Dicl Pipe

Hot Products

FAQ

To warm or water pipe leakage from the time of the warranty period
Hot work
To warm the company which installed the best
To warm is a complex system, the installation of a large number of components to choose, even if the product quality is good, but the performance of lamb bite to find the rescue is to find that if the installation is not in place or very easy to problems, or to the old, professional big company There is a guarantee.
What nature or the usual place of installation
HVAC projects include ventilation and air conditioning works and heating works.
Rooftop electric film from the heating how?
In the early years, many of the time to do so, but the effect is not good, are now doing on the ground.
Does the warmer filter have anti-water effects?
The filter does not have a one-way reverse action. The warmer filter is a look that looks like a tee, but the slip is plugged up. The main role of the filter is: to prevent impurities in the heating system into the boiler or other parts, to avoid damage to parts.
What is the geothermal decoration process?
General geothermal installation of the construction steps: the first step to heat the first pavement to clean up the ground, pay attention to the corner clean up, to ensure that enough to allow enough expansion joints. The second step in the ground layer of plastic sheeting to isolate the moisture, let the plastic cloth in the four corners were higher than the ground 10cm. The third step to lay the mats. Note that to leave the expansion joints, the interface at least overlap 5cm, and must be sealed with a good tape. Use skirting boards that are thicker than ordinary floors and need to be built independently. After 24 hours of installation, the floor can be heated. In order to facilitate the heat, the cushion material should not be too thick. Common sense: to use geothermal floor special glue; can not shop pads; can not play keel, because this gap will leave the air, air thermal conductivity is low, is not conducive to heat transfer. Floor and floor between the mat can not use ordinary foam mats, be sure to use geothermal paper mats, because this mat heat conduction, no deformation. Ordinary foam mat heat slowly, long-term high temperature conditions, easy to produce harmful gases, endangering the health of users. Whether it is water heat radiation heating or cable heating heating system touch usurped Du Gu Sen Sen single system, do not live in the field on the ground furnace, electric furnace, etc., because the surface temperature is too high, then the ground under the aluminum-plastic composite pipe May melt. Geothermal flooring Due to the specificity of its function and the complexity of geothermal system, compared with ordinary flooring, geothermal floor maintenance and maintenance has its own unique, in the heating and moisturizing to pay special attention.
What are the heating components of the heating system design?
In the design of the design, the design of the heating system is based on the basic heat consumption and the additional (corrected) heat dissipation of the envelope. The basic heat consumption refers to the sum of the stable heat transfer from the room to the outside through the various parts of the room envelope (doors, windows, walls, floors, roofs, etc.) under design conditions. Additional (modified) heat consumption refers to the heat transfer of the envelope structure changes the basic heat consumption to correct the heat consumption. Additional (corrected) calorie consumption includes the amount of heat applied to the correction, wind addition, height addition and external door addition.
Home new house ready to install warm, to ask a few, each pipe is not the same, and the price difference is also more, do not know the clerk said that the ravages of the destruction of the slander, It is difficult to judge Yeah, there is a friend know, or the home installed to mention the comments, more urgent ah! The More
As long as the PERT material can be