• QTZ63(5012) tower crane System 1
  • QTZ63(5012) tower crane System 2
  • QTZ63(5012) tower crane System 3
  • QTZ63(5012) tower crane System 4
QTZ63(5012) tower crane

QTZ63(5012) tower crane

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ63(5012) tower crane tower crane is novel hoisting and conveying machinery which is designed by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool.
The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the maximum working amplitude of 56m, the independent lifting height of 40m, the adhesion lifting height of 150m, the rated lifting moment of 710kN•m and the maximum lifting moment of 853.2kN•m. All the performance parameters and technical indexes of the crane meet or surpass national standards.
The crane features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many construction enterprises.

The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.

 

Amplitude(m)

3-13.6

14

15

16

17

18

19

20

21

22

23

Lifting capacity(kg)

4000

3890

3618

3380

3170

2860

2810

2660

2530

2400

2290

Amplitude(m)

24

25

26

27

28

29

30

31

32

33

34

Lifting capacity(kg)

2190

2090

2000

1920

1850

1770

1710

1650

1590

1540

1490

Amplitude(m)

35

36

37

38

39

40

41

42

43

44

45

Lifting capacity(kg)

1440

1390

1350

1310

1270

1230

1200

1170

1130

1100

1070

Amplitude(m)

46

47

48

Lifting capacity(kg)

1050

1020

1000

 

(2)2-magnification Lifting Performance Table


Amplitude(m)

3-26

27

28

29

30

31

32

33

34

35

Lifting capacity(kg)

2000

1920

1850

1770

1710

1650

1590

1540

1490

1440

Amplitude(m)

36

37

38

39

40

41

42

43

44

45

Lifting capacity(kg)

1390

1350

1310

1270

1230

1200

1170

1130

1100

1070

Amplitude(m)

46

47

48

Lifting capacity(kg)

1050

1020

1000

 

Technical Performance Parameter Table


Item

Unit

Magnification

α=2

α=4

Rated lifting moment

kN.m

500

Maximum lifting capacity

t

2

4

Working amplitude

m

3 ~48

Maximum amplitude lifting capacity

t

1.0

Lifting height

Independent

m

30

Attached

m

120

Time of moving outrigger end to rotation center

m

48.74

Time of moving balance arm tail to rotation center

m

12.816

Counter weight

t

7

Total motor power

kW

24.9

Allowable working temperature

0C

-20~+40

 

Q:I'm confused about one of the final scenes, where Seneca Crane is locked in the room with the nightlock berries. Does this mean that he is supposed to eat the berries and presumably die? Or is it symbolism of some sort of distaste in the way he ended the Games?
Yeah, basically President Snow has him killed. The berries represent this. The whole point is he goes into the room, sees the berries and knows he is being killed for allowing Katniss and Peeta to use those berries to cheat the system.
Q:I am writing an annotated bib about this topic and I'm not sure where to start looking or what could and couldn't be considered as a theme.
Stephen Crane Works
Q:hi, i was just looking for a guide to change a full stock to a crane stock on an m4, (its wired to the back)i dont actually have the gun yet im buying it from a freind, so i havnt had a chance to look at it but the the gg gr16-r4i was wondering if its just a m4 with a stock that is wired to the back, how there is the two long screws that run from the back of the buffer tube to the body, then you just switch it out for a crane stock...anyway anything would be great, thanks
you need a crane stock and a buffer tube for it. the full stock does not use a buffer tube. you simply guide the wires through the buffer tube (once you attach it to the back) and into the stock. then just pu the stock on and put the batteries in and viola! crane stock!
Q:How about the installation and disassembly of the tower cranes?
Authorized by the national security inspection department, the local special operations training school or the technical quality supervision bureau, after the study, assessment, qualification and graduation permit, will give you special operations installation, removal operation certificate.
Q:anyone can tell me the common steel tube material using for crane boom, both main chord and lattice boom. thanks !
Steel, like you said, do you want an exact specification? That will vary by whether it is a very long and slender tall crane or a shorter heavy duty for considerable loads. It may even vary depending on whether the manufacturer has as a goal an extra light weight unit using more expensive stronger steel or is willing to use thicker walls to use more ordinary steel. That is what engineers are for.
Q:A crane operator was extended his Tadano crane boom(two section of boom out of five) at almost 0 degree boom angle. My question is-Is it safe to lift any load at 0 degree boom angle.
The answer is yes. The amount of the lift weight depends on the weight of the counter weights on the back of the crane. There is an indicator (printed or electronic) which indicates the maximum lift based on angle and extension. TexMav
Q:i have to make a children's story about how the whooping crane became endangered; (based on real facts) ideas?
Check out these books: The Whooping Crane by Alison Imbraico The Birds of Heaven by Peter Mathiessen Cranes by Janice Maryan Hughes The library should have some childrens books for you to look at. Hope this helps.
Q:Tower crane; command; gesture
1. prepare (note): arm extension, placed above the head, five fingers stretched out naturally, palm forward remain motionless.2. main hook: single hand natural fist, in the head, touch the head3. auxiliary hook: a hand clenched, small arm to immobile on the other hand, elbow, hand hand touch before.4. hook up: small arm to the side of the upper extension, five fingers natural extension, higher than the shoulder, with the wrist as the axis rotation.
Q:I remember it was either an anime/manga or a movie but a boy or girl makes a thousand paper cranes for someone who is dying (possible their mother). I'm pretty sure it's an anime. It's not the story about the little girl with leukemia, I know that. I also remember the little girl/boy putting them on the edge of the bed or something? It's not much to go by but if you can help me I would be eternally grateful.
In Kodomo no Jikan, Rin made paper cranes for her sick mother. Ghost in the Shell: Stand Alone Complex, and Sket Dance both had crane folding for sick persons, but they weren't mothers.
Q:He hasnt been in the military before, so how long would he be gone for boot camp and all that? What is the pay, does he get paid for going? I need to know it all. I am a stay at home mom that doesnt work, so we would need to earn money somehow.
earning okorder /

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords