crane     


Feature: Tower Crane                          

Condition: New                                           

Max.Lifting Load: 12T

Span: 70m                                             

Place of Origin: China(Mainland)              

Model Number: TC7034         

 

 

Packaging & Delivery of TC7034 Tower Crane     


Packaging Detail: Nude package          

Delivery Detail: 25-30days

 

Specifications of TC7034 Tower Crane     

  

● Max. working range 70m, tip lifting weight 3.4T and Max. lifting weight 12T.

 
● Slewing mechanism and trolleying mechanism all take VFD+PLC technical control.


● Outstanding in working efficiency, operating speed and stability. Reduce future maintenance cost.

Free standing height (m)

50

Max height with attachment (m)

200

Working range can be adjustedm

5055606570

Min working rangem

2.5

Max lifting capacityt

12

Tip load @ 70mt

3.4

Hoist mechanism (VFD+PLC)

Falls

2

4

Lifting capacityt

03

06

06

012

Speedm/min

080

040

040

020

Motor

YZPBF250-4-55KW

Trolleying mechanism (VFD+PLC)

Speedm/min

0-56

Motor

YPBE132M-4-7.5KW

Slewing mechanism (VFD+PLC)

Speedr/min

0-0.6

Motor

YLEW112M-6-120N.M×2

Climbing speedm/min

0.5

Counterweightt

26

Mast section sizeL×W×Hm

2×2×3

Working temperature

-40+60

Total power (KW)

95

Power supply requirement (KVA)

255KVA for generator

Cable type ( within 30 meters from site power source to lower

 electric box of tower crane )

50mm23+2, 5 cores

Startup voltage & current

380V×95%=361V  260A

Rated working voltage & current

380V  146A

 

Images of TC7034 Tower Crane

 

 

FAQ of TC7034 Tower Crane     

 

Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.

Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……

Third if there are special needs, we could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.



 

To Lead The Revoluation of International Trade


Q: What material are the Samson & Goliath cranes in Belfast made from?
They are cranes look at the YouTube video and read up on cranes that's what material they are made of.
Q: What is the scope of the installation and disassembly of self lifting tower cranes and the applicable range of the cost and the off-site transportation cost?
The installation and disassembly of the existing self rated tower crane, the first cost and the off-site transportation cost quota are divided by the lifting moment 1000kNm and 2000kNm of the jack up tower crane.
Q: the title. the battery --- 9.6v 2000Mah INT NIMH Crane Stock Battery. will this fit in an echo 1 crane stock? the desc. said its designed for GG and SRC crane stocks, but may fit in other crane stocks.
yeah, all crane stock battery's are pretty much interchangeable.
Q: or is jason mraz just making up things for lyrics?
No. They are lifted into place in sections by one or more other cranes, the telescopic arm kind, which are either in a nearby street or on the building site. I watched several being built and then dismantled over a period of three years at a large development across the street from my house. However, I saw a TV programme about how they built one on top of a mountain, and there they used helicopters to lower the sections into place.
Q: A lot of condos and hotels are being build in hawaii, and each time i drive pass them i wonder how they are assembled.Since each individual piece looks heavy/sturdy and is 45 stories+ high, how do construction workers put them together. Do they assemble it by hand? Or are smaller cranes needed to do the job? Or possibly a different way i didn't mention?
u okorder
Q: I am currently an electrical apprentice but would like to become a crane operator. Something i have always wanted to become. I was wondering what the job market is for a tower crane operator vs a mobile crane operator? Also what is the salary comparison? Also how to get my foot into the door and become one. Thank you!
You have to be able to do simple trig to figure what your crane is capable of. You will have to become a member of the crane workers union. Someone may have to die to make a space for you. You may have to take jobs that are just fork lift qualified, if you are lucky, you might find work at seaports unloading cargo ships.You may have to work your way up through the ranks as a wrecking ball operator. The very lucky will make 50-60K +. The really good ones will make more only after many years.
Q: In the end of chapter 16 of Catching Fire the 2nd book of the Hunger Games it says the name she wrote in the dummy, was Seneca Crane. Who is that?!,
In the first book/movie the head gamemaker, so the guy who chooses what happens every second of the hunger games, was Seneca Crane. He was executed at the end of the first book, by eating nightlock, the berries the star crossed lovers used to kill themselves with (unsuccessfully).
Q: How many meters does the tower crane installation height require expert proof?
The installation, disassembly and jacking of tower cranes must be carried out by experts
Q: Where do Cranes (the bird), typically live in ohio?
yes
Q: Is there a world record for making paper cranes?
It's said that if you fold 1 thousand paper cranes in a year you get a wish. By february I had 245 done....so I quit. lol

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords