QTZ63(5010) tower crane

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

QTZ63(5010) tower crane is hoisting and conveying machinery which is designed by our company by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool and has excellent performance.
The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the effective amplitude of 50m and the maximum lifting moment of 700kN•m. The tower crane has the lifting height of 30m and the adhesion lifting height of 120m (2 magnification) during independent use.
All the speed indexes of the crane meet or surpass national standards.
The crane has the total installed capacity of 32.2kW, features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many medium-small construction enterprises.
2. Lifting Technical Performance

2.1 Lifting Performance Table and Lifting Performance Curve

(1)4-magnification Lifting Performance Table(48m)

 

The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.

Technical Performance Parameter Table


Item

Unit

Magnification

α=2

α=4

Rated lifting moment

kN.m

500

Maximum lifting capacity

t

2

4

Working amplitude

m

3 ~50

Maximum amplitude lifting capacity

t

0.8

Lifting height

Independent

m

30

Attached

m

120

Time of moving outrigger end to rotation center

m

50.74

Time of moving balance arm tail to rotation center

m

12.816

Counter weight

t

8.54

Total motor power

kW

25.5

Allowable working temperature

0C

-20~+40

2.1 Hoisting and Lifting characteristic curve characteristics table

(1)4-magnification Lifting Performance Table


Amplitude(m)

3-12.5

13

14

15

16

17

18

19

20

21

22

Lifting capacity
(t)

4

3.832

3.534

3.276

3.050

2.850

2.673

2.514

2.371

2.242

2.124

Amplitude(m)

23

24

25

26

27

28

29

30

31

32

33

Lifting capacity
(t)

2.017

1.918

1.828

1.744

1.667

1.595

1.528

1.466

1.407

1.353

1.301

Amplitude(m)

34

35

36

37

38

39

40

41

42

43

44

Lifting capacity
(t)

1.253

1.207

1.164

1.124

1.085

1.048

1.013

0.98

0.949

0.918

0.89

Amplitude(m)

45

46

47

48

49

50

Lifting capacity
(t)

0.862

0.836

0.811

0.787

0.764

0.742

(2)2-magnification Lifting Performance Table


Amplitude(m)

3-23.9

24

25

26

27

28

29

30

31

32

Lifting capacity
(t)

2

1.99

1.90

1.81

1.74

1.66

1.60

1.53

1.47

1.42

Amplitude(m)

33

34

35

36

37

38

39

40

41

42

Lifting capacity
(t)

1.37

1.32

1.27

1.23

1.19

1.15

1.11

1.07

1.04

1.01

Amplitude(m)

43

44

45

46

47

48

49

50

Lifting capacity
(t)

0.98

0.95

0.92

0.90

0.87

0.85

0.82

0.80

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How are skyscrapers been build ?no cranes can be that high?
That is a good answer. Ordinary cranes build the steel frame to a height of perhaps 60 feet. The frame is designed so a specially designed crane can climb up the side (like climbing a ladder) to about 50 feet where the climbing crane can complete the frame to about 100 feet, then the crane can climb to the 90 foot level and build the frame to about 150 feet etc. Another method is the floor at about the 60 foot level is completed and extra strong. A crane is assembled on that floor and can complete the steel frame to about 100 feet where another extra strong floor is built. The crane at 60 feet is then dismantled and moved to the floor at the 100 foot level, or perhaps this is a second crane. Repeat until the full height of the building is frame work. As cranes are removed at the lower levels, more floors can be installed and some of the finishing work done. Either way, you can see why very tall buildings are very expensive. Likely both methods are used for some very large and very tall buildings. Neil
Q:Does anyone have a picture of Seneca Crane being walked to his death by two peacekeepers in The Hunger Games?
I don't think it would be out there yet, as the movie just came out. I would try searching Seneca Crane and then your dad's name. You also might be able to find it on YouTube. It's really cool that your dad was in the movie!! Good luck finding the picture!
Q:When a skyscraper is being built how does the crane used to lift steel girders move upward with the const.?
it takes two cranes
Q:In the Pacific NW, what will get rid of Crane Flies in my yard?
Crane Flies,aka Mosquito Hawks are beneficial insects and I would not get rid of them.
Q:The special equipment specified by the state is a periodical inspection cycle, wherein the crane is carried out every many years
(two) small light lifting equipment, bridge crane, gantry crane, gantry crane, cable crane, crane mast, railway crane, jib crane, mechanical parking equipment every 2 years 1 times, the crane annual molten metal and hot metal 1.The rated load test, static load test and dynamic load test shall be carried out in the first test and the first periodic inspection, and the rated load test shall be carried out 1 times after each of the 1 inspection periods.The inspection process, the existence of major risks of hoisting machinery (such as special work environment, frequent accidents, etc.), inspection agencies approved by the provincial quality technical supervision department agree, can be appropriate to shorten the regular inspection period, but the short period of not less than 6 months.
Q:Question on cranes?
Do not know where you live but I worked in a Shipyard in South Mississippi That had Cranes which picked up Modules which weighed 100 tons. Most were in the range of 50 to 70 tons the limiting factor was the range of the lift away from the crane. The further away from the Crane the less the load limit but the Cranes were rail mounted so they could traverse and carry the load anywhere. We had one Crane capable of handling 500 tons, a real monster. These are all located at Pascagoula Mississippi. Most were imported from Germany.
Q:i will like to crane operator?
You made a statement, you will like to crane (an) operator. Which operator is it you are going to like to crane? If you mean would you like to operate a crane, that is up to you. If you mean can you be a crane operator, that is up to an employer. You need to be employed as one, and that probably means training and experience before being allowed to operate cranes for him/ her.
Q:How do you win a PS3 at crane?
It's impossible to win them if they are in a crane machine only gullible person will try to win a PS3 from a crane machine as it will not be strong enough to pick it up
Q:Will these crane eggs hatch?
What species of crane? Sandhill cranes have an incubation time of around 30 days, do you know the exact day of egg laying? Are you sure they haven't hatched and they are sitting on chicks? If you are getting close enough to the nest to see eggs or chicks, you might be too close and could be interfering with their natural behavior, unless they are captive or you are using a blind. You mentioned their chick being hit by a car, so if they are nesting that close to people, they may be nervous and are flushed from the nest too often to keep the eggs the right temperature. It's hard to say without more information. Edit: Extra cold weather can damage the eggs. It does seem like they've lost this clutch-50 days is long past when they should have hatched. They may be trying to incubate them anyway, I haven't worked directly with sandhills, but other birds that I've conducted nest monitoring studies on have sometimes sat on nests a while past when the eggs should have hatched. Hopefully this is actually their fourth clutch and you missed the removal of the third clutch. Good luck!
Q:would someone who study both white crane kung-fu & ninjutsu be called a mixed martial artist?
My strictly Kung Fu favorites are Fearless, Ip Man, Ip Man 2. Kung Fu Hustle and Four Dragons come in very, very close behind. Ong Bak 2 showcased some Kung Fu, but wasn't strictly. If it counts, it'd rate with Kung Fu Hustle and Four Dragons, but wouldn't make my top three.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range