• QTZ63(5010) tower crane System 1
  • QTZ63(5010) tower crane System 2
  • QTZ63(5010) tower crane System 3
  • QTZ63(5010) tower crane System 4
QTZ63(5010) tower crane

QTZ63(5010) tower crane

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ63(5010) tower crane is hoisting and conveying machinery which is designed by our company by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool and has excellent performance.
The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the effective amplitude of 50m and the maximum lifting moment of 700kN•m. The tower crane has the lifting height of 30m and the adhesion lifting height of 120m (2 magnification) during independent use.
All the speed indexes of the crane meet or surpass national standards.
The crane has the total installed capacity of 32.2kW, features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many medium-small construction enterprises.
2. Lifting Technical Performance

2.1 Lifting Performance Table and Lifting Performance Curve

(1)4-magnification Lifting Performance Table(48m)

 

The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.

Technical Performance Parameter Table


Item

Unit

Magnification

α=2

α=4

Rated lifting moment

kN.m

500

Maximum lifting capacity

t

2

4

Working amplitude

m

3 ~50

Maximum amplitude lifting capacity

t

0.8

Lifting height

Independent

m

30

Attached

m

120

Time of moving outrigger end to rotation center

m

50.74

Time of moving balance arm tail to rotation center

m

12.816

Counter weight

t

8.54

Total motor power

kW

25.5

Allowable working temperature

0C

-20~+40

2.1 Hoisting and Lifting characteristic curve characteristics table

(1)4-magnification Lifting Performance Table


Amplitude(m)

3-12.5

13

14

15

16

17

18

19

20

21

22

Lifting capacity
(t)

4

3.832

3.534

3.276

3.050

2.850

2.673

2.514

2.371

2.242

2.124

Amplitude(m)

23

24

25

26

27

28

29

30

31

32

33

Lifting capacity
(t)

2.017

1.918

1.828

1.744

1.667

1.595

1.528

1.466

1.407

1.353

1.301

Amplitude(m)

34

35

36

37

38

39

40

41

42

43

44

Lifting capacity
(t)

1.253

1.207

1.164

1.124

1.085

1.048

1.013

0.98

0.949

0.918

0.89

Amplitude(m)

45

46

47

48

49

50

Lifting capacity
(t)

0.862

0.836

0.811

0.787

0.764

0.742

(2)2-magnification Lifting Performance Table


Amplitude(m)

3-23.9

24

25

26

27

28

29

30

31

32

Lifting capacity
(t)

2

1.99

1.90

1.81

1.74

1.66

1.60

1.53

1.47

1.42

Amplitude(m)

33

34

35

36

37

38

39

40

41

42

Lifting capacity
(t)

1.37

1.32

1.27

1.23

1.19

1.15

1.11

1.07

1.04

1.01

Amplitude(m)

43

44

45

46

47

48

49

50

Lifting capacity
(t)

0.98

0.95

0.92

0.90

0.87

0.85

0.82

0.80

 

Q:Lifting tower crane tower more than 45 meters, the demolition cost and how to adjust the field Sinotrans transportation fees?
Self lifting tower crane tower 45 meters high to prevail, such as height of over 45 meters, each increased to 10 meters (less than 5 meters, excluding) demolition costs increase 20%, off-site transportation costs increased by 10%.
Q:death... by exile!Also, which Batman movie was your favorite and why?Mine was the first because it was cool to see how Wayne started and got all the Batman stuff and the movie was less confusing, haha. Plus I thought the actor Cillian played Scarecrow really great :)
Yes, that was such a nice surprise. He was a great villain in Batman Begins. For a split second, I was like Wait a minute - the last time I saw Dr. Crane, he was freaking out on that Toxin they released into The Narrows. . ., but then, I remembered - he and everyone else affected by that poison were given the antidote after it was produced by Wayne Enterprises. His role as the judge at the sort of Reign Of Terror style court system is perfect - Crane clearly enjoyed watching people suffer mentally, liked seeing them terrified. Sadistic little twerp. Tough call on favorite.. . while I think the first two thirds of The Dark Knight are probably the very best of the series. . . my personal fave is Batman Begins, too. I can remember the first time I saw it, and as they're showing the establishment shot of those mountains in Asia, Raz Al-Ghul's lair. . . I kept thinking, this is different than any other Batman stuff I've seen - this is cool! Kinda sad it's over! :( Edit - And I just wanted to add - I've used that line Bruce's dad says with my own little son: Why do we fall? :)
Q:I know how to make cranes and I'm pretty fast at doing so but in pictures I see of crane leis the cranes look like they're folded differently so that they can be stacked on top of each other.. Can anyone teach me how to fold like that so that I can make a paper crane lei?
But I do different from step 11 on Step 11: Normally they fold along the red line. I dont. On step 10 you see the cross line in the center +. I then fold the right pointy toward the center. Do the same for all. Step 12: I the filp the right top layer to the left, same with the back side. Step 13: fold the bottom point to the top(one layer only) filp to back side, do the same. Step 14: flip right layer to the left again, same with the back side. Step 15: Pull and done.
Q:where did the story originated from? how and why did it happened?
It's okorder /-- The fable that babies are brought by storks is from Ger. and Du. nursery stories, no doubt from the notion that storks nesting on one's roof meant good luck, often in the form of family happiness. Online Etymology Dictionary, 2001 Douglas Harper
Q:On the show Passions was Fox Crane ever sexually assaulted?
he and several other male characters have been sexually assaulted. Oddly enough, men on the show are equally as likely to be violated as women. Fox Crane, Julian Crane, Luis Lopez-Fitzgerald, Miguel Lopez-Fitzgerald, and Ethan Winthrop have all been victims of sexual assault. His individual character bio doesn't describe about it though.
Q:I'd take Denny Crane he's ruthless
Ha! What a toss-up... I'd pick Denny Crane because even though he jokes around, he has a lot of back-up and help to support the case.
Q:How do you calculate ground bearing pressure for cranes?
You use statics. You get the specs for the crane and what it is lifting and determine from the site the pick angles and where the outriggers are going to be placed. Then you do the 3-D calcs to determine the reactions necessay and determine the soil's allowable bearing pressure, then design temporary footing based on that.
Q:I need a web site for crane documentation. What I need, is a site, where from I can get, when needed, hydraulic and electric schematics for all kind of cranes (crane trucks, bridge cranes, etc)Thank you,
This website may help you
Q:how do they get the construction crane onto the the tall buildings?
If the crane has a mountaineering physique it is going to diminish itself down, removing its very own tower sections till it somewhat is low adequate to be bumped off by potential of a cellular crane. If it doesnt a smaller crane stated as a derreck crane would be set up on the roof of the development, it is going to take the tower crane dowm, as quickly because it somewhat is bumped off the derreck crane is disassembled and taked down by potential of the homes raise
Q:How do you test the tower crane? Myopia can span tower crane? Brother here, please all heroes.
A tower crane installation scheme, 1, compilation basis, project overview, working environment, 2 workers and 3 endurance calculation and installation equipment for 4, installation procedures, methods and requirements for 5, commissioning record 6, two safety technical measures, safety technical disclosure, three installation foundation concrete test report of four, the tower crane installation and acceptance of table five, safety supervision station issued a permit for six, seven, demolition demolition project safety technical clarificaiton tower crane installation scheme project name: preparation: position (title): Approval: job (title): the construction unit: tower crane installation demolition project, the preparatory work before construction: 1. The tower crane installation position, according to the effective range of the construction requirements, site conditions and the role of tower crane, convenient installation and disassembly, the tower crane configuration in 17 axis to 18 Between the axis, away from the outer wall of 5 meters, with 11 standard section. 2, the basis of the principle, the use of concrete foundation, strictly according to random basis drawing. 3, the examination of concrete pressure report, tower foundation has been completed by design and construction, the safety group acceptance, the basic test block delivery, after the test pressure qualified, must be installed. 4. The installation site is level and the channel is repaired. 5, transport parts admission

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords