Rubber Roofing Underlayment

Hot Products

FAQ

Bathroom first leveling or do waterproof, what is the difference
Is the first water and then leveling. Home improvement toilet ground specific process practice: 1. The base layer, and which layer with the structural board, with cement mortar wipe. It is recommended to set the floor drain, the grassroots level should be flat and the direction of the leak to the slope. Against the wall and the root of the root should be wiped rounded.
What material is used for waterproofing of tarpaulin
Due to the cement-based products, will not cut off the structure of the connection waterproof layer of good wear resistance, can not protect the layer
How to ensure the waterproof quality of the underground shear wall (retaining wall)?
5, in strict accordance with the underground waterproofing procedures for concrete construction and construction of waterproofing membrane, a reasonable set of settlement and construction joints, to reduce the structure of the crack; for the structure of stubble, settlement joints, construction joints to take the necessary waterproof measures (additional Waterproof layer or set the water-stop plate, water strips, etc.). 6, to strengthen the hidden acceptance, the good quality off.
Roof for the insulation, Master roof, using two waterproof construction program
Construction of roof waterproofing membrane First, the process (hot melt construction) Clean up the grass-roots → brushing the primary treatment agent → paving the film additional layer → paving the film → hot melt sealing side → water test → protective layer
Cabinet is to buy finished products, or directly to the decoration company to do?
Do the cabinet can be in accordance with your size, finished cabinet moldy, which is not necessarily. You have to buy some of the Well
Hello, roof with SBS waterproof material bulk density is how much?
As the SBS coil finished with pure asphalt is not the same, the coil includes a variety of surface material weight. The following is the different types and different thickness of the SBS coil unit area weight, due to the need to lap and pave the reinforcement layer, calculate the load in the following unit area weight, the general multiplied by 1.2 coefficient.
What decoration materials, light and water, and the wall, the perfect combination of glass
Second, cover the surrounding surface With the tape or the US profile of paper to cover the surface of the interface surface, according to the width of the gap to keep the gap width, width uniformity to ensure that the sealing of the work lines neat and perfect;
Can acrylic materials be perforated? How to do waterproof after punching?
Anti-corrosion nine PCT board size is greater than the size of the hole, that is, just in the hole on the nine-plate, This can play a certain role in strengthening.