QTZ63(5013) tower crane
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
QTZ63(5010) tower crane is hoisting and conveying machinery which is designed by our company by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool and has excellent performance.
The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the effective amplitude of 50m and the maximum lifting moment of 700kN•m. The tower crane has the lifting height of 30m and the adhesion lifting height of 120m (2 magnification) during independent use.
All the speed indexes of the crane meet or surpass national standards.
The crane has the total installed capacity of 32.2kW, features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many medium-small construction enterprises.
2. Lifting Technical Performance
2.1 Lifting Performance Table and Lifting Performance Curve
(1)4-magnification Lifting Performance Table(48m)
The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.
Technical Performance Parameter Table
Item | Unit | Magnification | ||
α=2 | α=4 | |||
Rated lifting moment | kN.m | 500 | ||
Maximum lifting capacity | t | 2 | 4 | |
Working amplitude | m | 3 ~50 | ||
Maximum amplitude lifting capacity | t | 0.8 | ||
Lifting height | Independent | m | 30 | |
Attached | m | 120 | ||
Time of moving outrigger end to rotation center | m | 50.74 | ||
Time of moving balance arm tail to rotation center | m | 12.816 | ||
Counter weight | t | 8.54 | ||
Total motor power | kW | 25.5 | ||
Allowable working temperature | 0C | -20~+40 |
2.1 Hoisting and Lifting characteristic curve characteristics table
(1)4-magnification Lifting Performance Table
Amplitude(m) | 3-12.5 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 |
Lifting capacity | 4 | 3.832 | 3.534 | 3.276 | 3.050 | 2.850 | 2.673 | 2.514 | 2.371 | 2.242 | 2.124 |
Amplitude(m) | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 |
Lifting capacity | 2.017 | 1.918 | 1.828 | 1.744 | 1.667 | 1.595 | 1.528 | 1.466 | 1.407 | 1.353 | 1.301 |
Amplitude(m) | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 |
Lifting capacity | 1.253 | 1.207 | 1.164 | 1.124 | 1.085 | 1.048 | 1.013 | 0.98 | 0.949 | 0.918 | 0.89 |
Amplitude(m) | 45 | 46 | 47 | 48 | 49 | 50 | |||||
Lifting capacity | 0.862 | 0.836 | 0.811 | 0.787 | 0.764 | 0.742 |
(2)2-magnification Lifting Performance Table
Amplitude(m) | 3-23.9 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | |
Lifting capacity | 2 | 1.99 | 1.90 | 1.81 | 1.74 | 1.66 | 1.60 | 1.53 | 1.47 | 1.42 | |
Amplitude(m) | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | |
Lifting capacity | 1.37 | 1.32 | 1.27 | 1.23 | 1.19 | 1.15 | 1.11 | 1.07 | 1.04 | 1.01 | |
Amplitude(m) | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | |||
Lifting capacity | 0.98 | 0.95 | 0.92 | 0.90 | 0.87 | 0.85 | 0.82 | 0.80 |
- Q: Jin Title required 20 large equipment testing reports. The personnel system is really rubbish, so we don't know what to do professionally.
- Said here [] large equipment is a concept that means assessment of whether you did more complete, more complex, (conceptual) large equipment, imagine that you provide [small] equipment detection report may not require? If you can provide a full set of drawings of a mobile phone, it will be recognized, but the mobile phone is never a large [device], the key point, appraisal is the assessment of your ability, to see if you have experienced, or complete certain system equipment manufacturing processThere should be no concept of magnitude, and it's really not a good division of magnitudeAs many job posting said, that is the requirement of [bachelor], college students will be delayed if from yourself, if you have the strength, should be bold to recommend myself, because any recruitment notice can't say: we only recruit college students......
- Q: I have a vessel 40 feet off the ground in a platform, and the crane can get to within 30 feet of it (from the side). I'm more curious of the process for sizing them though.
- As you won't be building your own crane (that would be stupid since you would be fully liable). Call a crane vending/renting company. They'll be more than eager to provide you with technical council. How you pick a crane? What do you need to do with it - type of crane for instance -Moving stuff around in a warehouse, yard,.. always at the same places = overhead crane -Lifting heavy stuff once (for instance another crane) or for a short period - mobile crane -lifting stuff for a longer period but not permanent (construction) = tower crane How much do you need to lift, what can it cost? ... It's al pretty simple
- Q: What do you do after you made 1000 paper cranes. I know you string them up, but storing them is hard. Do you ceremoniously burn them or what? When can they be gone? This is the missing link in the story I want to know. I have 846 and I want to know what to do after I'm done.
- The okorder /
- Q: Equipment safety of tower crane
- Safe distance tower and transmission line is not up to the requirements of the tower frame door frame to design, erection principle to power erection, do not use metal materials, bamboo and other materials can be used. The distance between a bamboo pole and a power line shall not be less than 1m, and a certain degree of stability shall be taken to prevent the wind from blowing. The tower crane height and bottom bearing size ratio is large, and the center of gravity of the tower body, high torque, braking frequency, impact force, in order to increase its stability, we will analysis the main causes of the tilting of the tower crane has the following:Overloading. Different types of cranes usually adopts the lifting torque based control, when the amplitude exceeds the rated load weight increase or the corresponding weights, the overturning moment more than stable moment of it, it may cause the collapse of the tower crane.Two, inclined hanging. Slant weights will increase its overturning moment, the lifting point will produce horizontal force and vertical force on the crane, bottom supporting point will produce an additional overturning moment, and the stability coefficient is reduced, resulting in tower crane collapse.Three, the tower crane foundation is uneven, the ground endurance is insufficient, the perpendicularity error is too big, also can cause the tower crane to overturn the moment to increase, causes the tower crane stability to reduce. Therefore, we should proceed from these key factors to strictly check, check and check, and prevent major equipment personal safety accidents. State explicitly eliminated the model should resolutely prohibit the use of, in disrepair, tower crane in the identification of the repair, to limit the use of load, tower crane for the use of fixed number of years there is no uniform standards, opinions vary, different places have different provisions.
- Q: Where you stand on one leg with your hands up and out to sides.Isn't standing on one leg in a fight leaving you exposed and vulnerable? What techniques can you actually do from that stance anyway (other than jumping up and kicking with the leg that was on the ground like the karate kid).
- Good question. Apart from the aspect of training, if you use it as a stance like in The Karate Kid in a real street fight or in a pub, it is comically useless. Movies are only movies and the moves are choreographed to captivate the audience's romanticism with Kungfu. But, having said this, the crane stance if used as a transitional move is a practical technique but both outstretched hands are either spear-hands or tiger-claws, not crane-beaks rising from the sides as in The Karate Kid. Or, if targeting only to the frontal opponent, both hands are forward, one fore and the other behind the front hand. The lifted leg is a frontal leg block either with the shin or knee. The knee must reach your solar plexus as a proper position. The whole centre-line is protected for an immediate instance, and is particularly used when there is a sneak attack from the front. But, don't ever use it as a stance waiting for an attack nor with any fanciful stances for that matter in real situations. To be effective with this technique, the person must be able to resist a frontal push while standing on one leg. To achieve this, he has to spend long hours on the 'horse-stance'. The common term for this single-legged stance is Golden Cockerel Standing On One leg, Jin Zi Du Li (my romanisation of Chinese is not to be trusted, but it sounds somewhat like that in Mandarin). As I said earlier, this is a transitional technique and really what follows after is the interesting part.
- Q: What is the present status of large Boom Tower Crane?
- Large boom crane arm depicts one and another new history. New York's World Trade Center towers is the skyscraper that is the highest and has the most floor in New York City .Its main building is steel and concrete composite structures,using steel 78 thousand tons.The Building started in 1966 and lasted seven years, with 110 layers, 411 meter in height as a giant skyscraper it is writed in history. During in Construction
- Q: who has made a origami crane? how hard was it?
- easy as hell. not hard, just remember the step and you can do around 2-3 in a minutes
- Q: I am looking for what the breeding season is for sandhill cranes?
- Mid-April to mid-June is breeding season for Florida Sandhill cranes lasts from December-June. For most other cranes, like those here in the midwestern U.S., the breeding season is March and April. I'm fortunate enough to live not too far from the Jasper Pulaski Fish and Wildlife Area where the Sandhill Cranes migrate every spring and fall. I always go to see this spectacular event.
- Q: Tower crane demolition safety technical disclosure, how to write?
- Baidu search:Tower crane removing and lowering joint safety technical disclosure.
- Q: They;re ENORMOUS!!! Do they take them apart or something?
- Large cranes are dismantled and sections are placed on numerous flatbed semi-trucks and transported to other locations. Typically this is done early morning, or late evening when traffic is at its minimum. Sections are typically no longer that 60' in length.
Send your message to us
QTZ63(5013) tower crane
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords