TC5013B 6T Mini Tower Crane Price with CE ISO Certificate Mini Crane Tower Crane

Ref Price:
Loading Port:
China main port
Payment Terms:
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Descriptions of our tower crane:

1, TC5013B have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 50m, TC5013B tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products

Advantage of our tower crane:

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Features of our tower crane:

Independent height (m)


Max height with attachment (m)


Working range can be adjusted(m) 


Min working range(m) 


Max lifting capacity(t)


Tip load @ 48m(t)


Hoist mechanism




Lifting capacity(t)
















Trolleying mechanism




YZTDE132L-4 /8/16-3.3/2.2/1.1KW  

Slewing mechanism




YZR132M2-6-3.7KW X2

Climbing speed(m/min)




Mast section size(L×W×H)m


Working temperature


Total power (KW)


Power supply requirement (KVA)

180KVA for generator

Cable type ( within 30 meters from site power source to lower

 electric box of tower crane )

50mm2(3+2, 5 cores)

Startup voltage & current

380V×95%=361V       285A

Rated working voltage & current

380V                   108A


TC5013B 6T Mini Tower Crane Price with CE ISO Certificate Mini Crane Tower Crane

TC5013B 6T Mini Tower Crane Price with CE ISO Certificate Mini Crane Tower Crane

TC5013B 6T Mini Tower Crane Price with CE ISO Certificate Mini Crane Tower Crane

TC5013B 6T Mini Tower Crane Price with CE ISO Certificate Mini Crane Tower Crane

TC5013B 6T Mini Tower Crane Price with CE ISO Certificate Mini Crane Tower Crane

TC5013B 6T Mini Tower Crane Price with CE ISO Certificate Mini Crane Tower Crane


1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.


2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.


3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.


4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:type of dc motors used by electric train/subway,crane & fan.give a brief explanation to your answer?
Types Of Dc Motors
Q:What is the definition of lifting, slewing and luffing of tower cranes?
Rotary is cantilever tower crane tower crane rotary shaft winding;Is the hook shaft distance amplitude change;
Q:Was it Ichabod Crane or Rory Emerald who got the jeepers creepers scared out of them by a headless horseman?
It was Ichabod Crane. This story has been around for many years, since well before the birth of the great Rory Emerald! Excellent Question!!
Q:what was the signifigance of the paper crane during WWII??? This site will give you the story of the Japanese girl during the time of WWII. It is a touching story.
Q:How do they erect those giant cranes used for constructing tall buildings?
They build themselves actually.... well the first part is assembled by a small crane but after that hydraulic lifts lift up the top section of the crane while the crane lifts up another mid section and places it underneath itself. cool huh?
Q:How are those really tall construction cranes assembled ???
its a truss... they take each piece and attach it... its no hard
Q:What are the differences between the tower crane and the lift?
Tower is a construction machinery.In modern building construction projects, It plays a principal role, most flamboyant machinery. As long as there is construction, there will soon be aGiant throngs, holding a flags, such as a great man, calling on the various large and small project officers, and calling on the various project teams. Lifts, in modern constructions, the role of the lift is also very important, it can replacea lot of features of the tower crane.
Q:Do some schools of hung gar only teach (or focus on) the tiger crane form?
No. Hung Ga is a curriculum. There are some minor differences between them and some don't teach certain forms, but they usually have the core system in common.
Q:How do tower cranes rise?
The weight and concrete foundation shall be made in advance and marked, and the ground ground endurance shall be no less than 20T per square meter. The chassis and standard sections are then assembled on this basis. The standard section of tower crane is the main part of the main part of tower crane. It is also the main role of heightening the height of tower crane". In the construction process, tower crane accompanied by the rise of buildings, naturally need to heighten. When the tower is hoisted, the upper frame is raised upwards with the jack up, so that there is a space between the tower body and the frame, and the standard section of the tower body is installed in the space. In this way, the purpose of the tower crane is realized.
Q:Math help, Two cranes can unload a ship?
No. of hours for the slower to unload alone—x: 1/x + 1/(x - 16) = 1/15 (x - 16 + x)/(x² - 16x) = 1/15 15(2x - 16) = x² - 16x 30x - 240 = x² - 16x x² - 46x = - 240 x² - 23x = - 240 + (- 23)² x² - 23x = - 240 + 529 (x - 23)² = 289 x - 23 = 17 x = 40 No. of hours for the faster to unload alone: = 40 - 16 = 24 Answer: slower crane, 40 hrs; faster crane, 24 hrs Check: = 15(1/40 + 1/24) = 15([3 + 5]/120) = 15(8/120) = 15(1/15) = 15/15 or 1

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range