TC5013A 6T Self Erecting Tower Crane with CE ISO Certificate
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Descriptions of our tower crane:
1, TC5013A have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 50m, TC5013A tower cranes are famous for their large operating ranges, varied working methods and wide uses.
2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.
3, It is original in design, reliable in operation and satisfactory in shape.
4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.
5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products
Advantage of our tower crane:
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2, suitable for the group of tower cross homework.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.
Features of our tower crane:
Independent height (m) | 40 | ||||||
Max height with attachment (m) | 121 | ||||||
Working range can be adjusted(m) | 40/50 | ||||||
Min working range(m) | 2.5 | ||||||
Max lifting capacity(t) | 6 | ||||||
Tip load @ 48m(t) | 1.3 | ||||||
Hoist mechanism | Falls | 2 | 4 | ||||
Lifting capacity(t) | 1.3 | - | 3 | 3 | - | 6 | |
Speed(m/min) | 9 | 38 | 80 | 4.5 | 19 | 38 | |
Motor | YZTD225L2-4/8 /32-24/24/5.4KW | ||||||
Trolleying mechanism | Speed(m/min) | 20/40 | |||||
Motor | YZTDE132S-4 /8-3.3/2.2KW | ||||||
Slewing mechanism | Speed(r/min) | 0.6 | |||||
Motor | YZR132M2-6-3.7KW | ||||||
Climbing speed(m/min) | 0.5 | ||||||
Counterweight(t) | 11 | ||||||
Mast section size(L×W×H)m | 1.6×1.6×2.5m | ||||||
Working temperature | -40-+60°C | ||||||
Total power (KW) | 34 | ||||||
Power supply requirement (KVA) | 180KVA for generator | ||||||
Cable type ( within 30 meters from site power source to lower electric box of tower crane ) | 50mm2(3+2, 5 cores) | ||||||
Startup voltage & current | 380V×95%=361V 285A | ||||||
Rated working voltage & current | 380V 65A
|
FAQ;
Q: What kinds of tower crane are available now?
A: Four main categories: normal tower crane with cat head, internal climbing tower crane , top less tower crane and luffing tower crane.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q:I'm a little confused as to what the difference is between the crane and the flare boom-____- I'm thinking that the flare boom is what they use to burn off oil I there's a fire, but is that right? And what does the crane do?
- Flares are used to burn off oil and gas that can not be transported to be processed without extensive costs. They can also be used at refineries as a safe way to release gas build ups in case of problems in the refining process occur. I imagine that a flare boom could be on the end of the crane but I know it's not always the case. The crane does what cranes do best... move things, usually from the ship to the platform or vise versa.
- Q:What windproof devices should be set up for crane work?
- 4. windproof anti-skid safety deviceThe utility model is a safety device for preventing the crane of the open-air work from sliding along the track under the action of strong wind, and the outdoor working track type crane shall be installed. The safety function of the utility model is that when the crane encounters the maximum wind force in the non working state, the crane is not blown to prevent the crane from overturning at the end of the rail. Common windproof devices include rail clamps, anchoring devices, and iron shoes.(1) rail clamping device: it is widely used in all kinds of outdoor track crane, its working principle is to use the two sides of a clamp rail head, the crane is fixed on the track through the combination of the clamping force, the crane can not slip. The design requirements of rail clamp, clamping force of rail clamp must be greater than the crane sliding force, to ensure that the local maximum wind, crane stays closed; rail tongs should rely on device components own weight or spring, and should not only rely on the driving effect of the power of the driving device, to to prevent the power supply is interrupted, the rail clamping device does not work; power driven rail clamping action should be behind the operation mechanism of brake action violently to eliminate possible crane brake.(2) anchor device: it uses a bolt or a flashboard device, a chain or a top pole to connect the crane and the track foundation into one body, and is used for fixing the crane in the big storm when not working. Since the anchor device can only be located in a certain position of the track, the crane can be anchored to this position, which is not suitable for immediate weather protection in an emergency.(3) iron shoes: it is a wedge device, when used, the wedge-shaped tongue inserted between the wheel tread and rail top surface, the iron shoes of the slope constitute the resistance to sliding wheels.
- Q:What kind of bodies are tower cranes made of?
- Tower crane is composed of three parts: working mechanism, metal structure and power unit, and control system. The composition and function of the three parts are outlined below.
- Q:I have a question about cranes...does anyone know what the maiximim weight is that they can lift. A friend and I were discussing this and i was just wanting to know if anyone might have the answer. Thanks guys
- Do not know where you live but I worked in a Shipyard in South Mississippi That had Cranes which picked up Modules which weighed 100 tons. Most were in the range of 50 to 70 tons the limiting factor was the range of the lift away from the crane. The further away from the Crane the less the load limit but the Cranes were rail mounted so they could traverse and carry the load anywhere. We had one Crane capable of handling 500 tons, a real monster. These are all located at Pascagoula Mississippi. Most were imported from Germany.
- Q:why the new york cranes collapsed?
- Gravity, that's basically why all things collapse. With cranes you also tend to have the issue of them being overloaded also but at the end of the day it's still gravity that's the enemy. There is some talk of a supporting strut having been damaged by a piece of falling metal and the crane toppling as a result of that but it's the first time I've ever come across a piece of lifting equipment, and that's what a crane is, reliant on just one component to keep it standing up. Always remember that gravity thing is out to get you.
- Q:My hubby just passed his crane test yesterday, and I was wondering how much they pay? He was told to ask for 50k a year..that includes crane time where he works. Can we really ask that? He sets trusses for a big lumber company in Missoula Mt. Any help would be great.
- The little that I do know is that it's one of the most dangerous jobs in the construction field including working around them...so it easily pays that much...
- Q:Please, if their is a site that shows how to build a crane, provide a link. btw: i do not want to buy some sort of crane building kit.Thanks
- Do you need to build it so it can pick stuff up, cause thats gonna require, magnets and alot of other stuff, that I don't feel like talking about, bye:(
- Q:What is the difference between lifting height of tower crane and independent height?
- Of course there is a difference. Independent height refers to the highest height of tower crane in its free state. Lifting height refers to the height of actual tower crane design.
- Q:Did Noah build the Ark with no power tools, nails, or crane?
- It's a myth, Noah never built an ark and anyone who believes that might as well believe in Santa Clause and the North Pole
- Q:I've been wondering and haven't been able to find any information on it. Where does the sky crane go after it drops off Curiosity? You see it fly off in all of the videos, but no information is given on where it goes? Does anyone know?
- It flies off a safe distance from Curiosity and then is allowed to crash. It's done its job and there's no reason to keep it around.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
TC5013A 6T Self Erecting Tower Crane with CE ISO Certificate
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords