• TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate System 1
  • TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate System 2
  • TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate System 3
  • TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate System 4
  • TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate System 5
  • TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate System 6
TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate

TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Descriptions of our tower crane:

1, TC5013B have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 50m, TC5013B tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products


Advantage of our tower crane:

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Features of our tower crane:

TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate

 

Independent height (m)

40

Max height with attachment (m)

121

Working range can be adjusted(m) 

40/50

Min working range(m) 

2.5

Max lifting capacity(t)

6

Tip load @ 48m(t)

1.3

Hoist mechanism

Falls

2

4

Lifting capacity(t)

1.3

-

3

3

-

6

Speed(m/min)

9

38

80

4.5

19

38

Motor

YZTD225L2-4/8 /32-24/24/5.4KW     

Trolleying mechanism

Speed(m/min)

20/40

Motor

YZTDE132S-4 /8-3.3/2.2KW  

Slewing mechanism

Speed(r/min)

0.6

Motor

YZR132M2-6-3.7KW

Climbing speed(m/min)

0.5

Counterweight(t)

11

Mast section size(L×W×H)m

1.6×1.6×2.5m

Working temperature

-40-+60°C

Total power (KW)

34

Power supply requirement (KVA)

180KVA for generator

Cable type ( within 30 meters from site power source to lower

 electric box of tower crane )

50mm2(3+2, 5 cores)

Startup voltage & current

380V×95%=361V       285A

Rated working voltage & current

380V                   65A

 


TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate

TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate

TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate

TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate

TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate


TC5013B 6T Tower Crane Free Standing Height with CE ISO Certificate

FAQ;

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Q: When the earthquake happened, the children wanted to know what they could do to inform other students and raise awareness for the people in Japan. So, we decided to do a show on the earthquake, and to also making the cranes, the origami cranes.thank you! a foreigner. (detail)
I personally would write it as... So, we decided to do a show on the earthquake and to make origami cranes. However, for proper English grammar, your idea of saying to also make the cranes is correct for an addition with and. The sentence fragment ... and to also making the cranes... would not work because also is a interrupter to show continuation and is not a verb. To make is an infinitive so adding also would not allow the conjugation of the infinitive due to the rule that a verb cannot follow a verb unless if the second verb is in an infinitive form. And is never used with commas unless there are items in series such as ducks, chickens, and hens. And is not correct after a comma unless if there are items in series. In addition, the items in series rule can change slightly if there is a description with the items or a sentence fragment such as with the sentence... There are several large hens with an egg; a few with large wings; and a few with a large pile of food. In this situation a semicolon(;) is used to help people know that it is a series with a group of sentence fragments. If you need help contact me or find help with items in series, types of sentences, sentence fragments, and sentence interrupters. I am learning to speak Spanish so I am willing to help anyone with English because I know how difficult it can be to learn English.
Q: Are there any NECs that let them do so? Maybe Minesweeping Bosn Mate?
In the latest update to the NEOCS Manual Vol II (NECs) I no longer see an NEC for BM for Crane Operator. Volume II Navy Enlisted Classifications (NECs) NAVPERS 18068F April 2011 NEC Chapter 4 RATING SERIES AND SPECIAL SERIES NECS www lic.navy.mil/bupers-npc/re...
Q: My fiance and I would like to make 1,000 paper cranes for our wedding next year in May. We are looking for a good type of paper to use for this. We are not too particular on the color of the cranes, though we like blue or gold. Does anyone have any feedback on the sort of paper I can get for this project? I know there is origami paper I can buy, but I was wondering if that is the only option I have to choose from. Thanks in advance! :)
I okorder Hope this helps!
Q: I saw this documentary on ancient buildings like the pyramids and it said that we don't have a construction crane that can life the stones used to build some of these ancient structures.So I gotta wonder how much the strongest crane CAN lift....or is that just fantastical nonsense about cranes not being able to lift those blocks?
First, okorder /. This means that at 5 m the capacity is 600 tonnes. Double the radius, half the capacity. A crane located at the foot of the pyramid, will be at 115.2 m from the center. At that radius, the crane could only lift 26 tonnes, so this crane could not lift the greatest stones weighing 80 tonnes. Being the boom only 100m it could'nt even reach the center.
Q: do they get the concrete blocks up that hang at the end? Do they use another type of crane to assemble them?
Tower cranes assembly starts with the foundation of the crane with lot concrete blocks for fixing, then they fix the first bottom part of the crane then they fix the boom with the counter weights, when they want to extend the height, they fix a jack up machine which lift up the boom and then insert a vertical piece and so on till they reach the required height. During the first installation they use a small mobile crane and then after the crane it self lift and fix the pieces
Q: Okay Answers community, I need your help. I recently received a thousand paper cranes for my birthday and I want to know, what's the best way to hang them up (like on fishing line etc.)? Also, at the moment I think I'd like to hang them up in my bedroom, in interesting patterns. Any suggestions for how to arrange the cranes, or other ideas for what to do with a thousand paper cranes? Just remember, I'd like to keep the lot!
Thread them with fishing line as you stated in you question. Depending on how big they are, string them 20 to a string and put them on a dowel with 10 strings ,so you will have 200 cranes per dowel times 5 dowels !000 pieces.
Q: stories about paper cranes?
Sadako and the Thousand Paper Cranes by Eleanor Coerr - about a girl who gets luekemia from the Atom bomb dropped on Hiroshima and her making paper cranes to pass the time in the hospital.
Q: I need several quotes from Thousand Cranes by Kawabata (Don't remember first name, it starts with a Y) depicting passion.At least two.Best answer goes to whoever provides the most useful quotes, not a randomly compiled list.
Yasunari. okorder /
Q: I just wonder they use cranes at such heights, how do they carry the cranes at such height? Helicopter or something? This is a picture of what I'm talking
The cranes are jack-up cranes. They have their own self-contained jacks. As one floor is completed, they jack up to the next level. The cranes are on top of the buildings. They are designed by structural and mechanical engineers to loift a given weight.
Q: What are the common problems encountered in hiring cranes for house constructions?
It might not be the right size for the job.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords