• Roofing Felt Synthetic Underlayment for Use Under Shingles,Tile,Metal or Slate System 1
  • Roofing Felt Synthetic Underlayment for Use Under Shingles,Tile,Metal or Slate System 2
Roofing Felt Synthetic Underlayment for Use Under Shingles,Tile,Metal or Slate

Roofing Felt Synthetic Underlayment for Use Under Shingles,Tile,Metal or Slate

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
25 m
Supply Capability:
30000 m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Synthetic Roof Underlayment Series

 

Specifications     ——————————————————————————————————————————————

 

Synthetic roofing felt 
Material: PP/PE polyer, aluminum foil & nonwoven textile 
Surface: available in nonwoven textile, aluminum film, or embossed patterns 
Usage: underlayment in green roofs, planting roofs, basement, subways, tunnels, etc.

Light loading & low cost

 

General Introduction     ——————————————————————————————————————————

Synthetic roof underlayment is made from multiple−ply  different materials. Its  aging and weathering  resistance  layer enabling the membrane being the ideal accessory of asphalt shingles and other roof tiles.

Synthetic underlayment is widely used with asphalt shingles, wood shakes, non-structural metal roofing, and synthetic and quarry slate roofing. It is both lighter and stronger than organic underlayment

 

Features & Benefits  —————————————————————————————————
       

  • UV stabilized and rated for one year exposure

  •  Printed with nail patterns and alignment guides

  •  For quick and easy installation

  •  25-year warranty 

 

Classification     ——————————————————————————————————————————————

1. PE Plus A

Model No.: HYM-002

Material: PP/PE polymer & aluminum foil

Surface: aluminum foil

Weight: 300g/sqm~400g/sqm

Roll size: 48inch x 250 feet

 

Roofing Felt Synthetic Underlayment for Use Under Shingles,Tile,Metal or Slate

 

Roofing Felt Synthetic Underlayment for Use Under Shingles,Tile,Metal or Slate

 

Q:Why do the basics of the cushion waterproofing
Base cushion waterproofing is not contact with the soil (Ying water) to prevent water into the cushion, but in the cushion and the base of the bottom of the contact, in fact, is the basis of the bottom of the waterproof.
Q:What is the waterproof layer and the waterproof cushion in the tile roof?
In the tile roof, to wait for the waterproof layer after the dry layer, or prone to the phenomenon of wall off. Waterproof layer set and standard construction methods: to be painted 2 to 3 times, or should be added fiberglass cloth, and each brushing the thickness of the cured material shall not be less than 1 mm, and should be completely dry (about 5-8 Hour) and then the next construction. After brushing, but also in the paint waterproof layer to do a mortar protective layer, and finally paste the tile.
Q:Is the raft cushion waterproofing full of the cushion?
Assuming (just suppose) the raft can easily turn over, then we do waterproof (like roof) directly on it, not waterproof on the cushion.
Q:Foam concrete for the roof cushion generally do much bulk ah
First help you correct it, foam concrete used in the roof should be the role of thermal insulation, not as a cushion.
Q:What is the relationship between the cushion and the ring beam?
Cushion is plain concrete or asphalt concrete (for groundwater soil corrosive strong site). Is located below the ground, in order to prevent the foundation or the concrete beam pouring when the excessive loss of water caused by defects set. The purpose is to ensure the quality of concrete, increase the durability of underground components
Q:Do you need a cushion on the ground floor?
In addition to wood also buy wooden side, used as the main beam, beam and pillars. The ground is also recommended to raise, raise the place also to beam and pillars The number of boards to be based on your design to determine the ground practice, roof practices will affect the number of wood
Q:Cushion, waterproof layer construction to do what information
4, waterproof layer set and standard construction methods: to be painted 2 to 3 times, or should be added fiberglass cloth, and each brushing the thickness of the cured material shall not be less than 1 mm, and should be completely dry (about 5 -8 hours) and then the next construction. After brushing, but also in the paint waterproof layer to do a mortar protective layer, and finally paste the tile.
Q:Maintenance time of the cushion on the roof of the building
According to the "concrete structure construction quality acceptance criteria" provides: Concrete should be poured within 12h after the completion of the concrete to be covered, and moisturizing conservation;
Q:Basement cushion waterproof
Third, the membrane waterproof in the construction should first do the basement floor of the waterproof, and then the membrane along the basement floor continuous paste to the outer surface of the wall. Basement floor waterproofing first in the foundation pouring C10 concrete cushion, the thickness of about 100mm. And then paste the membrane, and then in the coil to wear 20 thick 1: 3 cement mortar, and finally pouring reinforced concrete floor. The outer surface of the wall first wip 20mm thick 1: 3 cement mortar, cold base oil, and then paste the membrane, the membrane should be stitched paste, adjacent coil lap width of not less than 100mm. The top of the coil should be higher than the maximum water level of about 500mm, the outer side of the brick wall.
Q:Can the floor tiles be removed from the cement mats on the prefabricated board floor?
You can dig, but be careful not to use a strong earthquake with the machinery to remove, otherwise it will damage the original structure.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords