Tower Crane 12 Ton QTZ250 TC7021 New for Project
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Detail of Tower Crane
Feature:Tower Crane
Condition:New
Model Number:TC7021(QTZ250)
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of Tower Crane
1) This series of tower cranes, ranging from QTZ40 to QTZ400 has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism. It is original in design, reliable in operation and satisfactory in shape. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency. They can be widely used for the construction of high-rise hotels, residential buildings, high-rise industrial buildings, large-span factory buildings and tower-like buildings like tall chimneys.
2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..
5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.
Specification of Tower Crane
Images of Tower Crane
FAQ about Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: Tower crane railing height is greater than or equal to meters
- The height of the railing is determined by the operation specification at height. The upper rod height is 1.0~1.2m, and the lower rod height is 0.5~0.6m.
- Q: I'm confused about one of the final scenes, where Seneca Crane is locked in the room with the nightlock berries. Does this mean that he is supposed to eat the berries and presumably die? Or is it symbolism of some sort of distaste in the way he ended the Games?
- I think he is supposed to eat and die because Prez Snow got pretty angry at Seneca for having two winners for the Hunger Games
- Q: Is it to do with visibility?What are some other colours of cranes?
- Here is NZ they are normally yellow
- Q: I am doing uni coursework to design an ergonomic layout for an operator cab for a tower crane and so I need to list the required operator controls.Thanks!
- There are only two control levers that are on a tower crane.There is one on either side of the seat called joy sticks the right side joy stick controls the hoist cable to go up and down pushed forward to go down and pulled back to hoist up.The left has four functions it controls the swing of the crane and also the boom of the crane to control the swing you push the lever to the left to swing left and push the lever right to swing right.You pull the lever back to boom up and puh it forward to boom down.
- Q: Our company is responsible for the general contracting construction project foundation pile by Party A but other subcontractor for the construction of pile foundation of a pile foundation the company has quickly completed the construction scheme of the party and the supervision of tower crane foundation now has been reported by the audit Party B must contact us pile pile. We believe that Party A shall bear it at one time. Ask the net friend is this so?
- In fact, in the long run, in a word, what the construction site is finally all party a pay, just clearing the count.
- Q: Hi, I just bought a 12 foot tommy jib crane, for my cannon x1-h1, I also bought a pan and tilt motor that you put on top of the camera mount at the end of the jib and then add your camera on top of your motor mount. This thing is really heavy now, I have to use 40 lbs for a counter weight. On top of that all the weight is making the jib slanted and shooting crooked. So I took off the motor head and just left the camera on there, and it help a bit, but its still crooked. Is there any fix for this other than buying a more expensive stronger jib crane? It shoots great and I know I can fix the video in post, but it just bothers me. Any help?
- When you added the pan/tilt head (and the cable) to the camcorder, you exceeded the supported weight rating of the crane and the crane stage. Then, when you put 40 pounds of counter weights on, you went way over the engineered capacity of the crane arm resulting in the bend.
- Q: i am looking for the schematic wiring diagram for GANTRY CRANE AC GENERATOR. thanks a lot
- it sounds like you want to run a gantry crane with a generator the generator should have a wire diagram in side the cover. the gantry crane should have the power requirements on the electric motor there should be a tag on the motor. If you are not sure then you need to get an electrician out there to look at the two components and should be able to get you straight
- Q: This is for a school project, we need a crane with yydraulics to pick up things for science.. Any ideas ?!
- Get your answer from here
- Q: How to crane fly out of your room?
- The crane fly might look a little scary, but they really are harmless. They do not bite people. But you don' t want one in your bedroom. Just open the window and get a towel and chase him out. You may have to get a ladder because he may want to go to the ceiling.
- Q: Question says it all. On the Yahoo homepage, there is a breaking story that you can not click on, stating the NY fire department are responding to a building collapse, but when you try searching it, only a story about a crane comes up in Yahoo search engine. Anyone know if it's 2 different stories or the same thing?
- there okorder /
Send your message to us
Tower Crane 12 Ton QTZ250 TC7021 New for Project
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords