Ceiling Grids/exposed Ceiling T-bar System

Ref Price:
$0.10 - 1.00 / pc
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
10000 pc
Supply Capability:
300000 pc/month
  • OKorder Service Pledge
  • Quality Product
  • Order Online Tracking
  • Timely Delivery
  • OKorder Financial Service
  • Credit Rating
  • Credit Services
  • Credit Purchasing

Add to My Favorites

Follow us:

Grille ceiling system enables open ceiling plane constructions, offering a wide variety of cells and patterns for maximum freedom of design. Our panels are created with a proprietary manufacturing process that ensures clean lines and durability.

 

Product Applications:

1) Supermarket, marketplace
2) Service station, toll station
3) Underground, air port, bus station 
4) School, office, meeting room
5) Hall, corridor and toilet
6) Sport center

 

Product Advantages:

1. Convenience in installation, it shortens working time and labor fees.

2. Neither air nor environment pollution while installing. with good effect for space dividing and beautifying. 

3. Using fire proof material to assure living safety.

4. Can be installed according to practical demands.

5. The physical coefficient of all kinds Suspension Ceiling grid are ready for customer and designers' reference and request.

 

Main Product Features:

 

1) Surface smoothness and easy cleaning
2) High precision, lighter weight, higher strength, better rigidity
3) Strong corrupt proof, weather proof and chemical
4) Easy to match lamps or other ceiling parts 
5) Flexible suspension system make each ceiling tiles easy install and disconnect

Product Specifications:

 

Ceiling Grids/exposed Ceiling T-bar System

 

FAQ:

 

Q:How many the warranty years of your products?
A:15 years for indoor used,20 years for ourdoor used.


Q:Can you show me the installation instruction?
A:Yes,our engineering department is in charge of helping your installation.any question,you can let me know.

Images:

 

Ceiling Grids/exposed Ceiling T-bar System

Ceiling Grids/exposed Ceiling T-bar System

Ceiling Grids/exposed Ceiling T-bar System

Ceiling Grids/exposed Ceiling T-bar System

 

Q:Material u-type 50 series light steel keel in the main keel specifications is how much
Simply talk to you about the connection between the keels: the boom with a bolt bolts fixed on the floor, with T-type keel hanging pieces connected T-shaped main keel, T-keel for long, in its interface with T-keel connections fixed, between the keel and the main keel is connected between the plug, you can not accessories. If the ceiling has an additional load or a large area of the ceiling, you need U-bearing keel, that is, after the installation of the boom, first with U-shaped keel (main keel) hanging pieces will U-shaped main keel and boom connection, T-type keel pendant connects the T-shaped longitudinal keel with the U-shaped main keel ... 1, T-type keel hanging pieces: for the T-type main keel and boom connection. Applicable only to non-loaded keel without additional load of the ceiling. 2, T-type keel connection: for the vertical T-keel that is the main keel connection. 3, U-type keel hanging pieces: for connecting the carrying keel (main keel) and boom. 4, T-type keel pendant: for U-type light steel keel and T-type longitudinal keel connection. 5, U-shaped main keel connection: for the U-type carrying keel of the long.
Q:We have a drop ceiling but rather large holes for the many light fixtures (at least 20, like a grid of light bulbs as decoration) in our basement. The holes are about 2 inches in diameter and the light bulb doesn't fill up the holes completely. Is it safe to live down here without removing the insulation?
It's not clear from your description if you have recessed lights or not. Recessed lights can have an IC rating meaning you can put insulation right next to or over the recessed lights (IC stands for insulation contact). If the recessed lights aren't IC rated, then you have to leave a gap of 3 between the fixture and the insulation. Regardless of the above, you can always switch to compact fluorescent or LED bulbs which will generate far less heat for a given amount of light.
Q:Gypsum board shed light steel keel production
1.2 thick gypsum board plus 4 yuan per square, does not include paint.
Q:Mainly check the contents of which piece of people
Construction side to do the hidden information
Q:T-type light steel keel tb24 * 38 what does it mean
T-type is not on the person, the width of 24mm, height 38mm is the T-type main keel
Q:Want to install track lighting on a dropped ceiling in the cellar. It's one of those lovely styrofoam-like tiled ceilings with the metal grid.
yes u can u can either do one of two things 1) use small self cutting screws to attach it...if you dont plan on taking it down for a long time and dant care about a few holes in it later or 2) they sell a small clip that attaches to the grid, it has a small threaded peice that will go into the track lighting and secures with a nut
Q:How do I install dropped ceiling in basement?
Get your layout, mains will run every 4 feet perpendicular to your beams. You need a wire every 4 foot down each line a main will run. You can attach the the wires that hold up your mains to your joist by looping them over a beam or you can get screw eyes and screw them into your beam and run your wire through the eye of the screw. Ties these wires and leave them hanging down about 8 below your desired ceiling height. Get a level mark 1 above the height you want your ceiling in 2 corners, pop a chalk line and screw your wall molding with the top touching the chalk line you popped. If you are new at this the easiest way to start your layout is to cut the tab off 1 end of the mains, put the cut end on your wall molding attach a hanger wire to hold the main in place. Do the same with another main and hang. Measure 4 foot from the wall mold and snap in a 4' tee to connect the 2 mains together. Tees will go every 4 foot connecting the mains to each other. Then snap in a 4' tee between the 4'ts in the same direction of the mains. This creates a 2x4 grid pattern. If you want 2x2 grid you will insert 2' tees in between the 4' tees. You will need to tie the hanger wires into the mains and remember to keep them level. (run a string from side to side to keep level if you don't have access to a laser). Also remember to check your grid to make sure you are keeping it squared, measure a 2x4 rectangle from corner to corner diagonally to make sure each measurement is the same. (dropping in a tile from time to time will help you keep square as you go. main.main.main.main.main.main t .............t..............t.............. e.(4' tee)..e.(4'tee)...e.(4'tee)...e.(4'tee) e ............e.............e............e... main.main.main.main.main.main
Q:Light steel keel partition keel spacing 300, the number of meters per square meter vertical keel?
Operating conditions 1. Light steel frame, gypsum cover panel wall construction should be completed before the basic acceptance work, gypsum cover panel installation should be to the roof, roof and wall plaster after completion. 2. Design requirements When the wall with a pillow, should be built to the pillow belt construction, and to achieve the design level, before the installation of light steel skeleton. 3. According to the design and construction plans and materials plan, check the wall of all the materials, so that it is fully equipped.
Q:Light steel keel welding between what method?
(1) the main keel should hang hanging on the boom, the main keel spacing of 900 ~ lOOOmm. The main keel is divided into two kinds of human UC38 keel, superior UC60 keel. The main keel should be parallel to the room long to An Pei, at the same time should be arch, from the arch height of the room span of 1/200 ~ 1/3000 main keel cantilever should not be greater than 300mm, or should increase the boom main keel should be long Take docking, adjacent keel docking joints to be staggered from each other. After the main keel hanging should be basically flat. (2) span greater than 15m above the ceiling, should be on the main keel, every 15m plus a large keel, and vertical main keel welding firm. (3) If there is a large modeling ceiling, the shape part of the application of angle steel or flat steel welded into a frame, and should be connected with the floor firmly.
Q:Construction Technology of Silicon and Caelite Ceiling in Light Steel
Construction process: ?? Bracelet → Striper Slot → Install keel → Install calcium silicate board

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request