Tower Crane 12 Ton Mechanism TC7021 Factory
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Detail of Tower Crane
Feature:Tower Crane
Condition:New
Model Number:TC7021(QTZ250)
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of Tower Crane
1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 180m with wall tie ins.
2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..
5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.
Specification of Tower Crane
Technical Sheet for TC7021
Free standing height (m) | 50 | ||||
Max height with attachment (m) | 200 | ||||
Working range can be adjusted(m) | 40、45、50、55、60、65、70 | ||||
Min working range(m) | 2.5 | ||||
Max lifting capacity(t) | 12 | ||||
Tip load @ 70m(t) | 2.1 | ||||
Hoist mechanism (VFD+PLC) | Falls | 2 | 4 | ||
Lifting capacity(t) | 0-3 | 0-6 | 0-6 | 0-12 | |
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | |
Motor | YZPBF250-4-55KW | ||||
Trolleying mechanism (VFD+PLC) | Speed(m/min) | 0-56 | |||
Motor | YPBE132M-4-7.5KW | ||||
Slewing mechanism (VFD+PLC) | Speed(r/min) | 0-0.6 | |||
Motor | YLEW112M-6-120N.M×2 | ||||
Climbing speed(m/min) | 0.5 | ||||
Counterweight(t) | 23.6 | ||||
Mast section size(L×W×H)m | 2×2×3 | ||||
Working temperature | -40-+60℃ | ||||
Total power (KW) | 95 | ||||
Power supply requirement (KVA) | 255KVA for generator | ||||
Cable type ( within 30 meters from site power source to lower electric box of tower crane ) | |||||
Startup voltage & current | 380V×95%=361V 260A | ||||
Rated working voltage & current | 380V 146A |
Loading diagram:
70m jib length:
R | 18 | 22 | 24.5 | 27.7 | 28.3 | 30 | 32 | 35 | 37 | 40 | ||
a=2 (t) | 6t—31.8m | 5.96 | 5.35 | 5.00 | 4.54 | |||||||
a=4 (t) | 12t—17.8m | 11.29 | 8.99 | 7.94 | 6.86 | 6.69 | 6.23 | 5.76 | 5.15 | 4.80 | 4.34 | |
R | 42 | 45 | 47 | 50 | 52 | 55 | 57 | 60 | 62 | 65 | 67 | 70 |
a=2 (t) | 4.27 | 3.91 | 3.69 | 3.40 | 3.23 | 2.99 | 2.84 | 2.64 | 2.52 | 2.35 | 2.25 | 2.10 |
a=4 (t) | 4.07 | 3.71 | 3.49 | 3.20 | 3.03 | 2.79 | 2.64 | 2.44 | 2.32 | 2.15 | 2.05 | 1.90 |
65m jib length:
R | 20 | 22 | 25 | 27.7 | 30 | 31.8 | 32.4 | 35 | 35.9 | 37 | ||
a=2 (t) | 6t—35.9m | 5.79 | ||||||||||
a=4 (t) | 12t—19.23m | 11.49 | 10.32 | 8.92 | 7.92 | 7.21 | 6.72 | 6.57 | 5.99 | 5.80 | 5.59 | |
R | 40 | 42 | 45 | 47 | 50 | 52 | 55 | 57 | 60 | 62 | 65 | |
a=2 (t) | 5.27 | 4.96 | 4.56 | 4.31 | 3.99 | 3.79 | 3.52 | 3.35 | 3.13 | 2.99 | 2.80 | |
a=4 (t) | 5.07 | 4.76 | 4.36 | 4.11 | 3.79 | 3.59 | 3.32 | 3.15 | 2.93 | 2.79 | 2.60 |
60m jib length:
R | 22 | 25 | 27 | 30.6 | 31.8 | 32.4 | 35 | 37 | 40 | |||
a=2 (t) | 6t—39.85m | 5.98 | ||||||||||
a=4 (t) | 12t—21.35m | 11.60 | 10.05 | 9.21 | 7.96 | 7.61 | 7.45 | 6.79 | 6.35 | 5.78 | ||
R | 42 | 45 | 47 | 50 | 52 | 55 | 57 | 60 | ||||
a=2 (t) | 5.64 | 5.18 | 4.91 | 4.55 | 4.33 | 4.03 | 3.85 | 3.60 | ||||
a=4 (t) | 5.44 | 4.98 | 4.71 | 4.35 | 4.13 | 3.83 | 3.65 | 3.40 | ||||
55m jib length:
R | 23 | 25 | 27 | 29 | 32.8 | 33.7 | 34.3 | 35 | 37 | 39 | |
a=2 (t) | 6t—42.70m | ||||||||||
a=4 (t) | 12t—22.87m | 11.92 | 10.86 | 9.96 | 9.18 | 7.96 | 7.71 | 7.55 | 7.37 | 6.90 | 6.48 |
R | 41 | 43 | 45 | 47 | 49 | 51 | 53 | 55 | |||
a=2 (t) | 6t—42.70m | 5.95 | 5.63 | 5.34 | 5.08 | 4.84 | 4.61 | 4.40 | |||
a=4 (t) | 6.10 | 5.75 | 5.43 | 5.14 | 4.88 | 4.64 | 4.41 | 4.20 |
50m jib length:
R | 24 | 26 | 28 | 30 | 33.1 | 34.7 | 35.4 | 38 | ||||
a=2 (t) | 6t—43m | |||||||||||
a=4 (t) | 12t—23.04m | 11.46 | 10.48 | 9.63 | 8.90 | 7.94 | 7.51 | 7.34 | 6.74 | |||
R | 40 | 42 | 44 | 46 | 48 | 50 | ||||||
a=2 (t) | 6t—43m | 5.84 | 5.53 | 5.26 | 5.00 | |||||||
a=4 (t) | 6.34 | 5.97 | 5.64 | 5.33 | 5.06 | 4.80 | ||||||
45m jib length:
R | 25 | 27 | 29 | 31 | 33.6 | 34.9 | 35.6 | 37 | |||
a=2 (t) | 6t—43.75m | ||||||||||
a=4 (t) | 12t—23.42m | 11.16 | 10.23 | 9.43 | 8.74 | 7.96 | 7.61 | 7.44 | 7.10 | ||
R | 39 | 41 | 43 | 45 | |||||||
a=2 (t) | 6t—43.75m | 5.80 | |||||||||
a=4 (t) | 6.67 | 6.28 | 5.92 | 5.60 |
40m jib length:
R | 24 | 26 | 28 | 30 | 32 | 34.1 | 35.1 | 35.8 | 38 | 40 | |
a=2 (t) | 6t—40m | ||||||||||
a=4 (t) | 12t—23.8m | 11.90 | 10.88 | 10.01 | 9.25 | 8.59 | 7.98 | 7.71 | 7.53 | 7.02 | 6.60 |
Images of Tower Crane
FAQ about Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: i am having trouble finding out 2 points that Stephen Crane makes about courage in this story. can anyone please help me? =(
- The okorder /... Author Stephen Crane describes this loss of individuality as a key part of the war machine. This sense of selflessness can be a good thing – like when feeling part of the human race will make you jump under a subway to save another man, or the way you care more about your team winning the game than you do about scoring that last point yourself. But it can also be dangerous, as The Red Badge of Courage reminds us. Cogs in machines usually don’t think, and no thinking means no judgment or discretion as to whether an act is right or wrong.
- Q: What species of crane/heron is at 3:07 of this video?
- It is a stork, not a crane or heron. The painted stork, Mycteria leucocephala. The first pic in this link does not make the identification clear..
- Q: I recently read that adult crane flies consume nectar or do not eat at all, their only purpose is to mate. After a crane fly mates, is starvation the cause of its death, or is there something else that ends its life such as age?
- Most adult crane flies do not have functioning mouth parts so they are unlikely to feed even on nectar. Once they have mated they quickly become the prey of birds, spiders, etc, and their corpses are also cleared up by ants and so on. Certainly they don't survive for long.
- Q: It is my contention that God could be held accountable, at least as an accessory, for any crime. God had knowledge of these events in advance and did nothing.
- Denny Crane of course, it takes one god to defend another. (blasphemy FTW)
- Q: Yea i need to write up a summary on that short story, but SERIOUSLY dont have time to read it because i have to study ever sentence to understand things lol.
- The Open Boat is a short story by American author Stephen Crane (1871–1900). First published in 1897, it was based on Crane's experience of having survived a shipwreck off the coast of Florida earlier that year while traveling to Cuba to work as a newspaper correspondent.
- Q: I am in dyer need of a camera jib wih very little budget and/or tools to build one. I am wondering if i can use a cymbal stand for a crash cymbal as a camera jib? My idea is to modufy it by attatching a small piece of wood to the top screw where you would put a cymbal the screw in an L piece (metal) to it or attach it ti the arm of the stand and just snigly fit it so as the arm is raised and lowered the L pice compensates and stays strait. i would attach the camcorder to the L piece with a 1/4 inch screw and washers. i also need the arm to move smoothly will this work with a crash stand. all advice i am grateful for thanks
- Try okorder /
- Q: I have this assignment to find out how a climbing crane is able to move up the building as construction continues.
- They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.
- Q: i am looking for the schematic wiring diagram for GANTRY CRANE AC GENERATOR. thanks a lot
- it sounds like you want to run a gantry crane with a generator the generator should have a wire diagram in side the cover. the gantry crane should have the power requirements on the electric motor there should be a tag on the motor. If you are not sure then you need to get an electrician out there to look at the two components and should be able to get you straight
- Q: Is stature of the crane a Japanese, Chinese, or Okinawan form?
- Found in kata from all 3 sources okinawan japanese and chinese .GANAKAKU KATA in shotokan CHINTO in okinawan kata and in FUKIEN CRANE STYLE for chinese. GANAKAKU means crane on a rock.
- Q: Whenever a vista shot of London comes up, there are a ridiculous amount of cranes. What's up? Are they always building something?
- At present a large number of tall buildings are being erected in London which accounts for the cranes. One area in particular is around Vauxhall, where there was an accident recently when a helicopter crashed into a crane being used for such a purpose. Just have a look at this www.guardian .uk/artanddesign/2...
Send your message to us
Tower Crane 12 Ton Mechanism TC7021 Factory
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords