Flanged Pipe Rubber Connection

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1 Piece pc
Supply Capability:
3000 Pieces per Month pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Pipe Connection: 

1.Certificate: ISO9001 and ISO14001

2.12 years OEM manufacture

3.DN32~5000mm

4.Third Party Quality Control

 

Description of Pipe Connection,pipe joint,pipe connection joint

 

a:It owns higher internal density to bear higher pressure as well as ideal elastic deformation.

 

b:It designs high radian section ,long curve,which has large displacement fuction

 

c:It is extremely suitable for geologic,large extend of sedimentation places and places are easy to be damaged due to frequent alternation of heat and coldness.

 

d:The elastic slide transfer and deformation of rubber and the heat dispersion of mechanical force may well prevent the physical damages from displacement of pumpd,valves and pipes.

 

e:As s poor conductor,it is an ideal environmental product to reduce the vibration and noise in transmission.

 

f:The product is designed with smooth inner walls,after testing,it is proved to have no influence on the flow speed and flux of the medium,and keeps stainless for ever,accordingly it will be free of maintenance in operation.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Why should you keep a fire extinguisher handy when making the classic dessert crepes flambé de l’orange?
Well I went to Hershey Park in PA and it was awesome 2 years ago, they were the best fireworks I ever saw. Probably the DisneyLand in L.A. will have some great ones to see though! Generally the theme parks have some great ones.
Q:what if they made a tire that when it snows.?
I'd guess very unlikely. If the cop saw you they probably wouldn't have wrote you up, but once they did they did, and you can't prove that you were in the vehicle (so you could have moved if the fire department arrived), so to them you were impeding the potential safety of others by blocking the hydrant. Being a father who's been there with puking kids in the car I feel bad for you, but my guess is you'll lose. You can try though - maybe you'll get lucky?
Q:What are some science lab rules?
A muff is a fitting used for joining pipes without threads
Q:POLL: Have you ever wore your clothes swimming?
Fall is definitely my favorite season.especially for romance. The changing leaves, the warm days and cool nights, it gets darker earlierI can't explain it.
Q:IF I USE A KEY ON A HOUSE DOOR THAT HAS AN ALARM?
7018 isn't well suited for vertical-down root passes, due to it's heavy, sluggish, fast-freezing slag. The thick heavy slag tend to cause inclusions when trying to fill an open root gap on pipe. It's traditional to use 601/6011 for the root pass, because it performs far better for open roots, 7018 is used for the filler passes. It's also traditional to use TIG for the root which generally produces far better root quality than stick welding. the root pass is critical because the greatest stress is on the inside of the pipe. If welding is absolutely your only option the best quality will be had by TIG welding the root, instead of 6010/6011. I would strongly recommed TIG roots. It is quite difficult to get a consistent root pass on small pipes. With pipe welding quality prep work and accurate fit-up are extremely important. Furthermore for small pipes, using screw-on fittings will likely save you labor in the long run. Not to mention being probably the more reliable option. Using a pipe vice and a pipe threading tool takes less time and skill than properly done fitting and welding. You might also consider brazing with slip-on joints. Brazing is faster, easier, and generally less prone to leaks than welding.
Q:I've a dishwashing job?
Within the AHU ther are whats called Dampers a device that is designed to stop the spread of fire normally on the air intake side of the ahu as opposed to the extract side of the system. The BMS is where the system programming is and there are many variations of different logics and situations. Simply you will have a smoke detector of some kind in the AHU, and when smoke is detected it sends a signal to the BMS and closes the Damper and / or the Air intake Fan. Probebly from the design of the system smoke detectors are placed in the higher risk places of the system. Hope this helps, I work on these systems all the time. Neil
Q:Are snow chains better than snow cables for icy roads?
When we moved three years ago I turned in four fully charged but outdated fire extinguishers to my local Fire Dept. They, in turn, handed them off to their fire extinguisher supplier for disposal. When I worked at an aircraft maintenance facility we would remove the valves from obsolete extinguishers - drill a hole in them - and put them in the scrap metal bins. The bottoms made fairly decent ashtrays when they were cut off. The pencil holder on my desk is a cut down 5 pound brass extinguisher base.
Q:Kidde 1275 smoke detector going off ?
Wow, that just doesn't make any sense. I would call a handyman immediately and see if there is a problem with your wiring. Depending on your abilities, I would disengage it from the house wiring and replace it with a standard battery powered smoke alarm. Whatever is wrong with it, it is not reliable and it needs repair or replacing.
Q:How to fix my factory car alarm ~ 2000 Pontiac Sunfire GT?
The water service to your house is usually Schedule 40, while irrigation piping is usually Schedule 20. Both schedules use the same fittings. The two are fairly interchangeable, with the schedule 20 being a few cents cheaper per foot and a little more flexible.
Q:sharing the network?
IS 1239 : Part 1~Steel Tubes, Tubulars and Other Wrought Steel Fittings - Specification - Part 1 : Steel Tubes IS 1239 : Part 2~Mild steel tubes, tubulars and other wrought steel fittings, Part 2 Mild steel tubulars and other wrought steel pipe fittings First IS code will serve your purpose.standardsbis.in/Gemini/search
Our products are of advanced design, rational structure, stable performance, and flexible and high anti-fatigue properties. With our quality assurance system, we improve comprehensive test means and attain the ISO9001 quality system certification and pressure pipe component production license.

1. Manufacturer Overview

Location Jiangsu, China (Mainland)
Year Established 2004
Annual Output Value
Main Markets North America
South America
Eastern Europe
Southeast Asia
Africa
Oceania
Mid East
Eastern Asia
Western Europe
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage 41% - 50%
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size: 5,000-10,000 square meters
No. of Production Lines 5
Contract Manufacturing OEM Service Offered Buyer Label Offered
Product Price Range